73% found this document useful (11 votes)
17K views5 pages

Method Statement For The Loading, Unloading and Shifting of Material

This document provides a method statement for loading, unloading, and shifting materials. It outlines the safety considerations and preparation needed, including developing a risk assessment, securing permits, and monitoring the work. The preparation section specifies the equipment required like trucks, cranes, riggers, barricades and signage. The execution section describes barricading the work areas, positioning vehicles and equipment, and the step-by-step process for safely loading and unloading materials using cranes, riggers, and other certified operators and equipment.

Uploaded by

Em Niax
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
73% found this document useful (11 votes)
17K views5 pages

Method Statement For The Loading, Unloading and Shifting of Material

This document provides a method statement for loading, unloading, and shifting materials. It outlines the safety considerations and preparation needed, including developing a risk assessment, securing permits, and monitoring the work. The preparation section specifies the equipment required like trucks, cranes, riggers, barricades and signage. The execution section describes barricading the work areas, positioning vehicles and equipment, and the step-by-step process for safely loading and unloading materials using cranes, riggers, and other certified operators and equipment.

Uploaded by

Em Niax
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Method Statement for

the Loading, unloading


and shifting of Material

MMR-MS-01 REVISION NO. 00

September 30, 2021

Method Statement for the


Loading, unloading and shifting
of Material

1
Method Statement for
the Loading, unloading
and shifting of Material

MMR-MS-01 REVISION NO. 00

CONTENTS
1.0 INTRODUCTION
2.0 SAFETY
3.0 PREPARATION AND EXECUTION
4.0 RAMS

2
Method Statement for
the Loading, unloading
and shifting of Material

MMR-MS-01 REVISION NO. 00

1.0 INTRODUCTION

The purpose of this Method Statement for The Loading and Unloading of containers,
cable drums and other materials is to explain how the works will be carried out in a
safely manner and to follow the standard lifting procedure being implemented with
KAUST premises.

2.0 SAFETY

The important considerations for H&S are:


 Developing RAMS.
 Securing Permit to Work.
 Monitoring the preparation and execution of the work in a safely manner.
 Lifting procedure

3.0 PREPARATION AND EXECUTION

 The Loading, unloading and shifting preparation for the Jersey Barriers are the
following.
a) Low-bed trucks
b) Inspection of sling for the mobile crane
c) Mobile cranes (25T)
d) Certified mobile crane operator
e) Certified riggers
f) Flagman
g) Temporary signage and barricade
h) Certified bobcat
i) Certified forklift
Before start the work, first cordon off the area to where to load or unload the materials.

 Checking the capacity of the mobile crane.

3
Method Statement for
the Loading, unloading
and shifting of Material

MMR-MS-01 REVISION NO. 00

 Checking the capacity of the low bed truck in which it can carry depending on
the axle load.
 Upon completing the required equipment and manpower for the activity, MMR
safety officer will conduct tool box talk in relation to the activity that will going to
perform.
 MMR will starts to barricade the area that will covered the lifting point prior to
the execution of the activities.
 Temporary signage will also be installed mentioning/informing lifting activities is
on-going.
 Upon completing the barricade and signage, MMR flagman then will give
direction to the low bed and mobile crane for their position.
 Final set-up and position will be commence by the operators for low bed and
mobile crane.
 Prior to the lifting activity, permits to work from the lifting location and to the
unloading location will be secure.
 Taking all necessary permits, loading and unloading will start.
 Lifting will start with the help of the rigger which gives the signal to the operator
to unload/load the materials on low bed trucks.
 With the guidance of rigger, the mobile crane operator will follow the signal.
 During the lifting, no person is allow to stay below the lifting activity.
 MMR will use certified bobcat and forklift to shift the material operated by
certified operators.