You are on page 1of 5

SM CENTER SAN PEDRO

Brgy. San Vicente, San Pedro Laguna


BAR BENDING SCHEDULE

- -
#REF! 48,886.10 #REF!
#REF! 48,886.10
CUT WEIGHT / Total Comm.
LOCATION / a QTY BAR Ø CUT WEIGHT Final Qty Comm.L Total Cut Wt Wastage
sets LENGTH METER Wt
ITEM
(m) (pcs) (m) (mm) (kg) (kg)

- - x - - - -
- - x - - - -
- - x - - - -
- - x - - - -
- - x - - - -
- - x - - - -
PROJECT: SM CENTER SAN PEDRO
LOCATION: Brgy. United Bayanihan San Pedro, Laguna
SUBJECT: R.O.L # - 12
DATE 24-Aug-22
SUPPLIER : Steel Asia
Original
Beams & Girders @ Lower Ground Zone 5
QTY. BAR Ø LENGTH GRADE kg/m KGS.
15.00 60 0.89 -
13.50 60 0.89 -
1,159.00 12.00 60 0.89 12,350.30
745.00 12mm 10.50 60 0.89 6,946.38
1,077.00 9.00 60 0.89 8,607.38
176.00 7.50 60 0.89 1,172.16
620.00 6.00 60 0.89 3,303.36
15.00 60 0.62 -
13.50 60 0.62 -
600.00 12.00 60 0.62 4,435.20
461.00 10mm 10.50 60 0.62 2,981.75
817.00 9.00 60 0.62 4,529.45
365.00 7.50 60 0.62 1,686.30
1,393.00 6.00 60 0.62 5,148.53
TOTAL = 51,160.81

Prepared by Noted by

Engr. Ricky Calara Engr. Marvin Isidro


Project Engineer Project Manager

Checked by

Engr. Lester Gene Gasita


Project-In-Charge
SHO SPAN,BT CONT LG SPAN,BOT CONT SHO SPAN,TP CONT LG SPAN,TOP CONT
SLAB SET L W SPA W # L LNT SPA L # L LNT SPA W# L LNT SPA L # L LNT
URS-1 12 16.2 4.8 0.2 25 417.5 0.35 48 254.4 0.25 20.2 337.34 0.35 48 254.4
SHO SPAN,BOT EXT LG SPAN,BOT EXT SHO SPAN,TP CONT LG SPAN,TOP CONT
SPA W # L LNT SPA L #L LNT SPA W #L LNT SPA L #L
0.25 21 133.35 0.35 11.7 38.142 0.25 65.8 417.83 0.35 15
SPAN,TOP CONT
LNT TOTAL SIZE WT TOTAL WT
52.5 22865.54 12 0.888 20304.6

You might also like