RISK ASSESSMENT

HSE RISK ASSESSMENT

PROJECT NAME: MEMUVO DMCC


Job ID:
SCOPE/ ACTIVITY: ELECTRICAL WORKS
RA DATE: 07/09/2022
RA REVISION NO.: R02

Kindly Note
If the severity rating lies between 1 to 16, then corrective actions
RISK MATRIX needs to be taken by the Engineer/ Supervisor with documentary
evidence, to reduce and/or eliminate the residual risk(s).

Probability

Health, Safety and Environmental Risk Classification


1 2 3 4 5
Corrective Action Risk Classification Personal Loss Financial Loss

Fatal / Permanent Major Incident


1-3 Immediate Very High - VH
Disability
1 1 2 3 4 5
4-9 Before task High - H Reportable Injury / Illness Serious Incident

Severit
commences < 3 days 2 2 4 6 8 10

y
10-16 Before task Moderate - M Non Reportable Injury / Moderate Incident
commences Illness > 3 days 3 3 6 9 12 15
Minor Incident
20-25 Acceptable Low - L First Aid Cases
4 4 8 12 16 20
Near miss / Slight
>25 Very Low - VL Clinic Visit Incident
5 5 10 15 20 25
RISK ASSESSMENT

Scope / Activity:
ELECTRICAL WORKS
RISK Risk Residual
ASSOCIATED Rating Risk
No. HAZARD IDENTIFIED WITH CONTROL MEASURES BY WHOM BY WHEN
HAZARD S P R S P R

Physical Use proper PPE & Clothing should be


Delivery of Material
Struck / hit by moving proper, designated person to supervise Site Engineer/ Before &
Loading and unloading
1 part of material 2 3 6 hoisting and lifting operation. To provide 2 3 6 Supervisor During The
material
during shifting activity appropriate PPE Task
( manual handling )

Use scaffolding erected by trained


scaffolders under competent supervision.
Full body harness to be used while working
Body injuries, at height and anchored and to secure
Personnel fall down, location. Site Engineer/ Before &
2 Working at height. 3 3 9 2 3 6
Falling object Barricade the area, secure the material
(Material or tools) properly, ensure “toe boards” and hand Supervisor during Task
rails are installed, use proper PPE. Proper
tagging and proper inspection

Slip, Trip and Fall


Provide sufficient Lightings, Safety vests.
hazards, Hit with
Maintain good housekeeping and do visual Site Engineer/ Before &
Insufficient Lighting & stationary or moving 3 4 12 2 4 8
3 inspection of workplace starting the work. Supervisor During Task
Poor House Keeping. objects/ Materials/
Stop work policy if feeling unwell.
Machineries.

Damaged cable or Periodic inspection of power tools Training


plug, Broken disk, 4 4 16 on proper replacing of grinding disk 2 4 8 Before &
Power Tools
4 Electrocution proper cable management and cable Site Engineer/ During the
Improper changing should be placed away from wet ground
of disk Noise, Spark Ear plugs used by all workers constantly Supervisor
exposed to grinding noise Spark
containment utilized
Proper gloves and face mask provided.
Color coded. task
Proper working platform for workers / use
Insert electrical wiring
Physical double leaf of steel ladder. Scaffolding Site Engineer/ Before & During the
5 into conceal piping 2 4 8 2 3 6
Workers slip and fall erecting by experience workers. To provide Supervisor task
(ceiling)
appropriate PPE.

Reviewed By:

Client: FABIANO DOS SANTOS ROCHA Signature: Date 07 / 09 / 2022

Project Manager: MOHAMMED SALIQ Signature: Date 07 / 09 / 2022