Cons
Potentially unreliable service due to environmental conditions.
Power supply is not controlled by users.
Cost
Lease cost
The installation cost is assumed in the rent of this equipment for the time that will be needed
Equipment rent per month: 18.113 USD per month per MW installed (2MW Installed)
Total Cost per 2 years period lease: 869.408 USD
Operation Cost
There is the following table
Table 2-2: Operation Cost – Generation
Total Cost
=Lease Cost + Operation Cost
Total Cost= 8,238,544 USD per 2 years operation
Pros
Quick installation
Avoid external outages by environmental factors.
Free maintenance and operation.
Cons
High-cost diesel fuel.
Road access to be improved for fuel-truck traffic