Checklist for Installation of Earthing & Bonding System
ICL No.: TIPP6A-KIC-MS-E-05
IR Ref. No.:
Rev.

SI. no. Items Checked Remarks

Material received in good condition Ensure the materials are stored properly and there
1
is no mark of damage or deformity.

2 Check the material used in installation as approved, correct type and size.

3 Check the installation as per approved drawing.

4 size of copper tape & cables

5 Mesh Spacing

All visible conductor are fastened to mount surface at recommendation intervals


6

proper fixing of Air Terminal.


7

8 No Sharp Edges

9 No Part of This System has been weakene by Corrosion

Continuity Test Reading


10

Electrode, pit, cables & Accessory Size and Brand


11

12
Electrode Spacing and Connection.

13 Installation of Electrode depth as per recommendation

14 Electrode Resistance Reading

Checked & verified By:

KABRI Engineer: Client / Consultant:

Name & Signature Name & Signature

Date Date