Professional Documents
Culture Documents
General Arrangement & Material Plan (7 of 13) Ribandar Extention
General Arrangement & Material Plan (7 of 13) Ribandar Extention
UPLIGHTER -
-
FLOOD LIGHT -
15 M HIGH -
x
PLOT ENTRY RAMP 01
IN CONCRETE FINISH 1301
BE1
BE1 BE1 CONCRETE PAVER 03
P1 BE1 P3 (200X200X80)
BE1 BE1
1101
BL1 1601
BENCH 01
BE1 4001
DUST BIN -
B1 -
1801
Project Title:
DEVELOPMENT OF SMART RIBANDAR
UNDER SMART CITIES MISSION
Drawing Title:
RIBANDAR EXTENTION
GENERAL ARRANGEMENT
& MATERIAL PLAN (7 OF 13)
Drawing No : PAN-ACM-LS-TEN-SR-356 REV
R 0
Scale:
1:250
0m 6.25m 12.5m
SCALE: 1:250
CLIENT
IMAGINE PANAJI SMART CITY DEVELOPMENT LIMITED 9th Floor, Infinity Tower 'C'
DLF Cyber City, DLF Phase II,
Adil Shah Palace,Old Secretariat, Panaji,Goa- 403001 Gurgaon, 122002
Tel: +91-124-4830100
Fax: +91-124-4830108
COPYRIGHT RESERVED
GENERAL LEGEND COMPREHENSIVE PROJECT MANAGEMENT
CONSULTANT FOR DESIGN/ DESIGN REVIEW,
SITE BOUNDARY
DETAILED ENGINEERING AND PROJECT
MANAGEMENT OF VARIOUS URBAN
EXISTING GATE
INFRASTRUCTURE DEVELOPMENT PROJECTS
FOR PANAJI CITY.
EXISTING LAMP POST
UPLIGHTER -
-
FLOOD LIGHT -
15 M HIGH -
x
PLOT ENTRY RAMP 01
IN CONCRETE FINISH 1301
CONCRETE PAVER 03
P3 (200X200X80) 1101
GRANITE PAVING 03
P4
1104
EPDM 03
P5
1102
SANDPIT 03
P6 GENERAL NOTES :-
1103
MOORUM 01
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER
P7 1102
DRAWINGS AND SPECIFICATIONS WITHIN THE PACKAGE.
2. THESE DRAWINGS HAVE BEEN PREPARED FOR COORDINATION, COSTING &
INFORMATION PURPOSE ONLY.
STEPPING STONES 01
3. ALL DIMENSIONS ARE IN mts & DETAILS ARE IN mm.
P8 1103 4. DO NOT SCALE OFF THIS DRAWING-WRITTEN DIMENSIONS ARE TO BE
TAKEN ONLY.
FLUSHED KERB 01 5. ALL BASE PLANS USED HAVE BEEN PROVIDED BY THE CLIENT.
E1 6. EXCEPT WHERE OTHERWISE EXPRESSLY AGREED IN WRITING, AECOM
1201
SHALL HAVE NO RESPONSIBILITY OR LIABILITY FOR ANY LOSS, DIRECT OR
RAISED KERB 03
CONSEQUENTIAL ATTRIBUTED TO THESE DRAWINGS.
E2 7. THIS DRAWING MUST NOT BE COPIED IN WHOLE OR PART WITHOUT PRIOR
1201
WRITTEN CONSENT FROM AECOM.
8. SHOP DRAWINGS TO BE APPROVED BY CLIENT'S REPRESENTATIVE BEFORE
EDGE BETWEEN PAVED AND GREEN 05 EXECUTION ON SITE.
E3
L1 1201 9. MOCKUP SHOULD BE PREPARED FOR APPROVAL BY CLIENT'S
REPRESENTATIVE PRIOR TO EXECUTION.
