You are on page 1of 22

SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia

Gray Water Supply Fixture Unit (WSFU) Calculation (Grand Total for Gray Water)
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUPPLY
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTROL TYPE
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET - 7 9 9 7 5 5 5 6 5 - 58 58 0 58 8.00 464.00 FLUSH VALVE

WC-2 HANDICAPPED WATER CLOS - - 1 1 1 1 1 1 1 1 - 8 8 0 8 8.00 64.00 FLUSH VALVE SENSOR

WC-3 WESTERN WATER CLOSET (V - - 4 - - - - - 8 - - 12 12 0 12 2.50 30.00 GRAVITY TANK

JS JANITOR SINK - 2 2 2 2 2 2 2 2 2 - 18 18 18 36 2.00 72.00 MIXING VALVE

HB HOSE BIBB FAUCET 4 4 5 3 3 3 3 3 4 5 1 38 38 0 38 2.50 95.00 FAUCET

TOTALS 4 13 21 15 13 11 11 11 21 13 1 134 134 18 152 - 725.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 725.00 WSFU

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 166.50 GPM 37.81 m3/H
Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø 4" Ø100 mm.

SELECTED PIPE MATERIAL FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


ARKITECTONICA Engineering Consultants November 2013
SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Roof Annex Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUPPLY
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTROL TYPE
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 5 - 5 5 0 5 8.00 40.00 FLUSH VALVE

WC-2 HANDICAPPED WATER CLOSET 1 - 1 1 0 1 8.00 8.00 FLUSH VALVE SENSOR

WC-3 WESTERN WATER CLOSET (VIP) - - 0 0 0 0 2.50 0.00 GRAVITY TANK

JS JANITOR SINK 2 - 2 2 2 4 2.00 8.00 MIXING VALVE

HB HOSE BIBB FAUCET 5 1 6 6 0 6 2.50 15.00 FAUCET

TOTALS 13 1 14 14 2 16 - 71.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 71.00 WSFU

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 59.90 GPM 13.60 m3/H
Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2" Ø65 mm.

SELECTED PIPE MATERIAL FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


ARKITECTONICA Engineering Consultants November 2013
SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Sixth Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUPPLY
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTROL TYPE
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 6 6 6 0 6 8.00 48.00 FLUSH VALVE

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VALVE SENSOR

WC-3 WESTERN WATER CLOSET (VIP) 8 8 8 0 8 2.50 20.00 GRAVITY TANK

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VALVE

HB HOSE BIBB FAUCET 4 4 4 0 4 2.50 10.00 FAUCET

TOTALS 21 21 21 2 23 - 94.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 94.00 WSFU

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 65.90 GPM 14.96 m3/H
Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2" Ø65 mm.

SELECTED PIPE MATERIAL FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


ARKITECTONICA Engineering Consultants November 2013
SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Fifth Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUPPLY
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTROL TYPE
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 5 5 5 0 5 8.00 40.00 FLUSH VALVE

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VALVE SENSOR

WC-3 WESTERN WATER CLOSET (VIP) - 0 0 0 0 2.50 0.00 GRAVITY TANK

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VALVE

HB HOSE BIBB FAUCET 4 4 4 0 4 2.50 10.00 FAUCET

TOTALS 12 12 12 2 14 - 66.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 66.00 WSFU

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 57.30 GPM 13.01 m3/H
Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2" Ø65 mm.

SELECTED PIPE MATERIAL FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


ARKITECTONICA Engineering Consultants November 2013
SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Fourth Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUPPLY
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTROL TYPE
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 5 5 5 0 5 8.00 40.00 FLUSH VALVE

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VALVE SENSOR

WC-3 WESTERN WATER CLOSET (VIP) - 0 0 0 0 2.50 0.00 GRAVITY TANK

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VALVE

HB HOSE BIBB FAUCET 3 3 3 0 3 2.50 7.50 FAUCET

TOTALS 11 11 11 2 13 - 63.50

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 63.50 WSFU

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 57.30 GPM 13.01 m3/H
Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2" Ø65 mm.

SELECTED PIPE MATERIAL FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


ARKITECTONICA Engineering Consultants November 2013
SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Third Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUPPLY
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTROL TYPE
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 5 5 5 0 5 8.00 40.00 FLUSH VALVE

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VALVE SENSOR

WC-3 WESTERN WATER CLOSET (VIP) - 0 0 0 0 2.50 0.00 GRAVITY TANK

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VALVE

HB HOSE BIBB FAUCET 3 3 3 0 3 2.50 7.50 FAUCET

TOTALS 11 11 11 2 13 - 63.50

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 63.50 WSFU

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 57.30 GPM 13.01 m3/H
Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2" Ø65 mm.

