SALIENT FEATURES

1. he total area of this


Housing Scheme Project under consideration consist upo
125.40 Kanal Chak No.48/NB Tehsil &
District Sargodha. The ultimate load demand
comes out as 7 KW i-e,
2
g
amps.
Supply of power to this project is being proposed from mix load 11 KV Astana e Fazal
feeder emanating from 132 KV Kirana Grid Station under Nishter abad Sub Division
FESCO
3 The external electrification of this project is proposed through overhead HT/LT system
for individual energy meters as desired by the owner of scheme. According to the
design proposal specifications and calculations, 06 No. 200 KVA & 03 No. 100 KVA
Overhead distribution transformers, is proposed to cater the proposed load demand of
the said Housing Project.
4 The cost estimate is prepared in accordance with the latest store issue/ERP rates
inclusive of construction charges. The electrification work shall be done as per
approved design according to the policy of FESCO
5 The proposed Housing Scheme map, as provided by the developer of the project,
duly Approved has been used for ultimate load demand assessment according to
criteria, preparation of BOQ, cost estimate for electrification design for overhead
system. However the correctness of approval of this housing scheme lies with the
owners of the project.
6 Single line diagram and data input sheets of 11 KV Astana e Fazal feeder emanating
from 132 KV Kirana grid station, as provided by SDO (Op) FESCO Nishter abad sub-
division, has been used for voltage drop and losses calculations of existing and
proposed system.
7 Single Circuit Osprey to Double Circuit Osprey from nodes 1-2 (1.942 KM) , Rec from
Dog to Double Osprey Between Nodes 2-3-7-9-10-25-27-43 (1.008 KM) and Rec
Dog to Osprey from node 43-46 (0.399 KM) have been proposed in proposed system
to bring voltage drop of proposed system equivalent to existing system.

8- The existing and proposed feeder parameters after including the proposed load of
instant project, as observed in analysis, are as given below.

SIN Feeder Length Load Connected Load Power % %


Exist/pro (KM) (amps) KVA Factor Factor Power Voltage AEL
% % Loss Drop
Max.
1 Existing 64.1 280 10830 60 85 10 23.4 |7
2 Proposed 64.961 338 12330 60 85 10 23.4 7

HORIZON ENGINEERS