<:~~"'~,J- Approval letter to 3mm HYDROSTOP waterproofing membrane
The M/s TIKI TAR Industries, Gujarat is an ISO company is manufacturing Bridge deck,
Basement, Podium, Pond lining and Roof top water proofing as per 19:>: 9001 - 2008 and with
Nationalized standards.
HYDROSTOP is the ideal membrane for use as waterproofing for Concrete Bridge Deck, in
lieu of Mastic Asphalt, under BC overlay.
The company presently at Panchmahals, Gujarat producing Bridge deck, Basement, Podium,
Pond lining and Roof top water proofing which conforming to as per 1St(9001 - 2008. The deck
must be clean' and free from dust and generally even. A coat of Tiki Bitumen Primer is then
applied @ 200- 250 gms/m2 and allowed to dry. HYDROSTOP is then applied by torch on method
by the trained applicator. The rolls are lined up and spread open over the deck area with proper
side laps and end laps. The membrane is then rolied back without changing its orientation. It is
unrolled once again and the, underside is evenly and sufficiently torched to cause surface
melting. Press the membrane from above from inside to out ensuring that there is no entrapped
air and there is proper adhesion to the deck. The lap joints should be heated from the top to
produce a thin bead of molten bitumen at the seam, which should then be smoothened out with
a hot trowel, ensuring a properly welded joint.
Tiki Polymer and Rubber Modified Bitumen improves resistance to cracking, resulting in stronger
and more durable overlays for corridors in the areas of extreme climatic conditions and heavy
traffic loads. It reduces deformation on roads at elevated temperature (SOoC to 70°C} where
rutting is excessive. It is achieved due to improved viscosity and elastic recovery of polymer and
rubber based modified bitumen, compared to co.nventional bitumen.
As usual Tiki Tar's desire to move beyond the conventional products and constant endeavor to
be the pioneers in the Industry had led to collaboration with Elsamex (Europe) for manufacturing
high quality Polymer Modified Bitumen Emulsions used for National Highways ~nd Airport
Runways.
bn the basis of literature submitted by the company, ·list of vendors, NON CUMBERSOME
operation process of HYDROSTOP, supervision is easy, no weight on bridge deck and paving can
commence immediately, it is concluded that M/s TIKI TAR Industries, Gujarat can be considered
as approved vendors as waterproofing for Concrete Bridge Deck, in lieu of Mastic Asphalt,
under BC overlay.
~~
Date:-15 July 2010
Executive Engineer
Copy to -1) M/s. NCC J. Kumar (JV) T & C division, MMRDA
Wadala casting yard, Wadala, Mumbai.
2) Team leader, S. N. Bhobe & associates Pvt. ltd .
. ~sting yard, Wadala, Mumbai
V3fM/s TIKI ASPHALT LIMITED
Village road Bhandup (W) Mumbai 400078
To,
NCC-J. Kumar-JV
16-A, Andheri Industrial Estate,
Veera Desai Road,
Andjeri (W)
Mumbai - 400 058
Sub: Design & Construction ofFlyovers on Dr. B. A. Road Pkg-1
j
S.H. Approval for Vendor- TIKI TAR industries for waters proofing
Membrane of Hydro stop-3mm Thick
Ref: 1) Contractors letter No NCC-J.K./AR-FLY/Site/818 dated 1/7/2010
2) PMC letter No SNBAPUMMRFA/J.Kumar/S/894 dated 20/10/2010
· 3) PMC l~tter No SNBAPL/MMRDA/J](umadS/909 dated 09/11/2010
4) Contractors Jetter No NCC-J.K./AR-FL Y/Site/908 dated 25/10/2010
Dear Sir,
With reference to letter mention above, we here by approve Hydro Stop 3mm
thick, membrane to be used in__, .... of 6mm mastic without disturbing the RTL (Rood
plac.e
Top Level) Difference of 3mrn should be adjusted by increasing the- thickness of BC.
' .
The details are as below. /,
fl
The original proposal was as under:
• 25 mm - Mastic .
• 50mm-DBM
• 6mm - Mastic '
Now, it is changed to :
• 38mm - BC
• 40rnm - DBM
• 3 mm- Hydro stop (water proofing membrane)
Yours faithfully,
Chief,
Transport & Communications Division
Copy to
Team Leader (S.N. Bhobe)
For necessary action
'
•
'
~..-=1'311 ,,nr? ...
\ I '0 ~r -c.J~lf"C.fY81f "'il-=jfq, 7
'Pfu, \ '
Chl~l'tFI ~~ (__'s:f, rn. ~)
~lcl"iH ct> ~ fcrl:wr,
ti:;:n<"~~,
~-·~oo o~~- ·
(
' .
I
34<lm ~ LBr w. ~ ~ ~ ~~ ~ ~o~o ~ · ~ ~ 5f
~ICft/
~~(ley(_
~~~~~
f1Cf)c;qf'~5i ~ ( Fmffi)
-;:rcff~
~\\De II 050 I \se-br\KlRNALI\M inutesiJvi-Min.Tiki Tal 1810 10 uoc
'. ·.
w
~r l_(;l.!lp ch ~_!\'! ~. o~i J!!!.!~J!.QJJl,(l on..
\ Namt or work: De$~ ~lruCIIiiil O(f:!iyover and ROB at Nashill Phata on o~J Paoe-122
\ \ M.Jmbai Pune NH. 41nduillng lxidge on River Pawana
Propertlos
Waterproofing Membrane sHall strictly co(! firms to American Society or Testing and
Materials (ASTM) specmcalions.
Method or A~llcaUon'
'·'
. ,.. ,. ...
.,..................---~---- ---- ----·-----·
..
The Installation of Waterproofing Membrane ·is both easy and quick. Waterproofing
...._.
_, . Membrane may be first' posiUoned c~rrectiy o_n·tile surface t~ b~ tr~ated. . Using left to
right mov_ements thermo fuse the loWer surface of lhe membrane wiU1 gas torch. This
wm cause-slight surface melting and subsequent adhesion to the substrate on pressure
applied on lop surface. Tlle lh~nno fus.e· membran~· ~Ill be pressed ~venly by .rol~er fron1
the centre to Ule edge$ In ·order to·dfive our entrapped a!r. Continue the ·above process
.J for co~secutlve rolls, keeping In mind overlaps. and end laps of 10 ems. The lap joints
must.be then sealed bY.Jhe "hot trowei"IJlelhod. ·
. . . ...-- . __- .
Paving can be commenced as soon as th~terproo)g Membrane is placed.
. .. . . . . .- . 4Tr .· ~ .
Waterproofing Membrane shall · ~e of HYOROSTOP I ASPHALTOSEAL make or
equivalent as apprpved by the Engineer.
; ·.
.
.
.• ·.
I• .
f Ex e. Englnser (Projecf3), PCMC
\ . .
."-....~