Professional Documents
Culture Documents
Payroll Camp 7 July19-25
Payroll Camp 7 July19-25
Provide initial design and plan for units (verify muna kay ar.carreon) sir tom panis
Alpa (San Fabian Subdivision) proposal SAN FABIAN Request copy of lot plans/map from Alpa office c/o sir ryan.
True copies of TCT/TAX DEC (need SPA; ROD prov.) (verify muna kay ar.carreon)
Punchlisting woks, Make a time table of works and weekly accomplishment report
Site inspection / visit
Payroll every week ends,, daily 200 budjet for food
Camp 7 residence site visit CAMP 7
*LITO - 600
*Irong - 400 bali- 1000
*2 Laborers- 300 bali- 1000
as built Re-cadd plans and reverify all measurements via site inspection, prep. For as built plans Fore PEPE
3-STOREY RESIDENTIAL BROOKSIDE
site visit/inspection Site safety inspection / visit 9637911850
Camp 7 RESIDENCE (PAINT WORKS ET AL.)
Date Covered JUNE 19-JUNE 25
TOTAL ADVANCE NET TOTAL RECEIVED
NAME RATE No. of Days
Lito 600 6 3600 0 3600
Irong 400 6 2400 1000 1400
Dominic (Labor 1) 300 6 1800 500 1300
Monsur (Labor 2) 300 6 1800 500 1300
PAYROLL 7600
MEALS per day 200 1200
TOTAL PAYROLL 8800
pending application Kagitingan Structural Design and Analysis for Buildings with floor area of 20.00 sq.m. or mo not applicable
as built Soil Analysis for Residential Buildings with 3 storeys or more (Signed and Sealed) not applicable
Building Specification (Signed and Sealed) not applicable
JOSE SR. & MARIA HEIR'S OF CORDOVIZ Geodetic Documents (Other necessary Geodetic Documents aside from Survey Plan) not applicable
Sheet 1 (Vicinity Map / Site Development Plan / A-1) not applicable
Geodetic Engineer Affidavit not applicable
Barangay Certificate not applicable