PMF-007-INT-002 - 02 Design Management Plan
PMF-007-INT-002 - 02 Design Management Plan
Date: dd/mm/yyyy
Version: 1/2/3, etc. <FOR THE PROJECT; NOT FOR THE TEMPLATE>
617920366.docx
DESIGN MANAGEMENT PLAN
Document Control
Document Information
Document History
Approval
Cluster Engineering
Section Head
617920366.docx 2 of 14
DESIGN MANAGEMENT PLAN
Distribution
Name Position
617920366.docx 3 of 14
DESIGN MANAGEMENT PLAN
Table of Contents
1 Introduction..............................................................................................................................................7
2 The Design Team......................................................................................................................................7
3 Change Management................................................................................................................................7
3.1 Responsibility for monitoring and controlling of design work..........................................................7
3.2 Change Management.......................................................................................................................7
3.2.1 Formal variation orders.............................................................................................................7
3.2.2 Updated plans and schedules...................................................................................................7
4 Scope Management for this Project.........................................................................................................7
4.1 Design Work Breakdown Structure (WBS)........................................................................................7
4.2 Formal process for acceptance and handover..................................................................................8
4.3 Controlling the scope........................................................................................................................8
4.3.1 Formal scope changes...............................................................................................................8
4.3.2 Records of design acceptance...................................................................................................8
5 Schedule Management for this Design Development...............................................................................8
5.1 Development of the design schedule...............................................................................................8
5.2 Controlling the design schedule........................................................................................................8
5.3 Monitoring of progress against the design schedule........................................................................8
5.3.1 Design office progress monitoring............................................................................................8
5.3.2 Cluster -level validation of design progress reports..................................................................8
6 Cost Management for this Design Development......................................................................................8
6.1 Cost estimating.................................................................................................................................8
6.2 Cost budgeting by whom?................................................................................................................8
6.2.1 Total budget allocation at Inception.........................................................................................9
6.2.2 Project target budget................................................................................................................9
6.2.3 Adjustment of the project target budget..................................................................................9
6.3 Controlling the design development cost.........................................................................................9
6.3.1 Design to the target budget......................................................................................................9
7 Quality Management for this Design Development..................................................................................9
7.1 Planning the quality of this design development..............................................................................9
7.1.1 Internal sources of quality requirements..................................................................................9
7.1.2 External sources of quality requirements.................................................................................9
7.2 Assuring the quality of this design development..............................................................................9
617920366.docx 4 of 14
DESIGN MANAGEMENT PLAN
617920366.docx 5 of 14
DESIGN MANAGEMENT PLAN
617920366.docx 6 of 14
DESIGN MANAGEMENT PLAN
1 Introduction
The purpose of this Design Management Plan (DMP) is to guide the design team in the performance of its
duty, which is to develop the design of the project to meet the required specifications within the approved
parameters of the contract budget and time schedule.
The DMP is intended to be concise, clear and consistent with all other contract documentation and terms
of engagement by Second-parties with National Water Company (NWC). The emphasis is upon identifying
policies, strategies and the lines of communication and key interfaces between the various parties involved
in the project’s design development.
This DMP is not a static document and it is anticipated that changes and amendments will be required in
accordance with the procedures described in the NWC Project Management Plan. Consequently, an
electronic master format will be used to facilitate its distribution and partial update, whenever required.
This DMP must be updated, as a minimum at each interim time when there is an approved change
request.
A read-only copy of this DMP, including all pages updated under formal revision, is made available for
access via the Project Site in NWC’s SharePoint system.
<INSERT A HYPERLINK HERE TO THE CONNECT FOLDER CONTAINING THE UP-TO-DATE DMP>
This DMP is a detail plan written in support of the NWC Project Management Plan (PMP), reference
<Project ID>_PMP
2 The Design Team
<HERE INSERT AN ORGANIZATION CHART OF THE DESIGN TEAM OR, IF THE DIAGRAM(S) ARE LARGER FORMAT SUCH AS A3 SIZE,
THEN ADD THE DIAGRAM(S) AS AN APPENDIX>
A design team directory is included as Appendix 15.1 to this DMP, giving full contact details of the named
design team members, as shown in the above organization chart.
