Social Inclusiveness Score Passed - Review existing policies (IREAP Manual and Cooperative Code) The current Manager of regarding possible the Cooperative is an elements of conflict of employee (job order) of interest due to the the Municipal Agriculture current set-up of the Organizational Structure Office. He is also in-charge organization. of the said Cooperative as - If the current set-up part of his regular function violates existing policies, in the Municipal Agriculture the Board of Directors office. should convene and address the identified issue to be eligible for funding. The proposed site is - The duration of usufruct owned by the Municipal agreement should not Government of Magsaysay. less than 15 years and Proposed site for the Accordingly, a usufruct the signed agreement processing center agreement will be must be submitted as executed to allow part of the requirements temporary use of the for NOL 1. property for the project. - Kindly consider appropriate mitigation The proposed site is measures as required by Hazard Assessment generally susceptible to the National Building (source: Hazard Hunter) liquefaction Code and the Structural Code of the Philippines
The proposed site is Areas with moderate
susceptibility to floods are likely to experience flood heights of 0.5 meters up to 1 meter and/or flood duration of 1 to 3 days. These are subject to widespread inundation during prolonged and extensive heavy rainfall or extreme weather conditions. Fluvial terraces, alluvial fans, and infilled valleys are also moderately moderately susceptible to subjected to flooding. flooding; 0.5 to 1.0 meter flood height and/or 1 to 3 The implementation of days flooding appropriate mitigation measures as deemed necessary by project engineers and LGU building officials is recommended for areas that are susceptible to various flood depths. Site- specific studies including the assessment for other types of hazards should also be conducted to address potential foundation problems. The proponent should Environmental and Social prepare and submit an Safeguards Screening of Passed Environmental and Social Subproject Management Plan