EHS RISK ASSESSMENT

ACTIVITY: INSTALLATION OF LIGHTING PROTECTION POLE, STREET LIGHTING POLE AND LIGHT FITTINGS
PACKAGE NUMBER: CG-4750

Current Risk Final Risk


Task (Steps) Potential Hazard Existing Control Additional Control Prob
Cons. Prob. Risk Cons. Risk
.

 Activity shall be carried out by


competent supervision.
 Supervisor to ensure all hot work
permit is available prior to
commencement of the task.
 Daily coordination with client.
 Working without  Toolbox talk to be held at site, this
work permit. will be covered the method
6.2 to 6.5  Unauthorized statement and job safety analysis.
4 2 8
workers at working  Toolbox talks to be given prior to
area. start the job.
 Competent workers to be
deployed, supervisor to ensure work
safe system.
 Coordination permission have to be
made with civil contractor before
start the work.

 All workers involved in the activity


 Heat stress. must be aware of heat stress, 4 3 12
supervisor to ensure drinking cold
water is available at the working area.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 1 of 5


EHS RISK ASSESSMENT

ACTIVITY: INSTALLATION OF LIGHTING PROTECTION POLE, STREET LIGHTING POLE AND LIGHT FITTINGS
PACKAGE NUMBER: CG-4750

 Operator must pass third party


competency test for crane
operation and secure competency
certificate.
 Operator should attend induction
course for carne operation.
Unauthorized
operation of  Crane/Boom truck must have:
6.6 crane / boom 1. Valid registration from RTA 4 3 12
truck to Travel.
2. Valid certificate of
conformity or through
crane /boom truck
inspection from approved
certification agencies.
3. Statement of insurance
policy.

 Crane must be certified by


approved third party certification
agencies.
 Gears, chains, and belts should be
Mechanical Failure inspected, certified and colour 4 3 12
coded to use.
 Avoid overloading of transport
equipment.
 Lift load for its specific load limit or
safe working load.
 Use tag lines or tag ropes to guide
the load towards its destination.
Having no control  Supervisor to advice workers not to
4 3 12
of the load walk, come close or stand under
the load.
 Assign a certified rigger/banksman.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 2 of 5


EHS RISK ASSESSMENT

ACTIVITY: INSTALLATION OF LIGHTING PROTECTION POLE, STREET LIGHTING POLE AND LIGHT FITTINGS
PACKAGE NUMBER: CG-4750

 Operator can be  Only certified rigger/banksman


confused if more are authorized to give signal
3 4 12
than one person during lifting operation.
giving instruction
or signal.
 Use of sharp
hand tools.
 Competency of
electrician.  Inspect the hand tools before use,
 Use damaged ensure the condition is good, use
hand tools may hand gloves.
slip and injure  Supervisor to ensure the
6.8 electrician or competency of electrician.
3 3 9
damage  Inspect heat gun before use, it is in
property. good condition, provide fire
 Use of Heat gun extinguisher.
( hot blower),
electricity / Fire.
 Use dust mask , safety glass &
 Touch- up paint. hand gloves while doing touch up
2 2 4
paint.

 Bad
 Maintain good housekeeping
housekeeping -
around the area.
6.13 workers may slip,
 All temporary cable should be
3 2 6
trip & fall at same
properly organized.
ground.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 3 of 5


EHS RISK ASSESSMENT

ACTIVITY: INSTALLATION OF LIGHTING PROTECTION POLE, STREET LIGHTING POLE AND LIGHT FITTINGS
PACKAGE NUMBER: CG-4750

Only competent and authorized


 Unauthorized person to do the inspection, ensure
2 1 2
workers notified the client with all necessary
documents.

 All personnel involve in the testing


must wear P.P.E.'s at all times (e.g.
 Not using P.P.E.'s hard hat, safety glass, safety shoes, 2 1 2
hand gloves, dust mask, long sleeve
shirt).

NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 – 25 (Method Statement plus additional Control Measures in place)
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5

Risk assessment compiled by :

Risk Assessor:
SACHIN BABU EHS ADVISOR 09-04-2012

Name Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 4 of 5


EHS RISK ASSESSMENT

ACTIVITY: INSTALLATION OF LIGHTING PROTECTION POLE, STREET LIGHTING POLE AND LIGHT FITTINGS
PACKAGE NUMBER: CG-4750

Risk assessment approved by :

EHS Department:

Name Designation Signature Date

Construction:

Name Designation Signature Date

Management:

Name Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 5 of 5