You are on page 1of 8
AL MANAR ARABIAN CORP.(MACO) METHOD Document Ref. STATEMENT | PMF-010-QUA-004- | Revision 00 | Page | of 7 i, JWM029-1000-01-00 EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 1000MM became National Water Company \ duilagJI olroJI A4yh National Water Company Corporate Projects Nanagement Fomat PMF-010-QUA.004 athe Staten Page 7of7 AL MANAR ARABIAN CORP.(MACO) METHOD, STATEMENT Document Ref. PMF-010-QUA-004- JWM029-1000-01-00 Revision 00 | Page 2 of 7 ASPHALT WORK FOR Dia 1000MM. EXCAVATION & PIPE INSTALLATION & BACKFILLING AND wi usa EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR OPEN TRENCH DIA 1000MM EXCAVATION BELOW SWCC PIPELINES METHOD STATMENT Date: 01/12/2020 Version: 00 Document istry ae 1 issued for Review/Approval | [1 Issued for use Prepared by | Reviewed by | Approved by Document Ref. | Rev Issue Date Quality Site Projects Section Agent Manager RA ]2020 (Eyres! ee Zo. Ashe orien oma roan Nathod Statement Page 7 ot EXECUTION OF SEWER NETWORK FOR MAIN LINE /JWM 029 fi METHOD, ‘Document Ref, STATEMENT | PMF-O10QUA- | pevison co | page ond | 1000-01-00 eae EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 1000MM LIST OF CONTENTS, 1.0 PURPOSE «0.0... 2.0 SCOPE... 3.0 DOCUMENT CONTROL. 4.0 DEFINITIONS, TERMS AND ABBREVIATIONS 5.0 RESPONSIBILITY... 6.0 REFERENCES... 7.0 Excavation, Pipe Installation, Concrete and Asphalt Construction Work... 6 7.1 Work Preparation. 72 Work Execution. 7.3 Work Inspection 8.0. Safety & Hazard Plan... 8.1 Hazard Identification... 82 Preventive Measures... 9.0 Records Project Management Format PME-010.QUA-004 Method Sttemont Page Tot OF SEWER NETWORK FOR MAIN LINE /SWM 029 METHOD Document Ref. STATEMENT PMF-010-QUA- a da IWMD29, | Revision 00 Page 000 1000-01-00 = EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 1000MM 1.0 PURPOSE 1.1 ‘The purpose of this method statement is to provide a documented procedure for all activities related to Excavation, Trenching, Pipe Installation, Backfilling, ‘Compacting and Asphalt. 2.0 SCOPE 2.1 This method statement cover the trenching, excavation, pipe installation, backfilling and asphalt for line C31 which also includes manhole 3.0 DOCUMENT CONTROL 3.1. This project procedure is a controlled document as required by the Project Policy and issued in accordance with the project procedure document and data control MACO-QMP-004 3.2 Revisions of this document will be issued in accordance with the project procedure document and data control MACO-QMP-004 when the main text changes or when an appendix is added. Revised appendices for substitution will be issued separately and, where appropriate, will include a separate schedule of contents. 3.3. Document revision and appendix issue status are shown in the Project Register of Management System Documents, a copy of which may be obtained from the QA/QC Section upon request. 4.0 DEFINITIONS, TERMS AND ABBREVIATIONS 4.1 NWC National Water Company 42 MACO Manar Arabian Corp. 43° QP Quality Plan 44 SEPP Safety and Fire Prevention Plan 45 Consultant Shall mean ‘Fouad AL Saleh & Khaled Al Dhowalia Co Projet MonagomontFornst PuF-010-248-004 Method Stateront Page 7 of7 EXECUTION OF SEWER NETWORK FOR MAIN LINE /JWM 029 A METHOD | Document Ref. Serra (lu ror trar coat | Levon Page wis | __ 1000-01-00 at EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 100MM 5.0 RESPONSIBILITY 5.1 The Project Manager has overall responsibility for the implementation of this project procedure. Specific responsibilities have been assigned to members of the project management team as described below. 5.2 Each Site Engineer through his civil execution team is responsible for executing the as per the approved drawings and within the requested quality by the Contract. 5.3 The QC Manager is responsible for the preparation/reviewing of this procedure, its amendment, controlled distribution and verifying proper implementation. 6.0 REFERENCES Project Quality Plan reference number MACO-QP-NWC-JWM029-001-02 Project HSE Plan reference number MACO-SEPP-NWC-5WM029-001 Project Control of Documents and Data MACO-QMP-004 Project Control of Inspection & Testing Procedure reference number Project Control of Quality Records Procedure MACO-QMP-005 Contract Specification 7.0 Excavation, Pipe Installation, Concrete and Asphalt Construction Work 7.1 Work Preparation. 