PROJECT: SM CENTER SAN PEDRO

LOCATION: Brgy. United Bayanihan San Pedro, Laguna


SUBJECT:
DATE
SUPPLIER :
Original

QTY. BAR Ø LENGTH GRADE kg/m KGS.


483.00 12.00 75 0.62 3,570.34
634.00 10.50 75 0.62 4,100.71
442.00 10mm 9.00 75 0.62 2,450.45
111.00 7.50 75 0.62 512.82
- 6.00 75 0.62 -
TOTAL = 10,634.32

Prepared by Noted by

Engr. Ricky Calara Engr. Marvin Isidro


Project Engineer Project Manager

Checked by

Engr. Lester Gene Gasita


Project-In-Charge
SM CENTER SAN PEDRO

Brgy. San Vicente, San Pedro Laguna


BAR BENDING SCHEDULE

- -
10,634.32 10,771.51 -1.29%

CUT WEIGHT / Total Comm.


LOCATION / a QTY BAR Ø Final Qty Comm.L Total Cut Wt Wastage
sets LENGTH METER Wt
ITEM
(m) (pcs) (m) (mm) (kg)

- x - - - -
- x - - - -
- x - - - -
- x - - - -
- x - - - -
- x - - - -