You are on page 1of 2

I.H.

Gayan Dharmarathne (SAP – 4762)


Ancillary Product Division
Camso Loadstar
2017/12/12

PROJECT PROPOSAL
Reduce defect level of Flap curing
process

I. Objectives
 Reduce internal defects by 75%

1
 Increase productivity of flap curing process

 Reduce rubber related waste

 Reduce internal failure cost

II. Methodology
 Identify the major defects contributed for defectives.

 Recognize the appropriate root cause for particular defects

 Analysis the countermeasures for root causes

 Conduct the sample production with identified countermeasures

 Check the effectiveness and implementation

III. Timeline
From 01 January 2018 to 31 March 2018

You might also like