EDGE BETWEEN MOORUM AND GREEN 01 10. IN CASE OF DISCREPANCY BETWEEN BOQ AND DRAWINGS, DRAWINGS
E4 WILL TAKE PRECEDENCE.
1202
11. THE TYPICAL DETAIL SET, COVERS ALL THE PROJECTS WITHIN THE SMART
EDGE BETWEEN PAVED AND SANDPIT 03
CITY AREA. ALL TYPICAL DETAILS SHOWN WITHIN THE GENERIC SET, MAY
E5 NOT BE APPLICABLE TO PARTICULAR PARK. FOR RELEVANT DETAILS
L1 1202
PLEASE REFER ONLY TO THE SPECIFIC TAGS MARKED WITHIN A
PARTICULAR LAYOUT PLAN, IN CONJUNCTION WITH THE APPLICABLE
EDGE BETWEEN SANDPIT AND MOORUM 05 TYPICAL DETAILS.
E6
1202
L1
EDGE BETWEEN EPDM & MOORUM 07
E7
1203
L1 SG4 BENCH 01
BE1 4001
DC1
P3
L1 L1 DUST BIN -
L1 B1 -
Tar 1801
Project Title:
DEVELOPMENT OF SMART RIBANDAR
UNDER SMART CITIES MISSION
Tar
P1 E2 Drawing Title:
RIBANDAR EXTENTION
Korean
grass GENERAL ARRANGEMENT
& MATERIAL PLAN (8 OF 13)
Drawing No : PAN-ACM-LS-TEN-SR-357 REV
R 0
Tender
AB 15-01-2019
Approved By: Issue Date: Construction
AM 12-02-2022 As Built
Scale:
1:250
DC1
0m 6.25m 12.5m
SCALE: 1:250
CLIENT
IMAGINE PANAJI SMART CITY DEVELOPMENT LIMITED 9th Floor, Infinity Tower 'C'
DLF Cyber City, DLF Phase II,
Adil Shah Palace,Old Secretariat, Panaji,Goa- 403001 Gurgaon, 122002
Tel: +91-124-4830100
Fax: +91-124-4830108
COPYRIGHT RESERVED
GENERAL LEGEND COMPREHENSIVE PROJECT MANAGEMENT
CONSULTANT FOR DESIGN/ DESIGN REVIEW,
SITE BOUNDARY
DETAILED ENGINEERING AND PROJECT
MANAGEMENT OF VARIOUS URBAN
EXISTING GATE
INFRASTRUCTURE DEVELOPMENT PROJECTS
FOR PANAJI CITY.
EXISTING LAMP POST
UPLIGHTER -
-
FLOOD LIGHT -
15 M HIGH -
x
PLOT ENTRY RAMP 01
IN CONCRETE FINISH 1301
CONCRETE PAVER 03
P3 (200X200X80) 1101
GRANITE PAVING 03
P4
1104
EPDM 03
P5
1102
SANDPIT 03
P6 GENERAL NOTES :-
1103
MOORUM 01
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER
P7 1102
DRAWINGS AND SPECIFICATIONS WITHIN THE PACKAGE.
2. THESE DRAWINGS HAVE BEEN PREPARED FOR COORDINATION, COSTING &
INFORMATION PURPOSE ONLY.
STEPPING STONES 01
3. ALL DIMENSIONS ARE IN mts & DETAILS ARE IN mm.
P8 1103 4. DO NOT SCALE OFF THIS DRAWING-WRITTEN DIMENSIONS ARE TO BE
TAKEN ONLY.
L1 FLUSHED KERB 01 5. ALL BASE PLANS USED HAVE BEEN PROVIDED BY THE CLIENT.
DC1 E1 6. EXCEPT WHERE OTHERWISE EXPRESSLY AGREED IN WRITING, AECOM
1201
SHALL HAVE NO RESPONSIBILITY OR LIABILITY FOR ANY LOSS, DIRECT OR
RAISED KERB 03
CONSEQUENTIAL ATTRIBUTED TO THESE DRAWINGS.
