www.voith.com/hyservice
Service Product
Components
Generator
Customer
Main Inlet Valve
Automation
Balance of Plant Electrical
Balance of Plant Mechanical
4 5
1
6 7
7
4 5
2
1 2
Chiplima, India Salal, India Bhira, India Western Yamuna Canal, India
Hirakud HEP, India: Voith Hydro has successfully carried out Bhira HEP, India: Voith Hydro had received order from Tata 3 Nathpa Jhakri HEP, India: Voith Hydro has supplied 16 nos. Baglihar1 I HEP, India: Voith Hydro is providing
renovation, modernization and upgrade of two units (unit Power to replace the stator of 150 MW motor-generator for upper labyrinth seals for 250 MW Francis Turbine for SJVN maintenance/troubleshooting support for 3x150 MW
no. 3 & 4) of 24 MW Francis machines of Hirakud (Burla) Bhira Pump Storage project in May 2014. The scope of work Limited. This was the first time SJVN Limited procured these Baglihar-I Power Station of JKSPDC by Voith experts
HEP for Odisha Hydro Power Corporation Ltd. The Turbines comprised of design, upgrade, manufacture, supply, erection, labyrinths from India. Voith Hydro successfully manufactured stationed at site. Additional Voith experts are deputed during
were uprated from 24 MW to 33 MW and generators are testing and commissioning of motor-generator with new uprated these high precision parts at its Vadodara facility. planned inspections for assessment of the equipment.
uprated from 27 MVA to 35.76 MVA. stator of 200 MVA. Voith Hydro successfully completed design,
manufacture, supply and build-up of new stator at site in record Bhilangana HEP, India: Voith Hydro has successfully designed, Baglihar II HEP, India: Voith Hydro received Contract for
Salal HEP, India: Voith Hydro is executing order from NHPC time of 11 months. The shutdown was limited to only 54 days manufactured and supplied 6 Nos. 8 MW Francis Runners. maintenance/troubleshooting support for 3x150 MW
(6 x 115 MW) for design, model test, manufacture, supply, thus ensuring minimum idle time of the unit. Baglihar-II Power Station of JKSPDC similar to service
erection, testing and commissioning of 06 nos. fully HVOF Baner HEP and Binwa HEP, India: Voith Hydro has agreement of Baglihar – I.
hard coated Francis runners along with fixed and moving Western Yamuna Canal HPS, India: Voith Hydro has successfully designed, manufactured and supplied 1 No. Pelton
labyrinth. The older units of the project experienced erosion successfully executed the order for supply of turbine parts and Runner for 4 MW unit of Baner HEP and 2 Nos. Pelton Runner Emergency Support
damage because of high silt in water. The design head of the refurbishment of Bulb Turbines of two units of 8 MW (unit no. 2 for 3 MW unit of Binwa HEP for HPSEB. Runners are of
project is also reduced because of regulatory requirement. in power house A and unit no. 2 of power house B) for HPGCL. improved hydraulic profile and efficiency. Nathpa Jhakri HEP, India: Customer contacted Voith to attend
The new runners to be supplied by Voith are designed to The units had undergone considerable deterioration and order emergency breakdown of 250 MW (278 MVA) generator due to
generate full power at reduced head of 85 m. for their refurbishment was placed on Voith for restoration work. Kopili HEP, India: Voith Hydro received Contract for design, earth fault failure. Voith experts together with customer’s
The first runner has already been delivered at site on 30th engineering, manufacture, supply and supervision of erection maintenance team worked round the clock and unit was
Upper Indravati HEP, India: Voith Hydro had been awarded a and commissioning of 1 no. stainless steel butterfly type MIV and successfully synchronised within one week.
Nov 2016 according to the project schedule.
Contract for supply of spares & major overhauling of turbine, 1 no. stainless steel spherical type MIV for 25 MW and 50 MW
Ubolratna HEP, Thailand: Voith Hydro has been awarded a main inlet valve, generator and upgradation work of AVR & units of Kopili HPP of NEEPCO. The order is under execution. Namkhot HEP, Vietnam: The unit was in shutdown condition
Contract for Renovation of 2 units of 8.8 MW each (unit 2 & governor system for 150 MW unit in Sep 2015 by OHPC. Voith due to damage of AVR Controller (2 x 5.5 MW). Customer
3) by EGAT. The scope comprises of replacement and Hydro completed the work and handed over the Unit to the Tamaris Hydro, Indonesia: Voith Hydro has executed and contacted Voith for emergency assistance to get the unit online.
Owner in July 2016 within 5 months of start of work at site. currently executing various spare parts orders for various HPPs New controller was supplied and successfully installed by Voith
refurbishment of turbine components, replacement of
generator, automation, balance of plant electrical & of Tamaris Hydro. within weeks time.
mechanical equipment. Baglihar I HEP, India: Voith Hydro is executing a Contract for
restoration & rehabilitation of 150 MW unit no. 2 for JKSPDC. Nam Chiem-1A HEP, Vietnam: Voith Hydro is executing a Nam Chiem 1A HEP, Vietnam: The power plant was flooded on
The scope of work consists of replacement of runner, stationary Contract for supply of electrical and mechanical spare parts. 19th Aug 2016. Voith deputed expert immediately for the
Chiplima HEP & Hirakud HEP, India: Voith Hydro has been
awarded two Contracts (Chiplima – Unit 3 of 24 MW and labyrinth and overhaul of complete generating unit. restoration of 2 units of 5 MW. In a very short duration of 5 days,
Dakpsi HEP, Vietnam: Voith Hydro has executed Contract for
Hirakud Unit 5&6 - 2x43 MW) by OHPC for Renovation and both the units were made ready for operation and synchronized.
Karai 13 HEP, Indonesia: Voith Hydro is executing an order supply of spares for turbine and control system.
Modernization/Upgrade. The scope comprises of
replacement of complete Kaplan turbine except embedded for supply of runners, guide vanes, labyrinth seals, facing plates, Ha Rao Quan HEP, Vietnam: Voith Hydro has executed a
Khimti 1 HEP, Nepal: Voith Hydro is executing a Contract for
etc. and supervision work for 2 units of 4.7 MW. The units will be Contract for supply and commissioning of AVR controller on
parts, complete generator, automation, balance of plant supply of dry type transformer for Himal Power Ltd.
restored to original capacity after this refurbishment. emergency basis.