Masonry : Category I
Mortar origin : Prescribed mortar
Masonry strength fb = 2.00 MPa
Mortar strength fm = 2.50 MPa
Parameters
Compressive strength fk = 0.96 MPa
Shear strength fvko = 0.10 MPa
Flexural tensile strength fxk = 0.05 MPa
Partial factor gM = 2.20
Geometry of structure
Coordinate Depth
No.
X [m] Z [m]
1 0.00 0.00
2 0.46 2.00
3 -0.68 2.00
4 -0.60 0.00
The origin [0,0] is located at the most upper right point of the wall.
Wall section area = 1.74 m2.
1
[GEO5 - Gravity Wall | version 5.2020.6.0 | hardware key 8665 / 1 | Department of Public Works and Highways | Copyright © 2019 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
[InfraSys | + 63 2 477 9809| info@infrasys.com.ph| http://www.infrasys.com.ph/]
Proposed Stone Masonry
ALONG MANILA BATANGAS BYPASS
Soil parameters
Clayey sand (SC)
Unit weight : g = 18.00 kN/m3
Stress-state : effective
Angle of internal friction : jef = 36.00 °
Cohesion of soil : cef = 8.00 kPa
Angle of friction struc.-soil : d = 36.00 °
Soil : cohesive
Poisson's ratio : n = 0.30
Saturated unit weight : gsat = 18.00 kN/m3
Foundation
Type of foundation : soil from geological profile
2
[GEO5 - Gravity Wall | version 5.2020.6.0 | hardware key 8665 / 1 | Department of Public Works and Highways | Copyright © 2019 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
[InfraSys | + 63 2 477 9809| info@infrasys.com.ph| http://www.infrasys.com.ph/]
Proposed Stone Masonry
ALONG MANILA BATANGAS BYPASS
Terrain profile
Terrain behind the structure is flat.
Water influence
Ground water table is located below the structure.
Verification No. 1
Pressure at rest on front face of the structure - partial results
Layer Thickness a jd cd g Kr Comment
No. [m] [°] [°] [kPa] [kN/m3]
1 1.00 2.29 36.00 8.00 18.00 0.429
Pressure at rest distribution on front face of the structure
Layer Start [m] sZ sW Pressure Hor. comp. Vert. comp.
No. End [m] [kPa] [kPa] [kPa] [kPa] [kPa]
0.00 0.00 0.00 0.00 0.00 0.00
1
1.00 18.00 0.00 7.74 7.71 0.72
Active pressure behind the structure - partial results
Layer Thickness a jd cd g dd Ka Comment
No. [m] [°] [°] [kPa] [kN/m3] [°]
1 0.99 12.95 36.00 8.00 18.00 36.00 0.363
2 1.01 12.95 36.00 8.00 18.00 36.00 0.363
Active pressure distribution behind the structure (without surcharge)
A minimum dimensioning pressure Ta=0.20*Sigma,Z was considered when computing the total pressure.
3
[GEO5 - Gravity Wall | version 5.2020.6.0 | hardware key 8665 / 1 | Department of Public Works and Highways | Copyright © 2019 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
[InfraSys | + 63 2 477 9809| info@infrasys.com.ph| http://www.infrasys.com.ph/]
Proposed Stone Masonry
ALONG MANILA BATANGAS BYPASS
Pressure profile due to surcharge - Traffic and Super Dead Load (250 psf)
Point Depth Hor. comp. Vert. comp.
