REVIEW PRODUCTION 29 Agustus 2022 NO UNIT STRIPPING METODE EXPOSE RL ACT DUMPING Jarak (m) NO GENERAL ISSUE ECT.
OB DAILY (BCM) DISTANCE (METER) 1 E2006 OB FREE DIGGING CL ROOF 10 OPD BTS RL+55 2.800 1 Construct Jalan ROM A1 Sisi Selatan (P1) PROGRES
Plan : 91.876,59 Plan Monthly : 3.284,00 2 E2014 OB FREE DIGGING - -5 0 OPD BTS RL+55 3.400 2 Sloping BU Selatan RL20 - RL10 (E330) CONTINUE
Actual : 43.388,25 Actual Daily : 3.225,96 3 E2028 OB FREE DIGGING - 40 45 OPD BTS RL+55 3.900 3 Sloping Front Tengah RL20 - RL10 (E314) CONTINUE
Ach (%) : 47,22% Actual MTD : 3.114,79 4 E2013 OB FREE DIGGING - -5 -2 OPD UTARA RL+55 3.600 4 Closing Serah terima spreading soil KGS (E2102) 85%
Under : -169,21 1,71 5 E2029 OB FREE DIGGING - -5 -3 OPD UTARA RL+55 3.500 5 Release genangan air disposal (E253) CONTINUE
6 E2022 OB FREE DIGGING - 20 24 OPD BTS RL+50 3.300 6 Dumping material bagus pada area frame disposal buffer 20 meter dari crest terluar INFO
OB MTD (BCM) STRIPPING RATIO 7 E2008 OB FREE DIGGING - -5 -2 OPD BTS RL+55 4.000 7 Pemaksimalan fleet diarea undercutting (Coal getting) E501 E8509 INFO
Plan : 2.776.996,07 Plan SR : 4,51 8 E2019 OB FREE DIGGING - -5 -2 OPD UTARA RL+55 3.600 8 Clean Up Rencana IPD BU selatan 5%
Actual : 2.891.483,85 SR Daily : 7,23 9 E2021 OB FREE DIGGING - -5 -3 OPD BTS RL+55 3.800 9 Support Material Bagus Jalan MSTB (P2 setelah isu 1 selesai) CONTINUE
Ach (%) : 104,12% SR MTD : 5,62 10 E1223 OB FREE DIGGING CL ROOF -3 OPD UTARA RL+55 3.500 10 Pembuatan Parit CW Segmen G RL+45 OPEN
Catch up : 3.122,57 Over : 1,11 11 E408 OB FREE DIGGING - 0 7 RENCANA JALAN KM 26 3.100 11
12 12
PIT KGU
SHE/SAFETY ENGINEERING PRODUKSI SHE/SAFETY
ENGINEERING PRODUKSI