1. INTRODUCTION
Nameh Hotels & Resorts Pvt Ltd.(here after proponent) proposed to develop beach hotel
and resort in Calangute Village, Bardez Taluka, Goa. Proposed development is located in
Sy.No. 159/3(Part), Calangute Village, Bardez Taluka, Goa.
Proponent proposes to develop on a land measuring total plot area 14757 sq.m. The hotel
consists 44 rooms; with Total Built Up Area of the project is 4912.89 Sq.mtrs. Car parking
proposed can accommodate 32 cars.
The project will boost the tourism in Goa, in turn will enhance the economy of the region.
Local livelihoods will increase with more employment opportunities, support services.
2. DEMAND ANALYSIS
With around 41 lakh tourists, 2014 saw the largest year to year growth (30%)in terms of
total tourist arrivals since 1985. Year 2014 was also the first year since 2005 where the
proportion of Goa to Kerala tourists significantly increased-from 27% in 2013 to 32% in
2014. Arrivals in the Oct-Dec period have significantly increased from 35% to 47% from
2005 to 2014. Part of this increase is explained by the large proportion of mega events held
in the period.
Classification of Tourist Arrivals across Goa can be explained based on prominence and
activities. Salcette-Presence of the beaches as well as it being a commercial hub. e.g. –
Colva, Benaulim and Majorda. Tiswadi-Presence of the State capital (Panaji), Basilica of
BomJesus (a UNESCO World Heritage Site), gaming and other shopping avenues. Bardez–
Presence of a vibrant nightlife, water sports, roadside shopping and beaches e.g. Baga,
Anjuna, Candolim, Calangute, Sinquerimand Vagator.
Hotel Distribution across Goa: Most of the accommodation supply is concentrated towards
North Goa, particularly in Bardez and Tiswadi talukas due to the higher demand from
tourists. The demand in the South Goa is catered to by hotels mostly concentrated in
Salcette and Mormugao talukas.
The project development will support the growing demand of tourists in Goa.
3. SITE DETAILS
The proposed hotel construction has one ground floor, roof structures. The site plan along
with ground floor, roof plans are given below:
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
2
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
3
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
4
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
1. All precautionary measures will be ensured for the safety of construction labours while
working at the site.
2. Adequate sign & guide posts for traffic as per IRC (Indian Roads Congress) or ITE
(Institute of Transportatio E gi eers ,USA) to e i stalled like No parki g , Bus Stop , Gap
i the edia , Dri e slo ly , U-tur et .
3. Solar blinker light is provided at the gate to caution exit vehicles. Sign boards will be
installed to indicate the hump location at two places, one 10m in advance & another at 5m
before the hump.
All the above proposals are clearly indicated in the designed drawing.
4. OCCUPANCY DETAILS
Following table describes the peak occupancy, staff required in hotel to serve the guests in
the hotel.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
5
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
1. Guest Room
2. Staff
4. Kitchen
(44 rooms x2 guests x 3 meals) + (44 rooms x 1 visitor x 1 meal) + (44 rooms x 1.8 staff x 1
meal) x 15 liters/day = 8580 ltrs.
