Professional Documents
Culture Documents
Screenshot 2021-12-25 at 08.19.25
Screenshot 2021-12-25 at 08.19.25
L PH LI L S HI DL
S PP L( )
P : MI D S D L PM S I PL .
H H M ID H H P H IL H H H
D :
S H H M I H HI M
P : S M DM I SP LI SS P MI DS
I H : PH H M H H I H PH H M H H PH H H
DD SS: PL H HI M H D I H HI MI H I I M.
L t thu c hu ch c n ng s trong hu th m i h hi m h ng n h nh P. h c
H :
.H M
Si
Mr. guyen Duc Hau
(Me PM – entral)
Issue by:
Người yêu Date Ng y: u
Si
c u
Mr. Pham Hoang Loc
(SM – Schin ler)
D S IP I PP L S D uc u h uy t
e submit here ith the attache ocument or your re ie an a ro al
ng t i n m t i i u ư i y c o u c ng ty em t ê uy t
Submit or a ro al about N i ung yêu c u ê uy t
N n i Ng y
I :
See ans er belo Please gi e more etails or ar e to:
ui ng em n i ên ư i ui ng cung c t êm t ng tin ư c c uy n ti n
onsultant s omments i nc a n:
Checking does not relieve the contractor of the responsibility for ensuring full compliance with all
requirements of technical specification, construct working drawing and other contract documents.
The contractor is responsible for all dimensions which shall be confirmed and correlated at the job site,
fabrication processes, techniques of construction, and the co-ordination of his work with that of all other
trades.
JRP comments:
This shop drawing is approved with comments in the drawing. Contractor may proceed
with construction subject to full compliance with the contract/sub-contract requirements.
29Jul2021
Signature
ame Date:
ên Ng y
ro al status h ng tin h uy t:
Signature
ame Date:
ên Ng y
c no le ge by he ngineer
ư c cn n iN ư n
Signature
ame Date:
ên Ng y