GENERAL NOTES
NOTE 14
THIS DRAWING IS THE REPRODUCTION OF THE BUILDER'S DRAWINGS No.
1057DA106M001 "MACHINERY ARRANGEMENT IN ENGINE ROOM’,
DA101Z029 "GENERAL ARRANGEMENT".
REPRODUCTION OF THE BUILDER'S DRAWING IS DONE BY ORDER OF THE VESSEL'S OWNER AND FOR
‘THE PURPOSE OF THIS PROJECT ONLY.
NOTE 2:
BOLD LINESIFONTS INDICATE NEW/ADDITIONAL ITEMS.
PRELIMINARY
REV.No, [DATE _ [DESCRIPTION DRAWN [APPROVED
Title:
BWTS ARRANGEMENT EQUIPMENT
Tammy Pratt
aroo BE W-ORIGINAL
> Seca (IMO No. 9627758)
‘Approved by: Date: Drawing Number: | Class: LR ‘Sheet size: Aq
D.DOXARAS 4103/2022 21468-6-04 | Scale: NIA ‘SheetNo: 1/6
788, Aas Eloosls Sr Maro 15125 athons, | opvTGNT
(reece Tel s800"00056000 ax -a0ztes0s622% | Allarawngs aro property of ARGO NAVIS ENGINEERS LTO. and thoy
Esnalmalgesonnis gr Webstowmazonnis | anata patty way colder used wou he wen aieonCHLORINE SENSOR MODULE (TRO:
CHLORINE SENSOR MODULE (TRO2)
‘ean onan ye) SI
WATER ORG. PPA TK
PNEUMATIC DIAPHRAGM PUMP (DAP2)
NEUTRALIZING AGENT TANK (NAT)
~ TRO GRAVITY DRAIN TANK (TGDT)
~__SEA WATER PUMP STARTER PANEL (SWPSP)
SEA WATER PUMP (SWP1
NEUMATIC DIAPHRAGM PUMP (DAP1:
PRELIMINARY
JA
argo, BWTS ARRANGEMENT EQUIPMENT sneer PAPER Oe
- navis DATE REV. No. DRAWING No. SCALE
NS | osioareoze - 21468-6-04 1125
6 5 a 3 T Z T Ti 2 i
ee
ae Ser Rerevenn
eh
2ND DECK (9490mm A/B,
FILTER STARTER PANEL (FSP-1-A)
CONNECTION PANEL (JB)
"CONTROL PANEL (CP1
FILTER (F-1-A)
ELECTROLYTIC CELL (C-1-A)
__SUCTION PUMP (SP-1-A)
PRELIMINARY
ae aire ammmcevenreaurven —— [SWEETN® [PAPERS
— iL navis DATE REV. No. DRAWING No. ‘SCALE
i i 04/03/2022 - 21468-6-04 19128,
4 T 2 T Ti 2 i 1
1ST DECK (14800mm A/B)
_TRANSFORMER RECTIFIER (TIR-1-A)
Te
an ae SEC
A
; PRELIMINARY
argo BWTS ARRANGEMENT EQUIPMENT sneer ne PAPER a
pes DATE REV. No. DRAWING No. SCALE
Nw | owosr2022 - 21468-6-04 1125
T 2 T T2
enter D/G AM
* EROINE
CREW{AY
A-DECK (24500mm A/B
_REPEATER PANEL (RP1)
PRELIMINARY
argo, BWTS ARRANGEMENT EQUIPMENT sneer i PAPER a
yrs) DATE REV. No. DRAWING No. SCALE
NS | osioareoze - 21468-6-04 1125
3 T Z T T3 L 2
PRELIMINARY
ELEVATION (PORT.
LUPP.DECK(INCL, CAMBER) _
25506 58
SEA
CH
He) Mie te
a
SEA WATER PUMP (SWP1 |
WATER PUMP STARTER PANEL (SWPSP) | | |
ILORINE SENSOR MODULE (TRO2)_| |
cH
LORINE SENSOR MODULE (TRO!) |
TRO GRAVITY DRAIN TANK (TGDT)
PNEUMATIC DIAPHRAGM PUMP (OAPS
__ ELECTROLYTIC CELL (C-1-A)
FILTER (F-1-A)
‘SUCTION PUMP (SP-1-A)
NEUTRALIZING AGENT TANK (NAT)
__PNEUMATIC DIAPHRAGM PUMP (DAP2)
PNEUMATIC DIAPHRAGM PUMP (DAP1
——_ TRANSFORMER RECTIFIER (TIR-1-A)
_CONTROL PANEL (CP1
WTS ARRANGEMENT EQUIPMENT
‘SHEET No.
616
PAPER SIZE
AS
o4/oa2022 -
DATE REV. No. DRAWING No.
21468-6-04
‘SCALE
1:150
4
3 T 2