Professional Documents
Culture Documents
resources
WHO DECIDES...???
- Even nature has limitations to support human life -
Hadi Sarono_Decentralization of municipal waste management_case study in Cisarua, Puncak, Bogor 1
Private Waste Companies & Organization in Indonesia
>70 % of
Low
Valuable
??? Waste
In 1994, John Elkington came up with a simple phrase to Low Quality of recyle
revolutionise the way companies track their success: Triple
Bottom Line. Now, almost 25 years later, the creator of the waste.!!!
term has said it’s time to recall the TBL and start thinking
differently.
Copyright text 2020 by Conscious Creatives
Waste Total 65.200.000 100,0% 42.488.000 69,0% 6.477.440 9,9% 16.234.560 24,9%
Organics 39.120.000 60,0% 26.992.800 69% 652.000 1,0% 11.475.200 18%
Plastics 9.128.000 14,0% 6.298.320 69% 900.000 1,4% 1.929.680 3,0%
Paper 5.868.000 9,0% 1.548.920 69% 2.500.000 3,8% 1.819.080 2,8% Recycle rates: 10%
metals 2.608.000 4,0% 1.799.520 69% 808.480 1,2% - 0,0%
SUPPLY
Rubber & glass 5.216.000 8,0% 3.599.040 69% 1.616.960 2,5% - 0,0%
DOMESTIC PAPER
Others 3.260.000 5,0% 2.249.400 69% - 0% 1.010.600 1,6%
RECYCLE RAW
MATERIAL
COLECTING
HAULING
COST...!!!
Keys activities:
1. Reduce waste from the sources
2. Sorting and separate cycyle waste rom disposal.
3. Minimize volume
4. Minimize transport distance
As Tourist
Dozen or hundred Headwaters of
Highway to Landfills Destination, has
Tons of solid waste Ciliwung River
(TPA NAMBO), about dozen of villages,
Destination of 7-8 every day
35 Km from here and hotels, and
million tourist Tipping Fee $8 to lodges
every year $30/ton (when RDF
facility start to
>150K tourist operate)
every weekend
GEDE-PANGRANGO
Where & Why?...CISARUA district, BOGOR, MOUNT NATIONAL PARK
Biogas Facility
Recycling
facility
Tourist
Population (n)
Density
SUB-DISTRICT
Area Villas, Hotels daily solid
(Km2) waste
Hotels
Village Stall Mini Attracti (tons)
Others % to (F)
Market Kiosk market ons
CITEKO 13.241 3.212 4,6 2.872 1 181 1 100 8,8% 9.136 Anaerob Digesting,
Compressed Biogas, Hot
CIBEREUM 17.067 5.147 11,3 1.512 1 253 3 80 6,5% 1 11.776 water facility
TUGU SELATAN 18.707 5.076 17,1 1.093 536 3 75 12,1% 3 12.908
TUGU UTARA 10.887 3.322 17,0 640 241 7,3% 2 7.512
BATU LAYANG 9.874 2.492 2,3 4.369 103 8 4,5% 1 6.813
CISARUA 9.364 2.845 2,0 4.682 1 308 3 15 11,5% 6.461
KOPO 21.154 6.065 4,5 4.670 230 3 12 4,0% 14.596
LEUWIMALANG 6.571 2.760 1,5 4.295 270 3 8 10,2% 1 4.534
JOGJOGAN 8.394 1.936 4,5 1.849 19 1,0% 1 5.792
CILEMBER 9.466 2.460 2,0 4.733 29 2 1,3% 2 6.532 Involving >500
workers
CISARUA DISTRICT 124.725 35.315 66,9 1.864 3 2.170 18 298 7,0% 11 30 86.060
poverty data (family)
in cisarua sub-district
BUMDes_Cisarua
corporates investment
authority area
equity and Cisarua Village-owned
investment business entity (BUMDes)
Disposal Cost
O&M: Cisarua Solid Waste
Management & Energy
Company (CSWE)
EDUCATION TOUR Local IT management Colecting &
Consultant Sorting Point
Biogas
Thermal oil Facility
heater Boiler
Hot water Waste
Management Waste
From other
collector
recycle waste
Rpet/papers/
steel/others
Hotel
Local potential
Artificial Hot Water Market
Pool, spa CUSTOMER AREA Cooking
Higher Level of
Market
Hadi Sarono_Decentralization of municipal waste management_case study in Cisarua, Puncak, Bogor 8
NUMBER OF
VOLUME (M3) DUMP TRUCT
CLASIFICATION
ORGANIC (Ton)
DISPOSAL (Ton)
RECYCLE (Ton)
BASE ON (6M3) Source:
RATE (%)
100 Ton The Preparatory Survey on the Project for West Java Regional Solid Waste
water content
water content
reduce (60%)
Compacted
Compacted
COMPOSITIONS of SOLID
Volume &
Volume &
Treatment and Final Disposal, Final Report, JAPAN INTERNATIONAL
reduce
WASTE
Non
Non
COOPERATION AGENCY, 2012.