P1
L1 E2
1201
7. THIS DRAWING MUST NOT BE COPIED IN WHOLE OR PART WITHOUT PRIOR
WRITTEN CONSENT FROM AECOM.
8. SHOP DRAWINGS TO BE APPROVED BY CLIENT'S REPRESENTATIVE BEFORE
EDGE BETWEEN PAVED AND GREEN 05 EXECUTION ON SITE.
E3
1201 9. MOCKUP SHOULD BE PREPARED FOR APPROVAL BY CLIENT'S
REPRESENTATIVE PRIOR TO EXECUTION.
EDGE BETWEEN MOORUM AND GREEN 01 10. IN CASE OF DISCREPANCY BETWEEN BOQ AND DRAWINGS, DRAWINGS
E4 WILL TAKE PRECEDENCE.
P1 1202
11. THE TYPICAL DETAIL SET, COVERS ALL THE PROJECTS WITHIN THE SMART
E2 EDGE BETWEEN PAVED AND SANDPIT 03
CITY AREA. ALL TYPICAL DETAILS SHOWN WITHIN THE GENERIC SET, MAY
E5 NOT BE APPLICABLE TO PARTICULAR PARK. FOR RELEVANT DETAILS
1202
PLEASE REFER ONLY TO THE SPECIFIC TAGS MARKED WITHIN A
PARTICULAR LAYOUT PLAN, IN CONJUNCTION WITH THE APPLICABLE
EDGE BETWEEN SANDPIT AND MOORUM 05 TYPICAL DETAILS.
E6
1202
BL1 1601
BENCH 01
BE1 4001
DUST BIN -
B1 -
1801
Project Title:
DEVELOPMENT OF SMART RIBANDAR
UNDER SMART CITIES MISSION
Drawing Title:
RIBANDAR EXTENTION
GENERAL ARRANGEMENT
& MATERIAL PLAN (9 OF 13)
Drawing No : PAN-ACM-LS-TEN-SR-358 REV
R 0
Scale:
1:250
0m 6.25m 12.5m
SCALE: 1:250
CLIENT
IMAGINE PANAJI SMART CITY DEVELOPMENT LIMITED 9th Floor, Infinity Tower 'C'
DLF Cyber City, DLF Phase II,
Adil Shah Palace,Old Secretariat, Panaji,Goa- 403001 Gurgaon, 122002
Tel: +91-124-4830100
Fax: +91-124-4830108
COPYRIGHT RESERVED
GENERAL LEGEND COMPREHENSIVE PROJECT MANAGEMENT
CONSULTANT FOR DESIGN/ DESIGN REVIEW,
SITE BOUNDARY
DETAILED ENGINEERING AND PROJECT
MANAGEMENT OF VARIOUS URBAN
EXISTING GATE
INFRASTRUCTURE DEVELOPMENT PROJECTS
FOR PANAJI CITY.
EXISTING LAMP POST
Ls
EXISTING TREE KEY PLAN
UPLIGHTER -
Ls
-
FLOOD LIGHT -
15 M HIGH -
x
Ls PLOT ENTRY RAMP 01
IN CONCRETE FINISH 1301
Ls
DARK GREY PAVERS 01
P2 (200X200X80) 1104
CONCRETE PAVER 03
P3 (200X200X80) 1101
GRANITE PAVING 03
P4
1104
EPDM 03
P5
1102
Ls
SANDPIT 03
P6 GENERAL NOTES :-
1103
MOORUM 01
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER
P7 1102
DRAWINGS AND SPECIFICATIONS WITHIN THE PACKAGE.