SELECTED PIPE MATERIAL FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


ARKITECTONICA Engineering Consultants November 2013
SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Second Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUPPLY
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTROL TYPE
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 5 5 5 0 5 8.00 40.00 FLUSH VALVE

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VALVE SENSOR

WC-3 WESTERN WATER CLOSET (VIP) 3 3 3 0 3 2.50 7.50 GRAVITY TANK

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VALVE

HB HOSE BIBB FAUCET 3 3 3 0 3 2.50 7.50 FAUCET

TOTALS 14 14 14 2 16 - 71.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 71.00 WSFU

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 58.00 GPM 13.17 m3/H
Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2" Ø65 mm.

SELECTED PIPE MATERIAL FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


ARKITECTONICA Engineering Consultants November 2013
SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for First Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUPPLY
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTROL TYPE
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 9 9 9 0 9 8.00 72.00 FLUSH VALVE

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VALVE SENSOR

WC-3 WESTERN WATER CLOSET (VIP) - 0 0 0 0 2.50 0.00 GRAVITY TANK

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VALVE

HB HOSE BIBB FAUCET 3 3 3 0 3 2.50 7.50 FAUCET

TOTALS 15 15 15 2 17 - 95.50

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 95.50 WSFU

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 69.10 GPM 15.69 m3/H
Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2" Ø65 mm.

SELECTED PIPE MATERIAL FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


ARKITECTONICA Engineering Consultants November 2013
SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for Ground Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUPPLY
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTROL TYPE
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 8 8 8 0 8 8.00 64.00 FLUSH VALVE

WC-2 HANDICAPPED WATER CLOSET 1 1 1 0 1 8.00 8.00 FLUSH VALVE SENSOR

WC-3 WESTERN WATER CLOSET (VIP) 4 4 4 0 4 2.50 10.00 GRAVITY TANK

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VALVE

HB HOSE BIBB FAUCET 5 5 5 0 5 2.50 12.50 FAUCET

TOTALS 20 20 20 2 22 - 102.50

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 102.50 WSFU

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 73.50 GPM 16.69 m3/H
Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2" Ø65 mm.

SELECTED PIPE MATERIAL FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


ARKITECTONICA Engineering Consultants November 2013
SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for 1st Basement Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUPPLY
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTROL TYPE
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET 7 7 7 0 7 8.00 56.00 FLUSH VALVE

WC-2 HANDICAPPED WATER CLOSET - 0 0 0 0 8.00 0.00 FLUSH VALVE SENSOR

WC-3 WESTERN WATER CLOSET (VIP) - 0 0 0 0 2.50 0.00 GRAVITY TANK

JS JANITOR SINK 2 2 2 2 4 2.00 8.00 MIXING VALVE

HB HOSE BIBB FAUCET 5 5 5 0 5 2.50 12.50 FAUCET

TOTALS 14 14 14 2 16 - 76.50

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 76.50 WSFU

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 60.80 GPM 13.80 m3/H
Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø2-1/2" Ø65 mm.

SELECTED PIPE MATERIAL FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


ARKITECTONICA Engineering Consultants November 2013
SABB Corporate Real Estate Headquater in Jeddah, Saudi Arabia
Gray Water Supply Fixture Unit (WSFU) Calculation for 2nd Basement Floor
HOT &
WSFU
COLD WSFU
DESCRIPTION OF TOILET FIXTURES QUANTITY PER FLOOR TOTAL QTY WATER SUPPLY
FIXTURE
FIXTURE
LEGEND TOILET
FIXTURES 2B 1B GF 1F 2F 3F 4F 5F 6F RA UR TOTALS COLD HOT CONTROL TYPE
TOTALS
VALUE
TOTAL QTY
WC-1 WESTERN WATER CLOSET - 0 0 0 0 8.00 0.00 FLUSH VALVE

WC-2 HANDICAPPED WATER CLOS - 0 0 0 0 8.00 0.00 FLUSH VALVE SENSOR

WC-3 WESTERN WATER CLOSET (V - 0 0 0 0 2.50 0.00 GRAVITY TANK

JS JANITOR SINK - 0 0 0 0 2.00 0.00 MIXING VALVE

HB HOSE BIBB FAUCET 4 4 4 0 4 2.50 10.00 FAUCET

TOTALS 4 4 4 0 4 - 10.00

Reference of Standards GRAND TOTAL WATER SUPPLY FIXTURE UNIT (WSFU) 10.00 WSFU

TOTAL ESTIMATED DEMAND LOAD (SEE CHART A-3) 27 GPM 6.13 m3/H
Uniform Plumbing Codes 2000
1
Edition
MAIN PIPE SIZE AT 2 lbs/inch2/100 ft length (See Chart A-5) Ø 2" Ø50 mm.

SELECTED PIPE MATERIAL FISIOTHERM PPR

ARKITECTONICA Engineering Consultants November 2013


ARKITECTONICA Engineering Consultants November 2013