MUNICIPALITY OF MINA
Office of the Municipal Mayor
ACTIVITY DESIGN
The efficiency of the LGUs in the delivery of basic social services plays a vital
role in the effective implementation of the programs and projects in the local
government unit. The different issues and concerns greatly affect the lives of every
citizen in the LGU. Thus, these should be addressed through set of competencies
and institutional arrangements that may include mainstreaming of systems and
structure, improvement of processes, introduction of new technologies, actual
immersion to best practices to acquire skills and knowledge for replication and
formulation of various plans.
Anent with the CDP and ELA, Capacity Development Program should be
executed through the Capacity Development Agenda (CapDev Agenda). This
program serves as one of the implementation instruments of the CDP and ELA by
outlining capacity building interventions, drawing the capacity development
Page 1 of 6
Republic of the Philippines
Province of Iloilo
MUNICIPALITY OF MINA
Office of the Municipal Mayor
strategies and rationalizing the capacity building efforts of the LGU. Through the
CapDev Agenda, individuals and organizations in the LGU will be able to strengthen
and maintain capabilities to achieve their own development objectives.
VII. OBJECTIVES:
VIII. METHODOLOGY
The formulation of ELA should initially emanate from the CDP Process,
using the Guidelines on CDP Preparation and the CDP Illustrative Guide. This
should be led by the MPDC with the Planning Team as participants. From the
Vision Reality Gap Analysis (based on the CDP Process), the Goals, Objectives
and Strategies that will address the identified gaps are derived.
Page 2 of 6
Republic of the Philippines
Province of Iloilo
MUNICIPALITY OF MINA
Office of the Municipal Mayor
X. PARTICIPANTS
A budget of _________________
Page 5 of 6
Republic of the Philippines
Province of Iloilo
MUNICIPALITY OF MINA
Office of the Municipal Mayor
Regional Office and DILG Iloilo Province at least ten (10) workings days after the
actual conduct of the activity.
Prepared by:
Approved:
Page 6 of 6