L1
BL1 1601
BENCH 01
BE1 4001
DUST BIN -
B1 -
1801
Project Title:
DEVELOPMENT OF SMART RIBANDAR
UNDER SMART CITIES MISSION
DC1
Drawing Title:
RIBANDAR EXTENTION
GENERAL ARRANGEMENT
& MATERIAL PLAN (10 OF 13)
Drawing No : PAN-ACM-LS-TEN-SR-359 REV
E2 R 0
P1
Scale:
1:250
0m 6.25m 12.5m
SCALE: 1:250
CLIENT
IMAGINE PANAJI SMART CITY DEVELOPMENT LIMITED 9th Floor, Infinity Tower 'C'
DLF Cyber City, DLF Phase II,
Adil Shah Palace,Old Secretariat, Panaji,Goa- 403001 Gurgaon, 122002
Tel: +91-124-4830100
Fax: +91-124-4830108
COPYRIGHT RESERVED
GENERAL LEGEND COMPREHENSIVE PROJECT MANAGEMENT
CONSULTANT FOR DESIGN/ DESIGN REVIEW,
SITE BOUNDARY
DETAILED ENGINEERING AND PROJECT
MANAGEMENT OF VARIOUS URBAN
EXISTING GATE
INFRASTRUCTURE DEVELOPMENT PROJECTS
FOR PANAJI CITY.
EXISTING LAMP POST
FLOOD LIGHT -
L1 15 M HIGH -
x
L1 PLOT ENTRY RAMP 01
IN CONCRETE FINISH 1301
CONCRETE PAVER 03
P3 (200X200X80) 1101
GRANITE PAVING 03
P4
1104
EPDM 03
P5
1102
SANDPIT 03
P6 GENERAL NOTES :-
1103
MOORUM 01
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER
E2 P7 1102
DRAWINGS AND SPECIFICATIONS WITHIN THE PACKAGE.
2. THESE DRAWINGS HAVE BEEN PREPARED FOR COORDINATION, COSTING &
P1 INFORMATION PURPOSE ONLY.
STEPPING STONES 01
3. ALL DIMENSIONS ARE IN mts & DETAILS ARE IN mm.
P8 1103 4. DO NOT SCALE OFF THIS DRAWING-WRITTEN DIMENSIONS ARE TO BE
TAKEN ONLY.
FLUSHED KERB 01 5. ALL BASE PLANS USED HAVE BEEN PROVIDED BY THE CLIENT.
E1 6. EXCEPT WHERE OTHERWISE EXPRESSLY AGREED IN WRITING, AECOM
1201
SHALL HAVE NO RESPONSIBILITY OR LIABILITY FOR ANY LOSS, DIRECT OR
RAISED KERB 03
CONSEQUENTIAL ATTRIBUTED TO THESE DRAWINGS.
E2 7. THIS DRAWING MUST NOT BE COPIED IN WHOLE OR PART WITHOUT PRIOR
1201
WRITTEN CONSENT FROM AECOM.
8. SHOP DRAWINGS TO BE APPROVED BY CLIENT'S REPRESENTATIVE BEFORE
EDGE BETWEEN PAVED AND GREEN 05 EXECUTION ON SITE.
E3
1201 9. MOCKUP SHOULD BE PREPARED FOR APPROVAL BY CLIENT'S
REPRESENTATIVE PRIOR TO EXECUTION.
EDGE BETWEEN MOORUM AND GREEN 01 10. IN CASE OF DISCREPANCY BETWEEN BOQ AND DRAWINGS, DRAWINGS
E4 WILL TAKE PRECEDENCE.
1202
11. THE TYPICAL DETAIL SET, COVERS ALL THE PROJECTS WITHIN THE SMART
EDGE BETWEEN PAVED AND SANDPIT 03
CITY AREA. ALL TYPICAL DETAILS SHOWN WITHIN THE GENERIC SET, MAY
E5 NOT BE APPLICABLE TO PARTICULAR PARK. FOR RELEVANT DETAILS
1202
PLEASE REFER ONLY TO THE SPECIFIC TAGS MARKED WITHIN A
PARTICULAR LAYOUT PLAN, IN CONJUNCTION WITH THE APPLICABLE
EDGE BETWEEN SANDPIT AND MOORUM 05 TYPICAL DETAILS.
