This document is an estimate report from PT. Pelayaran Mitra Kaltim Samudra for replating the hull and deck of a barge called BG. It includes a work description section with fields for part, sub-part, frame, material, dimensions, quantity, unit, and total weight but all the quantities are listed as 0 or 0.0%, indicating no work items are specified. It also includes the shipyard contact information and estimate number but no other details about the planned work.
This document is an estimate report from PT. Pelayaran Mitra Kaltim Samudra for replating the hull and deck of a barge called BG. It includes a work description section with fields for part, sub-part, frame, material, dimensions, quantity, unit, and total weight but all the quantities are listed as 0 or 0.0%, indicating no work items are specified. It also includes the shipyard contact information and estimate number but no other details about the planned work.
This document is an estimate report from PT. Pelayaran Mitra Kaltim Samudra for replating the hull and deck of a barge called BG. It includes a work description section with fields for part, sub-part, frame, material, dimensions, quantity, unit, and total weight but all the quantities are listed as 0 or 0.0%, indicating no work items are specified. It also includes the shipyard contact information and estimate number but no other details about the planned work.
WORK DESCRIPTION NO Dimensi (mm) Total Berat Bagian Sub-Bagian Frame Material Rms QTY SAT (Kg) P L1 L2 L3 L4 T BJ 0.000000 0.0% - 0.000000 0.0% - 0.000000 0.0% -
Dicetak: 09/13/2022 01:11:27 Page 3 of 11
WORK DESCRIPTION NO Dimensi (mm) Total Berat Bagian Sub-Bagian Frame Material Rms QTY SAT (Kg) P L1 L2 L3 L4 T BJ 0.000000 0 - 0.000000 0 - 0.000000 0 - 0.000000 0 - 0.000000 0 - 0.000000 0 - 0.000000 0 - 0.000000 0 - Total Aktual Tonase -