You are on page 1of 4

Attachment 1 (ZTE)

Referring to Article 3 stipulated in the Warehouse Operation Agreement between PT.


Abadi Metro Global Selaras and PT. Sinotrans CSC Indonesia, covering warehouse
space and warehouse operation services with detail as follows:

1. Location : Sorong, Papua

2. Address : Jalan Sungai Remu KM 8, Kel. Malaingkedi,


Kec. Sorong Utara, Sorong, Papua Barat

3. Space : 720 M2

4. Period : 01 August 2020 – 31 July 2021 (2nd year)

5. Rate : IDR 75,000/M2


(include storage and handling in/out)

6. Overtime : IDR 30,000/manhour (weekday)


IDR 50,000/manhour (weekend)

7. Repacking >7CBM : IDR 500,000 (Wooden Packing)


IDR 250,000 (Carton Packing)
IDR 100,000 (Sack Packing)

The above-mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 2 (ZTE)
Referring to Article 3 stipulated in the Warehouse Operation Agreement between PT.
Abadi Metro Global Selaras and PT. Sinotrans CSC Indonesia, covering warehouse
space and warehouse operation services with detail as follows:

1. Location : Balikpapan, Kalimantan Timur

2. Address : Jl. AMD Projakal No.27, Batu Ampar, Kec. Balikpapan


Utara, Kota Balikpapan, Kalimantan Timur 76127
(gudang grace no.5)

3. Space : 500 M2

4. Period : 01 March 2020 – 28 February 2021 (1 st year)

5. Rate : IDR 85,000/M2


(include storage and handling in/out)

6. Overtime : IDR 40,000/manhour (weekday)


IDR 50,000/manhour (weekend)

7. Repacking >7CBM : IDR 500,000 (Wooden Packing)


IDR 250,000 (Carton Packing)
IDR 100,000 (Sack Packing)

8. Battery Recharging : IDR 17,500 per group of 4 batteries

The above mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 3 (ZTE)
Referring to Article 3, stipulated in the Warehouse Operation Agreement between PT.
Abadi Metro Global selaras and PT. Sinotrans CSC Indonesia, covering warehouse
operation services only with detail as follows:

1. Location : Denpasar, Bali

2. Address : Jl. Gatot Subroto Barat No. 903,


Kecamatan Padangsambian Kaja,
Denpasar, Bali

3. Space : 720 M2

4. Period : 01 August 2020 – 31 Jul 2021 (1st year)

5. Rate : IDR 38,500/M2


(Operation only exclude storage)

6. Overtime : IDR 30,000/manhour (weekday)


IDR 40,000/manhour (weekend)

7. Repacking >7CBM : IDR 500,000 (Wooden Packing)


IDR 250,000 (Carton Packing)
IDR 100,000 (Sack Packing)

The above mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu


Attachment 4 (ZTE)
Referring to Article 3 stipulated in the Warehouse Operation Agreement between PT.
Abadi Metro Global selaras and PT. Sinotrans CSC Indonesia, covering warehouse
operation service only with detail as follows:
1. Location : Semarang, Jawa Tengah
2. Address : a) Kawasan Industri Candi Blok 5/28,
Kec. Ngaliyan, Semarang
b) Kawasan Industri Candi Blok 5/18,
Kec. Ngaliyan, Semarang

3. Space : a) 1700 M2
b) 1120 M2

4. Period : 01 Dec 2020 – 30 Nov 2021 (1st year)

5. Rate : IDR 42,000/M2


(Operation only exclude storage)

6. Overtime : IDR 30,000/manhour (weekday)


IDR 40,000/manhour (weekend)

7. Repacking >7CBM : IDR 500,000 (Wooden Packing)


IDR 250,000 (Carton Packing)
IDR 100,000 (Sack Packing)
The above mentioned rate exclude tax

Executed in duplicate,
PT. Sinotrans CSC Indonesia PT. Abadi Metro Global Selaras

Li Zhenghong Nova Grace Sutrahitu

You might also like