(Ton)
Kecamatan Cisarua dalam Angka 2019_BPS kabupaten Cisarua
Organics Organic + leaves/garde 51,7% 51,7 51,7 172,2 34,4 28,7 5,7
Residues (supposed to be organic) 8,7% 8,7 8,7 29,0 5,8 4,8 1,0
Plastic Recyclable plastic 12,3% 12,3 12,3 41,0 16,4 6,8 2,7
Non recyclable plastic over 50mm 4,5% 4,5 4,5 14,8 5,9 2,5 1,0
Paper Paper 9,8% 9,8 9,8 32,7 13,1 5,4 2,2
Harvesting
Agriculture and Livestock
Area (Ha)
Qty Qty
(tons)
Metal Metal 0,3% 0,3 0,3 0,9 0,9 0,2 0,2 (Kecamatan Cisarua dalam Angka
Hazardous Wastes Hazardous Wastes 0,1% 0,1 0,1 0,3 0,1 0,1 0,0 2019_BPS kabupaten Cisarua) (pcs) (Litres)
Others Mineral 1,2% 1,2 1,2 4,0 1,6 0,7 0,3
Textile 3,8% 3,8 3,8 12,7 5,1 2,1 0,8Rice & secondary crops 2.043
Rubber 0,5% 0,5 0,5 1,7 0,7 0,3 0,1Fruits 113
Disposal Nappies 6,6% 6,6 6,6 22,0 8,8 3,7 1,5Vegetables 2.087 2.258
Composites 0,0% - - - - - -Biopharmaca 16 4
Others 0,6% 0,6 0,6 2,1 0,8 0,3 0,1Decorative plants 170 310
TOTAL 100,0 60,4 22,9 16,8 333,3 93,6 55,6 15,6beef cattle, dairy cows, sheep, goats, 7.026
horses, buffalo, rabbits
Poultry 27.370
Solid Municipal
Livestock meat production 1.660
Egg production 23
Goverment Fee,
Sorting & Collecting $15/ton (vs
Point tipping fee
$30/ton to
Centre WTE
Solid Waste
plant) of or
Management Fee
$1200 daily
Solid waste
COMPOST Management Tourist
Destination Hotel Direct
Management
One of Recycling Fee, $50-$200
compensation fee INTEGRATED material from per location
Cisarua Village-owned to community SOLID MUNICIPAL others Area monthly or
business entity WASTE FACILITY
arround $300
(BUMDes)_20% Equity (ISMWF)
daily
100 TpH ISMWF, 60TpD
Anaerob Divester, Hot Recycle Waste
Water plant, Working Direct selling,
0,5 TpD PET Recycling facility, Working Capital $100 daily
Cap. and O&M ($30/ton):
and O&M Cost: $475/ton or $877.800 annually
$1.080.000
GLOBAL FUND & CSR
for ISMWF_80% Loan
7 TpH_2 shift,
annually): $4.752.000
Investment ($220/ton
$700/ton or
ANAEROB $4900 daily
DIGESTING PET recycling facility (Hot Hot Washed rPET
PLANT Washed)_0,5 TpH_Target
market: plastic sheet
packaging, Fiber
3000 M3/day, or
O&M: Cisarua Solid $500 daily,
Waste Management & selling to
Energy Company (CSWE) Cisarua Hot water pool & Spa, Capital Kiosk/Stall/other
and O&M cost: $330.000 annually Compressed small shops &
HOT Biogas poor family at
WATER Cisarua resident
PLANT
400 tourits x $8
Capital Investment: $200.000 or $ 3200 daily
(PET reycling) + $600.000
(Artificial Hot Water) = $800.000 Income from
tourists
PRIVATE
INVESTOR (PET Expected Income daily
Recycle plant & $ 9.600 or $ 3.300.000
Artificial Hot annually
water)_80% Equity