Use of Portable power tools 110v power or battery operated tools to be used L L L
Electrical shock
Safety boots to
Cuts and abrasions to Trained personnel – use of PPE be worn at all
hands, Eyes, Feet times, safety L M M
helmets and hi
visibility
regulation 14 clothing to be
Electric shock Hazards worn as per
Notes:
Risk = Residual risk after proposed control implemented
Additional controls should include target date and who is responsible for implementation
All Regulations are taken to be the latest published edition
Risk Assessment
Operation: Electrical Installation Risk Assessment
Assessor:
Date:
Hazard Chance Risk
Hazard Identified People Action / controls to reduce risk PPE severity Training Assessment
exposed H H H
M M M
L L L
Slips, Trips and Falls on the Ensure good Housekeeping, Check Access /
level Egress Routes are clear and check cable / hose L L L
routes to prevent trip hazards.
Notes:
Risk = Residual risk after proposed control implemented
Additional controls should include target date and who is responsible for implementation
All Regulations are taken to be the latest published edition
Risk Assessment
Operation: Electrical Installation Risk Assessment
Assessor:
Date:
Hazard Chance Risk
Hazard Identified People Action / controls to reduce risk PPE severity Training Assessment
exposed H H H
M M M
L L L
L L L
Notes:
Risk = Residual risk after proposed control implemented
Additional controls should include target date and who is responsible for implementation
All Regulations are taken to be the latest published edition
Risk Assessment
Operation: Electrical Installation Risk Assessment
Assessor:
Date:
Hazard Chance Risk
Hazard Identified People Action / controls to reduce risk PPE severity Training Assessment
exposed H H H
M M M
L L L
L L L
Statement is provided for all
Height work operations. Secure the work area,
Protect Public Persons.
Record 7 Day Inspection results in Scaffold
Notes:
Risk = Residual risk after proposed control implemented
Additional controls should include target date and who is responsible for implementation
All Regulations are taken to be the latest published edition