No. [m] [kPa] [kPa]
1 0.00 0.00 0.00
2 0.00 0.00 0.00
3 0.92 0.00 0.00
4 0.92 1.72 1.98
5 0.99 1.72 1.98
6 0.99 1.80 2.07
7 2.00 1.79 2.06
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -0.90 40.02 0.48 1.000
FF resistance -3.85 -0.33 0.36 0.01 1.000
Active pressure 2.17 -0.34 2.50 1.06 1.000
Traffic and Super Dead Load 1.92 -0.53 2.22 1.02 1.000
(250 psf)
Verification of complete wall
Check for overturning stability
Resisting moment Mres = 24.31 kNm/m
Overturning moment Movr = 0.47 kNm/m
Eccentricity verification
Max. eccentricity of normal force e = 0.036
4
[GEO5 - Gravity Wall | version 5.2020.6.0 | hardware key 8665 / 1 | Department of Public Works and Highways | Copyright © 2019 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
[InfraSys | + 63 2 477 9809| info@infrasys.com.ph| http://www.infrasys.com.ph/]
Proposed Stone Masonry
ALONG MANILA BATANGAS BYPASS
Dimensioning No. 1
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -0.05 1.39 0.31 1.000
Active pressure 0.00 -0.10 0.00 0.60 1.000
Traffic and Super Dead Load 0.00 -0.10 0.00 0.60 1.000
(250 psf)
Wall check at the construction joint 0.10 m from the wall crest
Cross-section depth h = 0.63 m
Ultimate compressive force NRd = 270.04 kN/m > 1.39 kN/m = NEd
Ultimate moment MRd = 0.43 kNm/m > 0.01 kNm/m = MEd
Cross-section bearing capacity is SATISFACTORY
1.39
0.10
+x
+z
2.00
1.14
5
[GEO5 - Gravity Wall | version 5.2020.6.0 | hardware key 8665 / 1 | Department of Public Works and Highways | Copyright © 2019 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
[InfraSys | + 63 2 477 9809| info@infrasys.com.ph| http://www.infrasys.com.ph/]
Proposed Stone Masonry
ALONG MANILA BATANGAS BYPASS
Stability analysis
Earthquake analysis : Standard
Verification methodology : Safety factors (ASD)
Safety factors
Permanent design situation
Safety factor : SFs = 1.50 [–]
Interface
Coordinates of interface points [m]
No. Interface location
x z x z x z
1 -10.00 -1.00 -0.64 -1.00 -0.60 0.00
0.00 0.00 12.53 0.00
6
[GEO5 - Gravity Wall | version 5.2020.6.0 | hardware key 8665 / 1 | Department of Public Works and Highways | Copyright © 2019 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
[InfraSys | + 63 2 477 9809| info@infrasys.com.ph| http://www.infrasys.com.ph/]
Proposed Stone Masonry
ALONG MANILA BATANGAS BYPASS
Soil parameters
Clayey sand (SC)
Unit weight : g = 18.00 kN/m3
Stress-state : effective
Angle of internal friction : jef = 36.00 °
Cohesion of soil : cef = 8.00 kPa
Saturated unit weight : gsat = 18.00 kN/m3
Rigid bodies
g
No. Name Sample
[kN/m3]
7
[GEO5 - Gravity Wall | version 5.2020.6.0 | hardware key 8665 / 1 | Department of Public Works and Highways | Copyright © 2019 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
[InfraSys | + 63 2 477 9809| info@infrasys.com.ph| http://www.infrasys.com.ph/]
Proposed Stone Masonry
ALONG MANILA BATANGAS BYPASS
8
[GEO5 - Gravity Wall | version 5.2020.6.0 | hardware key 8665 / 1 | Department of Public Works and Highways | Copyright © 2019 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
[InfraSys | + 63 2 477 9809| info@infrasys.com.ph| http://www.infrasys.com.ph/]
Proposed Stone Masonry
ALONG MANILA BATANGAS BYPASS
Surcharge
Location Origin Length Width Slope Magnitude
No. Type Type of action
z [m] x [m] l [m] b [m] a [°] q, q1, f, F q2 unit
1 strip permanent on terrain x = 1.27 l = 11.26 0.00 12.00 kN/m2
Surcharges
No. Name
1 Traffic and Super Dead Load (250 psf)
Water
Water type : No water
Tensile crack
Tensile crack not input.
Earthquake
Earthquake not included.
Settings of the stage of construction
Design situation : permanent
Results (Stage of construction 1)
Analysis 1
Circular slip surface
Slip surface parameters
x= -0.38 [m] a1 = -45.29 [°]
Center : Angles :
z= 1.61 [m] a2 = 64.28 [°]
Radius : R= 3.71 [m]
The slip surface after optimization.
Slope stability verification (Bishop)
Sum of active forces : Fa = 36.24 kN/m
9
[GEO5 - Gravity Wall | version 5.2020.6.0 | hardware key 8665 / 1 | Department of Public Works and Highways | Copyright © 2019 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
[InfraSys | + 63 2 477 9809| info@infrasys.com.ph| http://www.infrasys.com.ph/]
Proposed Stone Masonry
ALONG MANILA BATANGAS BYPASS
10
[GEO5 - Gravity Wall | version 5.2020.6.0 | hardware key 8665 / 1 | Department of Public Works and Highways | Copyright © 2019 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
[InfraSys | + 63 2 477 9809| info@infrasys.com.ph| http://www.infrasys.com.ph/]