3 Change Management
3.1 Responsibility for monitoring and controlling of design work
Refer to Section 6 of the NWC Project Management Plan.
3.2 Change Management
Refer to Section 6 of the NWC Project Management Plan.
3.2.1 Formal variation orders
A table of approved change requests is included in Appendix 15.2 to this DMP.
3.2.2 Updated plans and schedules
For all approved change requests, this DMP and the design schedule shall be updated and re-issued by the
< Design Consultant> to record and reflect the change. Likewise, NWC shall update the project cost
estimate, the formal CAPEX budget allocation, the Project Master Schedule and the cash flow forecast (i.e.
create a new baseline in the Primavera database), in line with the agreed impact analysis carried out as part
of the change request approval.
The project’s risk and value registers must be reviewed as part of each change request impact analysis, and
must also be updated accordingly for each approved change request. Any modification of the risk and value
actions assigned to the design team, as a result of approved change requests, must also be documented in
updates of this DMP.
617920366.docx 7 of 14
DESIGN MANAGEMENT PLAN
617920366.docx 8 of 14
DESIGN MANAGEMENT PLAN
cost estimate records shall be submitted to the Project Document Controller for retention in the project
file.
6.2 Cost budgeting by whom?
Refer to Section 9 of the NWC Project Management Plan.
6.2.1 Total budget allocation at Inception
Refer to Section 9 of the NWC Project Management Plan.
6.2.2 Project target budget
Refer to Section 9 of the NWC Project Management Plan.
6.2.3 Adjustment of the project target budget
Refer to Section 9 of the NWC Project Management Plan.
6.3 Controlling the design development cost
Refer to Section 9 of the NWC Project Management Plan.
6.3.1 Design to the target budget
Refer to Section 9 of the NWC Project Management Plan.
7 Quality Management for this Design Development
7.1 Planning the quality of this design development
Refer to Section 10 of the NWC Project Management Plan.
7.1.1 Internal sources of quality requirements
Refer to Section 10 of the NWC Project Management Plan.
7.1.2 External sources of quality requirements
Refer to Section 10 of the NWC Project Management Plan.
7.2 Assuring the quality of this design development
Refer to Section 10 of the NWC Project Management Plan.
7.2.1 Design reviews
A schedule of formal design reviews is included as Appendix 15.5 to this DMP, identifying deliverables
under review, scope and purpose of the review, planned date of the review and who shall participate in the
review.
All such reviews must be recorded using checklists and submitted to the Project Document Controller for
logging into the project file.
All change requests arising from such reviews, and at any other time by the project team members or
stakeholders, must also be submitted to the Project Document Controller for logging into the project file
and for impact assessment through the Change Management process (see Section 6 of the NWC Project
Management Plan).
7.3 Controlling the quality of this design development
Refer to Section 10 of the NWC Project Management Plan.
7.3.1 Design acceptance
Refer to Section 10 of the NWC Project Management Plan.
617920366.docx 9 of 14
DESIGN MANAGEMENT PLAN
617920366.docx 10 of 14
DESIGN MANAGEMENT PLAN
617920366.docx 11 of 14
DESIGN MANAGEMENT PLAN
617920366.docx 12 of 14
DESIGN MANAGEMENT PLAN
15.6 Table of design team actions arising from the HAZID study
<INSERT A TABLE SHOWING UNIQUE REFERENCE, DATE OF ASSIGNMENT, ACTION DETAILS, ACTION STATUS AND COMMENTS (E.G.
IF DELAYED OR OBSTRUCTED)>
617920366.docx 13 of 14
DESIGN MANAGEMENT PLAN
15.7 Table of design team actions arising from the environmental impact assessment
<INSERT A TABLE SHOWING UNIQUE REFERENCE, DATE OF ASSIGNMENT, ACTION DETAILS, ACTION STATUS AND COMMENTS (E.G.
IF DELAYED OR OBSTRUCTED)>