You are on page 1of 2

Social and Environmental Safeguards

Proponent Group Validation Report

Name of PG : Mindulao Farmers Agrarian Reform Community Cooperative


Location : Brgy. Mindulao, Magsaysay, Misamis Oriental
Subproject : Coconut Nectar Processing and Marketing Enterprise

Section/Particulars Observations Recommendations


Social Inclusiveness Score Passed
- Review existing policies
(IREAP Manual and
Cooperative Code)
The current Manager of regarding possible
the Cooperative is an elements of conflict of
employee (job order) of interest due to the
the Municipal Agriculture current set-up of the
Organizational Structure Office. He is also in-charge organization.
of the said Cooperative as - If the current set-up
part of his regular function violates existing policies,
in the Municipal Agriculture the Board of Directors
office. should convene and
address the identified
issue to be eligible for
funding.
The proposed site is
- The duration of usufruct
owned by the Municipal
agreement should not
Government of Magsaysay.
less than 15 years and
Proposed site for the Accordingly, a usufruct
the signed agreement
processing center agreement will be
must be submitted as
executed to allow
part of the requirements
temporary use of the
for NOL 1.
property for the project.
- Kindly consider
appropriate mitigation
The proposed site is measures as required by
Hazard Assessment
generally susceptible to the National Building
(source: Hazard Hunter)
liquefaction Code and the Structural
Code of the Philippines

The proposed site is Areas with moderate


susceptibility to floods are
likely to experience flood
heights of 0.5 meters up to
1 meter and/or flood
duration of 1 to 3 days.
These are subject to
widespread inundation
during prolonged and
extensive heavy rainfall or
extreme weather
conditions. Fluvial terraces,
alluvial fans, and infilled
valleys are also moderately
moderately susceptible to subjected to flooding.
flooding; 0.5 to 1.0 meter
flood height and/or 1 to 3 The implementation of
days flooding appropriate mitigation
measures as deemed
necessary by project
engineers and LGU
building officials is
recommended for areas
that are susceptible to
various flood depths. Site-
specific studies including
the assessment for other
types of hazards should
also be conducted to
address potential
foundation problems.
The proponent should
Environmental and Social
prepare and submit an
Safeguards Screening of Passed
Environmental and Social
Subproject
Management Plan

Prepared by:

Arnel B. Arreglado
SES Head

You might also like