7.1.1. Earthwork shall be carried out in accordance with work procedure, site preparation 7.1.2. Pipe shall be stored of direct sunlight in a building or under a cover that allows free air circulation and the work backfill at crossing done manually without mechanical equipment. 7.13. . All Materials for concrete shall be approved by the supervising engineer before use 7.14. Subgrade and subBase Course shall be laid in layers each and compact. Project Management Format [Nethod Statoment PaF-o10.qUA006 Page Tot EXECUTION OF SEWER NETWORK FOR MAIN LINE /JWM 029 Ai [ METHOD Document Ref. sraTEMINT | PMESTOOUA | ion oo | roger he 1000-01-00 5 EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 100MM. 72 ray 72. 12. 125 12. Picject Management Format Method Statement ‘Work Execution 1. Excavation/Trenching shall be performed as indicated in the project specifications, trench excavation width. All excavations for structures, utility pips, appurtenances or cables shall be made to an extent that will provide sufficient space to work conveniently around the structure or pipe to be installed. 2 In general, for Underground pipe installation, follow the MANUFACTURER’S GUIDE for installing underground pipe. 3 All structural conerete shall be planned mix. Client shall approve batching plant and the design of the concrete mix to be used. A Prime coat, Tack coat Applications Placement of Asphaltic Concrete shall be ‘conforming to NWC Standards. 5. Crossing below SWCC Pipeline : a- Excavating very slowly. b- Manually check around SWCC pipe. Supporting pipes by using iron beam & fabric belt 15 Ton. + The space between the bottom SWC pipes and upper sewage pipes 1.5M 1uA-004 EXECUTION OF SEWER NETWORK FOR MAIN LINE /JWM 029 4 METHOD ‘Document Ref. STATEMENT | PMF-010-QUA- _ Mae twee | Revision 00 Page O9of OX 1000-01-00 Z EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 1000MM | al “Section A- A 73 Work Inspection 73.1 Crossing below SWCC Pipeline : 73.2 a Excavating very slowly. 73.3. b- Manually check around SWC pipe. 73:4 ce Supporting pipes by using iron beam below SWCC pipes by welded to shoring board & fabric belt 15 Ton.(Putted Rubber between iron beam and SWCC pipes) 73.5 d- The appropriate time to leave the pipes exposed will not exceed 4 working days 73.6 e The space between the bottom SWCC pipes and upper sewage pipes LSM 73.7 Hydro ‘Test for pipes Dia. 1000 mm should be applicable after trench backfilling 73.8. Perform all tests and inspection in accordance with the client speci ITP’ s Project Management Format Method Statement EXECUTION OF SEWER NETWORK FOR MAIN LINE /JWM 029 aa METHOD | Document Ref STATEMENT | PMF-010-QUA- 3 & 004-WM029- Revision 00 Page vcs v 1900-01-00 _ eee EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 1000MM 8.0 Safety & Hazard Plan 8.1 Hazard Identification 8.1.1 Refer to HSE Assessment Checklist Number 2-PMF-015-HSE-006-JWM029- 002 8.1.2. All open trenches and working areas to be protected from traffic by concrete block barriers with lighting. 82 Preventive Measures 8.2.1 Protective tools to be used ‘¢ Refer to HSE Assessment Checklist Number 2-PMF-015-HSE-006- JWM029-002 8.2.2 Accident Preventive safety procedure. © Pre-qualification of all equipment prior to the start of work. «© All personnel will be site trained. ‘© Mcthod statement shall be discussed with all concerned, ‘© Toolbox talks will be established and logged regularly. © Refer to HSE Assessment Checklist Number 2-PMF-015-HSE-006- JWM029-002 9.0 Records 9.1 Inspection records generated by this procedure are to be managed in accordance with the project procedure Control of Quality Records MACO-QMP-005. 9.2 Records of monitoring, analysis and improvement shall be maintained on site throughout the contract period, following which they shall be passed to the Corporate Quality Department. Such records shall be maintained for a period of two (2) years, after which they may be disposed. -- END OF TE Project Management Format Method Statement

You might also like