E6
1202
BL1 1601
BENCH 01
BE1 4001
DUST BIN -
B1 -
1801
Project Title:
DEVELOPMENT OF SMART RIBANDAR
UNDER SMART CITIES MISSION
Drawing Title:
RIBANDAR EXTENTION
GENERAL ARRANGEMENT
& MATERIAL PLAN (11 OF 13)
Drawing No : PAN-ACM-LS-TEN-SR-360 REV
R 0
Scale:
1:250
0m 6.25m 12.5m
SCALE: 1:250
CLIENT
IMAGINE PANAJI SMART CITY DEVELOPMENT LIMITED 9th Floor, Infinity Tower 'C'
DLF Cyber City, DLF Phase II,
Adil Shah Palace,Old Secretariat, Panaji,Goa- 403001 Gurgaon, 122002
Tel: +91-124-4830100
Fax: +91-124-4830108
COPYRIGHT RESERVED
GENERAL LEGEND COMPREHENSIVE PROJECT MANAGEMENT
CONSULTANT FOR DESIGN/ DESIGN REVIEW,
SITE BOUNDARY
DETAILED ENGINEERING AND PROJECT
MANAGEMENT OF VARIOUS URBAN
EXISTING GATE
INFRASTRUCTURE DEVELOPMENT PROJECTS
FOR PANAJI CITY.
EXISTING LAMP POST
P1
PROPOSE DRAIN WITH COVER
L1 DC1
01
1501
L1 UPLIGHTER -
-
FLOOD LIGHT -
15 M HIGH -
x
PLOT ENTRY RAMP 01
IN CONCRETE FINISH 1301
L1
PROPOSED PLANTING AREA - x
PA
-
CONCRETE PAVER 03
P3 (200X200X80) 1101
GRANITE PAVING 03
P4
1104
EPDM 03
P5
1102
SANDPIT 03
P6 GENERAL NOTES :-
1103
MOORUM 01
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER
L1 P7 1102
DRAWINGS AND SPECIFICATIONS WITHIN THE PACKAGE.
2. THESE DRAWINGS HAVE BEEN PREPARED FOR COORDINATION, COSTING &
INFORMATION PURPOSE ONLY.
STEPPING STONES 01
3. ALL DIMENSIONS ARE IN mts & DETAILS ARE IN mm.
P8 1103 4. DO NOT SCALE OFF THIS DRAWING-WRITTEN DIMENSIONS ARE TO BE
TAKEN ONLY.
FLUSHED KERB 01 5. ALL BASE PLANS USED HAVE BEEN PROVIDED BY THE CLIENT.
E1 6. EXCEPT WHERE OTHERWISE EXPRESSLY AGREED IN WRITING, AECOM
1201
SHALL HAVE NO RESPONSIBILITY OR LIABILITY FOR ANY LOSS, DIRECT OR
RAISED KERB 03
CONSEQUENTIAL ATTRIBUTED TO THESE DRAWINGS.
E2 7. THIS DRAWING MUST NOT BE COPIED IN WHOLE OR PART WITHOUT PRIOR
1201
WRITTEN CONSENT FROM AECOM.
8. SHOP DRAWINGS TO BE APPROVED BY CLIENT'S REPRESENTATIVE BEFORE
EDGE BETWEEN PAVED AND GREEN 05 EXECUTION ON SITE.
E3
1201 9. MOCKUP SHOULD BE PREPARED FOR APPROVAL BY CLIENT'S
REPRESENTATIVE PRIOR TO EXECUTION.
P1 EDGE BETWEEN MOORUM AND GREEN 01 10. IN CASE OF DISCREPANCY BETWEEN BOQ AND DRAWINGS, DRAWINGS
E4 WILL TAKE PRECEDENCE.
