You are on page 1of 24

SAURABH

ENTERPRISES
WORK EXPERIENCE
1. Construction of Proposed School Complex IN Phase-II & Phase-III in Lucknow(U.P)
Total Estimated cost of the building is ₹ 1,52,38,171.89

2. Construction of Boundary Wall Proposed Ashram complex and Temple in Sitapur (U.P)
Total Estimated cost of the building is ₹ 53,44,287.50

3. Construction of 11 Barrel 3 X 2.5 m Box Culvert In PMGSY Project No UP13161 in


Barabanki District, Harakh Block in Uttar Pradesh
Total Estimated cost of the Culvert is ₹ 1,10,16,181.35

4. Construction of 2.5 Km U-Drain In PMGSY Project No UP1395 in Barabanki


District, Ghusepur Block in Uttar Pradesh
Total Estimated cost of the Culvert is ₹ 60,16,181.35
5. Construction of 0.5 Km Boulder Pitching In PMGSY Project No UP1395 in Barabanki
District, Ghusepur Block in Uttar Pradesh

6. Construction of 3x2000 & 4 x 1000 HP Culvert In PMGSY Project No UP12856 in Raebariely


District, Uttar Pradesh

7. Construction of 1 Barrel 3x3 Slab Culvert In PMGSY Project No UP12856 in Raebareli


District, Uttar Pradesh
1. Construction of Proposed School
Complex IN Phase-II & Phase-III in
Lucknow(U.P)
Total Estimated cost of the building
is ₹ 1,52,38,171.89
2. Construction of Boundary Wall Proposed
Ashram complex and Temple in Sitapur
(U.P)
3. Construction of 11 Barrel 3 X
2.5 m Box Culvert In PMGSY
Project No UP13161 in
Barabanki District, Harakh
Block in Uttar Pradesh
4. Construction of 2.5 Km U-
Drain In PMGSY Project No
UP1395 in Barabanki
District, Ghusepur Block in
Uttar Pradesh
5. Construction of 0.5 Km
Boulder Pitching In PMGSY
Project No UP1395 in
Barabanki District,
Ghusepur Block in Uttar
Pradesh
6. Construction of 3x2000 & 4 x
1000 HP Culvert In PMGSY
Project No UP12856 in
Raebariely District, Uttar
Pradesh
7. Construction of 1 Barrel 3x3
Slab Culvert In PMGSY Project
No UP12856 in Raebareli
District, Uttar Pradesh

You might also like