You are on page 1of 2

GENERAL NOTES

NOTE 1: REPRODUCTION OF THE BUILDER'S DRAWING IS DONE BY THE ORDER OF THE VESSEL'S OWNER
AND FOR THE PURPOSE OF THIS PROJECT ONLY.THIS DRAWING IS THE REPRODUCTION OF THE
BUILDER'S DRAWING No:
• DA700M001-16 "COMPRESSED AIR SYSTEM".

NOTE 2: BOLD LINES INDICATE NEW/ADDITIONAL LINES/ITEMS.

PRELIMINARY
REV. No. DATE DESCRIPTION DRAWN APPROVED

Title:

COMPRESSED AIR SYSTEM DIAGRAM

Drawn by: Project :


L.POPOVIĆ W-ORIGINAL
Checked by:
IMO NO.9627758
A.LEŠTANIN
Approved by: Date: Drawing Number: Class: LR Sheet size: A4
N.TODOSIJEVIĆ 04/03/2022 21468-P-PD-03 Scale: N/A Sheet No.: 2/3

1/2
118B, Agias Eleousis Str., Marousi, 151 25, Athens, ©Copyright
Greece Tel.: +302108056220 Fax: +302108056221 All drawings are property of ARGO NAVIS ENGINEERS LTD. and they
E-mail:mail@argonavis.gr Website:www.argonavis.gr must not be partially or wholly copied or used without the written permission
of ARGO NAVIS ENGINEERS LTD.
6 5 4 3 2 1

PRELIMINARY

TO CONSUMERS
D D

CAN01
NOTE 1
NOTE 1

NOTE 1
TP

LA001-JABBX-40A
17

TA103-JABBX-25A TO CONTROL AIR SYS.


18

TO Q.C.V. SYSTEM

TA219-JABAX-40A

TA220-JABAX-40A
TA143-JABBX-15A

TA006-JABEL-125A
7
TA103 * XA
TO INCINERATOR

TA129
C TA041 TA040 TA104
* C
XS
TA104-JABBX-40A
CONTROL AIR
TA005-JABEL-125A MAIN AIR RESERVOIR DRYER
(5.0 M3 x 30 bar g) (150 M3/H)

TA042
TA043

TA101-JABBX-40A
PI PI
TA0045 TA044
NO.2 NO.1
* PT TA004-JABEL-50A * PT

TA047

TA046
PIAL PIAL
PI PI
TA014-JABEL-40A C F
ECC ECC

TA223-JABBX-25A
TA065

TA069
TA056
TA068
TA066

TA015-JABEL-40A

TA070
TA072
TA058
B PI
TA222-JABBX-25A B
TA067

TA071
TA048 TA052 TA054

SET 8.8bar g
TA050

TA060
NOTE 1 TA057
TA059
* PI
PS

* TA040 TA053 TA055


PS TA110-JABBX-50A
TA003-JABEL-50A
TA216-JABAX-15A

LEAD-FOLLOW NOTE 1
FUNCTION TA051
TA215-JABAX-15A

FROM 30 TO 8 bar g
NOTE 1

NOTE 1

NOTE 1

A A
SHEET No. PAPER SIZE
COMPRESSED AIR SYSTEM DIAGRAM
2/2 A3
DATE REV. No. DRAWING No. SCALE
04/03/2022 -- 21468-P-PD-03 N/A

6 5 4 3 2 1