1202
P1 11. THE TYPICAL DETAIL SET, COVERS ALL THE PROJECTS WITHIN THE SMART
EDGE BETWEEN PAVED AND SANDPIT 03
CITY AREA. ALL TYPICAL DETAILS SHOWN WITHIN THE GENERIC SET, MAY
E5 NOT BE APPLICABLE TO PARTICULAR PARK. FOR RELEVANT DETAILS
1202
PLEASE REFER ONLY TO THE SPECIFIC TAGS MARKED WITHIN A
DC1
PARTICULAR LAYOUT PLAN, IN CONJUNCTION WITH THE APPLICABLE
EDGE BETWEEN SANDPIT AND MOORUM 05 TYPICAL DETAILS.
E6
1202
BL1 1601
BENCH 01
BE1 4001
DUST BIN -
B1 -
SG4 1801
Project Title:
DEVELOPMENT OF SMART RIBANDAR
UNDER SMART CITIES MISSION
Drawing Title:
RIBANDAR EXTENTION
GENERAL ARRANGEMENT
& MATERIAL PLAN (12 OF 13)
Drawing No : PAN-ACM-LS-TEN-SR-361 REV
R 0
Scale:
P1 1:250
0m 6.25m 12.5m
SCALE: 1:250
CLIENT
IMAGINE PANAJI SMART CITY DEVELOPMENT LIMITED 9th Floor, Infinity Tower 'C'
DLF Cyber City, DLF Phase II,
Adil Shah Palace,Old Secretariat, Panaji,Goa- 403001 Gurgaon, 122002
Tel: +91-124-4830100
Fax: +91-124-4830108
COPYRIGHT RESERVED
GENERAL LEGEND COMPREHENSIVE PROJECT MANAGEMENT
CONSULTANT FOR DESIGN/ DESIGN REVIEW,
SITE BOUNDARY
DETAILED ENGINEERING AND PROJECT
MANAGEMENT OF VARIOUS URBAN
EXISTING GATE
DC1
INFRASTRUCTURE DEVELOPMENT PROJECTS
FOR PANAJI CITY.
EXISTING LAMP POST
L1 P1 KEY PLAN
EXISTING TREE
UPLIGHTER -
-
FLOOD LIGHT -
15 M HIGH -
L1 -
x
PLOT ENTRY RAMP 01
IN CONCRETE FINISH 1301
L1 CONCRETE PAVER 03
P3 (200X200X80) 1101
GRANITE PAVING 03
E2 P4
1104
EPDM 03
P5
1102
SANDPIT 03
P6 GENERAL NOTES :-
1103
P1
DC1 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER
MOORUM 01
P7 1102
DRAWINGS AND SPECIFICATIONS WITHIN THE PACKAGE.
2. THESE DRAWINGS HAVE BEEN PREPARED FOR COORDINATION, COSTING &
INFORMATION PURPOSE ONLY.
L1 STEPPING STONES 01
3. ALL DIMENSIONS ARE IN mts & DETAILS ARE IN mm.
P8 1103 4. DO NOT SCALE OFF THIS DRAWING-WRITTEN DIMENSIONS ARE TO BE
TAKEN ONLY.
FLUSHED KERB 01 5. ALL BASE PLANS USED HAVE BEEN PROVIDED BY THE CLIENT.
E1 6. EXCEPT WHERE OTHERWISE EXPRESSLY AGREED IN WRITING, AECOM
1201
SHALL HAVE NO RESPONSIBILITY OR LIABILITY FOR ANY LOSS, DIRECT OR
RAISED KERB 03
CONSEQUENTIAL ATTRIBUTED TO THESE DRAWINGS.
E2 7. THIS DRAWING MUST NOT BE COPIED IN WHOLE OR PART WITHOUT PRIOR
1201
WRITTEN CONSENT FROM AECOM.
8. SHOP DRAWINGS TO BE APPROVED BY CLIENT'S REPRESENTATIVE BEFORE
EDGE BETWEEN PAVED AND GREEN 05 EXECUTION ON SITE.
E3
1201 9. MOCKUP SHOULD BE PREPARED FOR APPROVAL BY CLIENT'S
REPRESENTATIVE PRIOR TO EXECUTION.
