You are on page 1of 3

M. Montesclaros Farms, Inc.

Sayre Highway Hagkol, Valencia City, Bukidnon

PROCEDURES MANUAL
TITLE FARROWING STAGE (SELECTION STARTS)
OBJECTIVE To ensure that piglets selected in the farrowing pass the standard that the HYPOR gave.
SCOPE This procedure is applicable for Farrowing Swine only.

Responsible Activities
Leadman / Hogman / Farrowing 1. Assists the farrowed sow (fill up the farrowing data)
Attendant
2. Checking on the line of the sow whether it is PS, GP, or GGP
3. Selection start on GP and GGP only
4. GP sows is the Landrace and Large white its piglets classified as Parent Stock or the PS
(all the piglets that are selected in GP sows are directly the PS or the Libra)
5. GGP sows such as the Duroc (Kanto and Magnus) and Pietrain are the sire lines all its
progeny are GGP if and only the males piglets has no genetic defect such us scrotal hernia,
Genetics
umbilical hernia or one egg etc. If one of the males in one litter size possesses the genetic
defect all the males are downgraded to PS. And if two or more male possess genetic defect
all the piglets will be market hogs.
6. GGP sows such as Landrace and Large white are the dam lines . if one male has genetic
defects all female will turn into GP piglets. And if it has two males possess genetic defects
all piglets in one litter size turn into market hogs or the final product.
7. All the selected piglets will undergo the tail docking, for the selected GGP and PS males they
will not be castrated.
Leadman/ Hogman
8. Upon reaching 23 days of age like any other piglets they will be weight and transfer to
nursery. Sow will be transfer back to breeding.

RECORDS/DOCUMENTS GENERATED:
1. Tally Sheet

TITLE NURSERY STAGE


OBJECTIVE To ensure that the selected piglets in the nursery are all well taken care off.
SCOPE This procedure is applicable on selected piglets in Nursery Stage Swine only.

Responsible Activities
1. Selected and the final products piglets are in AD LIBITUM feeding.
2. Vaccination Schedule
Leadman / Hogman
Note: Age of piglets reaching at 28, 35, 42 and 56 days
3. Deworming and vitamins
Genetics 4. Monitor of the selected piglets in every room
5. Upon reaching 75 days the market hogs will be seeded to growing.
Some of the PS pigs will be transfer to growing for commercial breeder’s purposes.
Leadman/ Hogman
The remaining selected PS growers, the GP and the GGP will be transfer to gilt development
units

RECORDS/DOCUMENTS GENERATED:
1. Tally Sheet in Transfer
M. Montesclaros Farms, Inc.
Sayre Highway Hagkol, Valencia City, Bukidnon

PROCEDURES MANUAL
TITLE GROWING STAGE
To ensure that the growing process on commercial breeders will reach the standard weight
OBJECTIVE
requirement on each buyer.
SCOPE This procedure is applicable for growing stage Swine only.

Responsible Activities
1. Feeding of grower pigs and selected is AD LIBITUM feeding
2. Vitamins
Leadman / Hogman
3. Vaccination Schedule
Note: 76, 85, 94, 105, and 125 days
4. Checking the tags of selected pigs.
Genetics 5. Upon reaching the standard weight and requirement of each buyer
6. Final selection and big tagging
Leadman/ Hogman 7. Upon reaching the standard weight and requirement of each buyer the pull out begin.

RECORDS/DOCUMENTS GENERATED:
1. NONE

FLOWCHART:
Responsible Activities Records/Documents Generated
Selection of Gilt
Genetics Selection Tally Sheet

Are there issues with


quality? Y Reject
Production Supervisor

N Gilts to breeding herd


Transfer
Leadman/Hogman

Heat Detection

Leadman/Hogman

Leadman/Hogman
Artificial Insemination Breeding Book

Production Supervisor Check the breeding book

Gestation Stage

Leadman/Hogman Feeding of sows

107 days transfer to farrowing

Leadman/Hogman
M. Montesclaros Farms, Inc.
Sayre Highway Hagkol, Valencia City, Bukidnon

PROCEDURES MANUAL

Leadman/Hogman

Warehouse Supervisor/ Resolve by inspection and making


Inventory Supervisor Nursery stage Y report with description and details
about the damaged, obsolete and
expired items and report to VP-
Operation for recommendation.

N
VP-Operations

Warehouse Supervisor Make corresponding adjustment in


Make Corresponding
the system Adjustment
Record
inand forward the
the system.
documents of received item to
Inventory Supervisor

Warehouse Supervisor
Note Generated Reports

Check and review the item receipt


input in the system.
Inventory Supervisor

Inventory Staff Record and forward the


documents of received item to
Accounting

You might also like