Professional Documents
Culture Documents
Department of Education
REGION VI – WESTERN VISAYAS
DIVISION OF ESCALANTE CITY
KRA Targets Actual % Hindering factors Facilitating Intervention/ Timelines (To the
Accomplishment Accomplishment (major findings Factors Activities/ interventions and
and possible Strategy activities
causes of recommended)
problems, issues
and challenges
I. Instructional
Management
1. Develop Due to lockdown, Skeletal staff Pilot Testing only March 6, 2020
contextualized 8 5 63% Division QA were
offline/online not able to
learning resources conduct
2. Identification of Reference
essential learning materials of Regional
competencies 8 8 100% teachers is in Teleconference March 31,2020
available or not Lockdown ( EHQ) their classroom, with Regional
available online or
internet EPS
in Deped Learning
Portal
connectivity is
poor)
2. If not available, Lockdown ( EHQ Reference Regional
creation of quality 8 8 100% materials of Teleconference
assessed TDLRs teachers is there with Regional April 28, 2020
like modules . classroom, EPS
internet
connectivity is
poor)