EDGE BETWEEN MOORUM AND GREEN 01 10. IN CASE OF DISCREPANCY BETWEEN BOQ AND DRAWINGS, DRAWINGS
E4 WILL TAKE PRECEDENCE.
1202
11. THE TYPICAL DETAIL SET, COVERS ALL THE PROJECTS WITHIN THE SMART
L1 EDGE BETWEEN PAVED AND SANDPIT 03
CITY AREA. ALL TYPICAL DETAILS SHOWN WITHIN THE GENERIC SET, MAY
E5 NOT BE APPLICABLE TO PARTICULAR PARK. FOR RELEVANT DETAILS
1202
PLEASE REFER ONLY TO THE SPECIFIC TAGS MARKED WITHIN A
PARTICULAR LAYOUT PLAN, IN CONJUNCTION WITH THE APPLICABLE
EDGE BETWEEN SANDPIT AND MOORUM 05 TYPICAL DETAILS.
E6
1202
BL1 1601
BENCH 01
BE1 4001
DUST BIN -
L1 B1 -
1801
Project Title:
DEVELOPMENT OF SMART RIBANDAR
UNDER SMART CITIES MISSION
P1
L1
Drawing Title:
E2
RIBANDAR EXTENTION
GENERAL ARRANGEMENT
& MATERIAL PLAN (13 OF 13)
L1
Drawing No : PAN-ACM-LS-TEN-SR-362 REV
R 0
Scale:
1:250
L1
L1
0m 6.25m 12.5m
SCALE: 1:250
CLIENT
P1
IMAGINE PANAJI SMART CITY DEVELOPMENT LIMITED 9th Floor, Infinity Tower 'C'
DLF Cyber City, DLF Phase II,
Adil Shah Palace,Old Secretariat, Panaji,Goa- 403001 Gurgaon, 122002
Tel: +91-124-4830100
Fax: +91-124-4830108
COPYRIGHT RESERVED
COMPREHENSIVE PROJECT MANAGEMENT
CONSULTANT FOR DESIGN/ DESIGN REVIEW,
DETAILED ENGINEERING AND PROJECT
OUT DOOR TYPE FEEDER PILLAR- 1 (4 WAY TPN) OUT DOOR TYPE FEEDER PILLAR- 2 (4 WAY TPN)
MANAGEMENT OF VARIOUS URBAN
Fed From: MAIN PANEL Fed From: MAIN PANEL
Rating MCB Rating MCB
INFRASTRUCTURE DEVELOPMENT PROJECTS
SL Cir SL Cir
Of
RCCB
No. No. Rating
- Amps
Room / Area Load Per Circuit - Watts
Remarks
Of
RCCB
No. No. Rating
- Amps
Room / Area Load Per Circuit - Watts
Remarks
FOR PANAJI CITY.
R Y B R Y B
01. R1 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 07 420 01. R1 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 09 540
02. R2 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 08 480 02. R2 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 08 480 KEY PLAN
03. R3 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 08 480 03. R3 10 -- -- SPARE
04. R4 10 -- -- SPARE 04. R4 10 -- -- SPARE
05. Y1 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 09 540 05. Y1 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 08 480
06. Y2 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 07 420 06. Y2 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 07 420
07. Y3 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 08 480 07. Y3 10 -- -- SPARE
08. Y4 10 -- -- SPARE 08. Y4 10 -- -- SPARE
09. B1 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 08 480 09. B1 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 08 480 x
10. B2 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 08 480 10. B2 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 07 420
11. B3 10 4.0/2.5 SITE PLAN (EXTERNAL LIGHT) 08 480 11. B3 10 -- -- SPARE
12. B4 10 -- -- SPARE 12. B4 10 -- -- SPARE x
TOTAL 69 TOTAL 45
TOTAL IN W = 4260 TOTAL IN W = 2820
4.2 2.8
R Y B R Y B
1380 1440 1440 1020 900 900
F.P.-1/B1
GENERAL NOTES :-
F.P.-1/Y1 F.P.-1/R1
F.P.-1/B2
F.P.-1/Y2 F.P.-1/R2 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER
L1
L1
DRAWINGS AND SPECIFICATIONS WITHIN THE PACKAGE.
