COLD SIDE (CHILLED WATER CONNECTION) HOT SIDE (WATER TANK CONNECTION)
FILTERED WATER SUITABLE FOR
RECOVERY DESIGN
STORAGE TANK MAXIMUM AMBIENT
PERIOD COOLING FLOW PRESSURE OUTLET PRESSURE PRESSURE
CAPACITY CHILLED WATER INLET TEMP FLOW RATE TEMPERATURE
LOAD RATE DROP TEMP DROP
SR. NO REFERENCE DESCRIPTION SERVICES QTY REMARK
GROUND FLOOR -HRH, LOBBY, STAND BY UNIT SHALL HAVE DX COIL & AIR
WATING, MAJLIS, COOLED CONDENSER WITH
7 AHU-GF-Z05-03 & 04 AHU ROOM-BASEMENT 20 deg C @ 50 RH 11500 1000 YES 350 20.7 / 14.2 10.7 / 10.1 130 125 6.6/12.2 5.55 11.0 14.1 40 THYRISTOR 15 STEAM 1.0 27.6 40 IE3 400/3/60 VFD MERV-08 (G4) MERV-13 ( F7) YES YES DUTY & STAND BY
MOKHTASAR,PRIVATE ENVIRONMENTAL FRIENDLY
MEETING,SECRETARY OFFIC ETC REFERIGERANT
NOTES:
1. PRIOR TO ORDER THE MATERIAL ESP & SIZE OF AHU TO BE VERIFIED BY THE CONTRACTOR AND THE SAME SHALL BE SUBMITTED FOR APPROVAL.
2. PROVIDED CAPACITY IS CALCULATED ONLY CONTRACTOR TO ALLOW 10% ADDITIONAL CAPACITY FOR COMMISSIONING ALLOWANCE
L01 Project
SCHEDULE OF AIR HANDLING UNITS FOR BASEMENT
NOTES:
1. PRIOR TO ORDER THE MATERIAL ESP & SIZE OF AHU TO BE VERIFIED BY THE CONTRACTOR AND THE SAME SHALL BE SUBMITTED FOR APPROVAL.
2. PROVIDED CAPACITY IS CALCULATED ONLY CONTRACTOR TO ALLOW 10% ADDITIONAL CAPACITY FOR COMMISSIONING ALLOWANCE
L01 Project
SCHEDULE OF AIR HANDLING UNITS FOR FIRST FLOOR
1 AHU-MZ-Z02-01 MZ-DINING AREA BASEMENT AHU ROOM 20 deg C @ 50 RH 5500 1600 YES 550 20.6/14.1 9.6/9.0 80 70 6.6/12.2 3.41 10.2 13.4 20 THYRISTOR 15 STEAM 1.0 20.0 20 IE3 400/3/60 VFD MERV-08 (G4) MERV-13 ( F7) N.A N.A DUTY
COOLING COIL HEATING COIL ( WINTER HEATING AND HUMIDITY CONTROL IN SUMMER ) HUMIDIFIER ELECTRICAL INPUTS FILTER
TREATED FRESH AIR
SUPPLY
TO SIZE PLENUM BOX
AIRFLOW RATE MIXING BOX FOR ESP
( MAKE UP AIR SUPPLY IS NOMINAL ELECTRICAL UV LAMP FOR
SR DESIGN TEMP IN FRESH AIR AND CAPACITY SENSIBLE CHW FOW AIR ON AIR OFF SUPPLY FAN
REF. AREA TO BE SERVED LOCATION 20 DEG C @ 50 RH ) - THIS AIR ON AIR OFF CHW IN/OUT HEATING CAPACITY HEATER DISINSFECTIO QTY REMARKS
NO. SPACE RETURN AIR WITH TOTAL LOAD RATE (DEHUMIDIFICATION) (DEHUMIDIFICATION ) MOTOR
IS APPROXIMATE ONLY CAPACITY HEATER CAPACITY N
DAMPER TYPE EFFICIENC V-PH-HZ STARTER PANEL BAG FILTER HEPA FILTER
CONTROL
Y CLASS
NOTES:
1. PRIOR TO ORDER THE MATERIAL ESP & SIZE OF AHU TO BE VERIFIED BY THE CONTRACTOR AND THE SAME SHALL BE SUBMITTED FOR APPROVAL.