5. Restaurant
6. Laundry
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
6
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
1. Guest Room
2. Staff
3. Kitchen
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
7
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
8
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
BAFFLE WALL
Note:-
A 1. Raw sewage invert level = 1.63 below FGL
2. Wall thickness assumed = 200 mm.
3. All tanks should have C-Bar ladders
OVER FLOW
MH-1
IVL -1.63
OVER FLOW RAW SEWAGE
TO DRAIN
INLET
B RCC.SUPPORTS
100mmX100mm
EQUALISATION
TANK
EQUALISATION
RAW SETTLING TANK
SEWAGE TANK
SCREEN
INLET CHAMBER
MH
SLUDGE
HOLDING
PUMP ROOM SECTION B-B
TANK
VP
PSF ACF
SECTION C-C TO
TWST
MH LEGENDS
AERATION TO CD PSF : PRESSURE SAND FILTER
TANK TO AERATION SHT
TANK ACF : ACTIVATED CARBON FILTER
VP CD : CHLORINE DOSER
PS PF
PR PR : RAW SEWAGE PUMP
PF : FILTER FEED PUMP
PS : SLUDGE PUMP
MH
OVER FLOW
TO DRAIN
AB : AIR BLOWER
C SETTLING
C MH : MANHOLE (0.9 x 0.60 M)
TANK
OVER FLOW
TO DRAIN
MH1 :MANHOLE 1(0.8 x 0.60 M)
ECP : ELECTRIC CONTROL PANEL
MH
RCC.SUPPORTS
CLEAR 100mmX100mm
OVER FLOW
WATER DISCRIPTION
TANK
OVER FLOW
TO DRAIN
TO DRAIN
SLUDGE AERATION CLEAR TREATED SR.NO L W LD TD
HOLDING TANK WATER WATER 1. SCREEN CHAMBER 0.80 0.80 0.30 1.93
TANK SETTLING TANK TANK
2. EQUALISATION TANK 2.00 2.00 1.37 3.00
TANK
3. SLUDGE HOLDING TANK 2.00 1.00 2.70 3.00
MH EQUALISATION
TREATED TANK 4. AERATION TANK 2.00 1.10 2.70 3 .00
WATER
TANK OVER FLOW
TO DRAIN 5. SETTLING TANK 2.00 1.00 2.50 3.00
SECTION A-A
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
9
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
1. The out fall sewer main from the last manholes, (up to 140 M3 per day) will be let into a
screening chamber by gravity flow. Large solids particles shall be intercepted by a fine
screen. The screen shall be manually cleaned with suitable rake arrangement.
2. The sewage after screening is collected in a completely enclosed collection sump for
smoothing out peak flows. Provision of air shall be kept in this tank to break the solids in
suspension and to homogenize the sewage.
3. The homogenized sewage from the collection tank is pumped into a completely
enclosed below ground level moving bed bio reactor (MBBR) tank. Provision of air is made
in this tank using positive displacement roots type blowers. Heavy duty diffusers will be
installed to impart even aeration and mixing.
4. In the MBBR Reactor tank activated sludge process is carried out with the help of bio
film carriers.
5. Overflow of the reactor tank is taken to the tube settler for settling of the activated bio
mass. Settled bio mass would be wasted to sludge drying beds.
6. Overflow of the tube settler is taken to the Intermediate tank.
7. From the intermediate tank, effluent is pumped to a Pressure Sand Filter followed by an
Activated Carbon Filter. Intermediate tank is provided with level sensors and air diffusers
for maintaining aerobic conditions.
8. Before PSF effluent would be dosed with sodium hypo chloride for disinfection.
9. Treated effluent from outlet of ACF would be collected in treated effluent storage tank.
10. Treated water to be used for landscaping and flushing purposes.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
10
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
WATER PRESS SEWAGE FLOW DIAGRAM FOR SMBR SEWAGE TREATMENT PLANT
(MINIMUM CONTACT TIME FOR TRATMENT IS DESIGNED FOR 7HRS AND MORE
CHLORINE DOSING
SUSPENDED MEDIA
BAR SCREEN AND BIOREACTOR AIR IN
OIL SEPARATOR CHEMICAL DOSING PSF AND ACF
FILTERS
RAW SEWAGE
SLUDGE
TANK EQUALISATION BIOREACTOR SETTLING CLARIFIED
WATER
CLEAN
WATER
SLUDGE TRANSFER
GROUND LEVEL
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
11
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Pressure
Electric switch Pressure
panel gauge
To garden
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
12
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Pressure
Electric switch Pressure
panel gauge
To garden
Clean water
Treated
from outlets
sewage HYDRO-PNEUMATIC SYSTEM
sewage
tank
treatment valves
plant Pump will take the suction from the
treated tank and deliver via through
the Hydro-pneumatic tank to the
distribution system. It will maintain
Hydr-
the pre-described pressure of around
pneumatic
2.5 bars to 2.7bars inside the
tank 350ltrs
distribution line. Completely
Grundfos
automatic electronic panel will control
pumps
the system taking the inputs from the
pressure sensors located in the
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
13
Pre-feasibility Report- Nameh Hotels & Resorts Pvt Ltd. Goa.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
During monsoon season, instead of municipal water, rain water shall be used for all the
domestic purpose
Based on roof area of 1314.82 sq/m and average rain fall per day of 25 mm, the total rain
water collection per day is approx. 32.870 Cum.
It is intended to provide the rain water harvesting tank of 1day capacity, i.e.40 cum.
The water is transferred to rain water harvesting tank via network of chambers/ piping.
Before entering the tank, it is passed through coarse filtration. This water is transferred to
main UG tank by suitably filtering it. Filtration is achieved by activated carbon filter and
pressurized sand filter. Chlorine dozing is also done to dis-infect the same.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------