2. THESE DRAWINGS HAVE BEEN PREPARED FOR COORDINATION, COSTING &
L1
L1
L1
L1 L1
F.P.-1/Y3
L1 L1 L1
L1
L1 L1
L1 F.P.-1/B3 F.P.-1/R3 3. ALL DIMENSIONS ARE IN mts & DETAILS ARE IN mm.
L1
L1
L1
L1
L1 L1
L1
L1
L1
L1 L1
L1
L1
4. DO NOT SCALE OFF THIS DRAWING-WRITTEN DIMENSIONS ARE TO BE
TAKEN ONLY.
L1
L1
L1 L1
L1
L1
BE1
L1
BE1
BE1
BE1
L1
L1
BE1
L1
L1
L1 L1
L1
L1
7. THIS DRAWING MUST NOT BE COPIED IN WHOLE OR PART WITHOUT PRIOR
WRITTEN CONSENT FROM AECOM.
L1
8. SHOP DRAWINGS TO BE APPROVED BY CLIENT'S REPRESENTATIVE BEFORE
EXECUTION ON SITE.
L1 9. MOCKUP SHOULD BE PREPARED FOR APPROVAL BY CLIENT'S
L1 REPRESENTATIVE PRIOR TO EXECUTION.
L1
L1
L1
L1
L1
L1
L1
Project Title:
L1
L1
L1
DEVELOPMENT OF SMART RIBANDAR
F.P.-2/B1
UNDER SMART CITIES MISSION
L1
L1
L1
F.P.-2/Y1
L1
L1
F.P.-2/R1
L1
L1
Drawing Title:
L1
L1
L1
L1
F.P.-2/Y1
F.P.-2/R1
Scale:
1:1250
IN A0
CLIENT
IMAGINE PANAJI SMART CITY DEVELOPMENT LIMITED 9th Floor, Infinity Tower 'C'
DLF Cyber City, DLF Phase II,
Adil Shah Palace,Old Secretariat, Panaji,Goa- 403001 Gurgaon, 122002
Tel: +91-124-4830100
Fax: +91-124-4830108
COPYRIGHTRESERVED
Development of Smart Ribandar Under smart cities mission
Sewerage
COMPREHENSIVE PROJECT MANAGEMENT
CONSULTANT FOR DESIGN/ DESIGN REVIEW,
DETAILED ENGINEERING AND PROJECT
MANAGEMENT OF VARIOUS URBAN
INFRASTRUCTURE DEVELOPMENT
PROJECTS FOR PANAJI CITY.
KEY PLAN
GENERAL NOTES :-
Project Title:
PANAJI SMART CITY
DEVELOPMENT OF
"SMART RIBANDAR
Drawing Title:
Drawing No. :
REV R 0
Scale:
N
CLIENT:
COPYRIGHT RESERVED
12-02-2022
12-02-2022
12-02-2022
12-02-2022
12-02-2022
12-02-2022
COMPREHENSIVE PROJECT MANAGEMENT
CONSULTANT FOR DESIGN/ DESIGN REVIEW,
DETAILED ENGINEERING AND PROJECT
MANAGEMENT OF VARIOUS URBAN
INFRASTRUCTURE DEVELOPMENT
PROJECTS FOR PANAJI CITY.
KEY PLAN
GENERAL NOTES :-
Project Title:
PANAJI SMART CITY
DEVELOPMENT OF
"SMART RIBANDAR
Drawing Title:
Drawing No. :
REV R 0
Scale:
N
CLIENT:
COPYRIGHT RESERVED
12-02-2022
12-02-2022
12-02-2022