2. PROVIDED CAPACITY IS CALCULATED ONLY CONTRACTOR TO ALLOW 10% ADDITIONAL CAPACITY FOR COMMISSIONING ALLOWANCE
L01 Project
CHILLED WATER PUMP SCHEDULE
CONSTANT SPEED,
BASE MOUNTED END 7 DUTY +1 STAND BY
1 PCHWP-GF-01 TO 08 PRIMARY CHILLED WATER PUMP CHILLER CHW PLANT ROOM 357 51 400 60 400/3/60 IE3 1800 STAR DELTA 8
SUCTION, LONG
COUPLED PUMP
VARIABLE SPEED ,
CHW NETWORK BASE MOUNTED END 7 DUTY +1 STAND BY
2 SCHWP-GF-01 TO 08 SECONDARY CHILLED WATER PUMP CHW PLANT ROOM 357 51 1000 110 400/3/60 IE3 1800 VFD 8
(AHUs,FAHUs & FCUs) SUCTION, LONG
COUPLED PUMP
NOTES:
1. PRIOR TO ORDER THE MATERIAL ESP & SIZE OF AHU TO BE VERIFIED BY THE CONTRACTOR AND THE SAME SHALL BE SUBMITTED FOR APPROVAL.
2. PROVIDED CAPACITY IS CALCULATED ONLY CONTRACTOR TO ALLOW 10% ADDITIONAL CAPACITY FOR COMMISSIONING ALLOWANCE
L01 Project
AIR COOLED CHILLER SCHEDULE
TRANSFORMER SCHEDULE
GENERATOR SCHEDULE
Standby Generator
SL.No Quanity( Nos) Voltage Type Rated Frequency(Hz)
Rating
Indoor type - Standby
1 2500 KVA / 2000KW 7 400-230V 60
Operation
Indoor type - Standby
2 2000KVA / 1600KW 3 400-230V 60
Operation
L01 Project
HV PANEL SCHEDULE
HV PANEL SCHEDULE
Maximum Symmetrical
SL.No Quanity( Nos) Nominal Voltage Panel Rating (A) Type Rated Frequency (Hz)
Fault Level (kA)
Maximum Symmetrical
SL.No Quanity( Nos) Mounting Panel access Form Nominal Voltage Panel kVAR rating Type Rated Frequency (Hz)
Fault Level (kA)
1 16 Floor (free standing) Front + Rear Form 2B, type 2 400-230V 400 50kA for 1 sec Indoor type 60
Maximum Symmetrical
SL.No Quanity( Nos) Mounting Panel access Form Nominal Voltage Panel rating (A) Type Rated Frequency (Hz)
Fault Level (kA)
1 16 Floor (free standing) Front Form 2B, type 2 400-230V 400A 25kA for 1 sec Indoor type 60
L01 Project
FIRE FIGHTING PUMPS SCHEDULE
HORIZONTAL SPLIT-CASE
FIRE FIGHTING PUMP
1 FFEP-01 L01-OFFICE BUILDING CENTRIFUGAL ELECTRICAL DUTY 1,500 13 220.0 STAR/DELTA 400/3/60 UL/FM APPROVED PUMP AND CONTROL PANEL
ROOM AT BASEMENT
DRIVEN PUMP
NOTE
THE FINAL HEAD PUMP SHALL BE CONFIRMED DURING THE SHOP DRAWING STAGE.
THE PUMP SUPPLIER HAS TO SUBMIT DETAILED PUMP SELECTION DATASHEETS WITH PUMP CHARACTERISTIC CURVES THAT WILL DEMONSTRATE NFPA REQUIREMENT SUCH AS: AT 150% OF RATED CAPACITY, HEAD WILL RANGE FROM A MINIMUM OF 65% TO A MAXIMUM OF
JUST BELOW OF THE RATED HEAD, ACCORDING TO NFPA 20 / SECTION A.6.2.
L01 Project
WATER SUPPLY PUMPS
NOTES:
1. CONTRACTOR TO PERFORM PUMP HEAD CALCULATION TO ESTIMATE THE ACTUAL HEAD LOSS AND OBTAIN APPROVAL FROM CONSULTANT PRIOR TO ORDERING THE PUMPS.