You are on page 1of 7
[DOCUMENT NO - 20-200r8/ScH/RA a Ta ap 2H ,eoLa¢/ a1 io \o3\04 at a2 93 a4 a2 c2! @rLas ai iae loa — Eee SUBMISSION OF SCHEMATIC VIEWS & GA OF COOLING TOWER [APPROVAL OF OR COMMENT ON SCHEMATICVIEWS & GK OF COOLING ape WRETAT /Manoj Sardana ie manner (are —uftirea) ‘Addl. General Manages (Thermal-Design) DOCUMENTNO -20-210019/SCH/RA JALOF OR COMMENT ON FP DESIGN OF SUPERSTRUCTURE [APPROVAL OF OR COMMENT ON RCDETAILS OF COOLING TOWER ‘COW MN a WALL SSUBNASSION OF RC DETAILS OF BASIN SLAB INCLUDING BEAM [APPROVAL OF OR COMMENT ON RC DETAILS OF EASIN SLAB INCLUDING ea ‘SUBMISSION OF RC DETALS OF PLASTER [APPROVAL OF OR COMMENT ON RC DETAILS FO PIPESUPPORT & rides ENCASING SUBMISSION OF Rc DETALS OF SLUDGE PIT & STAIRCASE day APPROVAL OF OR COMMENT ON RC DETAILS OF SLUDGE PI STAIRCASE 21 days ‘FOR COMMENT ON GAOF SWITCHGEAR BLILOING (OF SUBSTRUCTURE DRAWINGS OF SWITCHGEAR SUOING 7 days y\ a2 a at cz)as aa! Se ge AEO cone iu Losey OC ga nt a Oa DOCUMENT NO - 20-210019/SCH/RE {2 SCHEDULE FOR 2x6SOMW KHIURJA SUPER THERMAL POWER PROJECT. Buntn Sa a ee Searene | eoeesies |e Peers La S| MECHANICAL DRAWING & DOCUMENTS Geddays 190621 O4zat | ‘SUBMISSION OF HW MANIFOLD DRAWING day 19-0521 39.0621 3 | [APPROVAL OF OR COMMENT ON HW MANIFOLD DRAWING 2idays 20-05-21 1007-21 | | ‘SUBMISSION OF GA AND TDS FOR BF VALVE dy 030321 90921 s 2doys 100321 30-0921 a Léa 19-08-21 19-08-21 APPROVAL OF OR CONIMENT ON GA AND TDS FOR GATE VALVE days 200821 coma) SUBMISSION OF TDS FOR FRP Adey 0722 207-2 [APPROVALOF OR COMMENT ON TOS FOR FRP 2idays 230721 120821 | ‘SUBMISSION OF GA AND TOS FOR SUDE GATE day 04-0823 04-08-21 [APPROVALOF OR COMMENT ON GA AND TDS FOR SLIDE GATE days 050021 25.0921 “SUBMISSION OF GA AND TOS FOR FAN ASSEMBLY day 27-0521 77-0621 "APPROVAL OF OR COMMENT ON GA AND TDS FOR FAN ASSEMBLY 2daye 28-0621 1807-21 SUBMISSION OF GA FOR EXPANSION BELLOW day 19-0621 39.0521 | APPROVAL OF OR COMMENT ON GA FOR EXPANSION BELLOW aa days 20.0521 1007.21 “SUBMISSION OF GA OF SUBMERSIBLE PUMP Lday 20-07-21 200721 APPROVAL OF OR COMMENT ON GA OF SUBMERSIBLE PUMP. 2 days 21-0721 100821 BALANCE MECHANICAL DRAWING y30days 2-07-21 081221 ELECTRICAL & INSTRUMENTATION DRAWING & DOCUMENTS. wUséays 130621 144221 SUBMISSION OF ELECTRICAL LOAD UST day 13-0621 13-06-21 PPR ‘OR COMMENT ON ELECTRICAL LOAD UST eye 40521 040721 SUBMISSION OF CONTROL & OPERATION PHILOSOPHY Aday 03-07-21 03-07-24 appre ‘ORCOMMENTON CONTROL & OPERATION PHILOSOPHY — 21.days 04-07-21 24-07 ‘SUBMISSION OF INSTRUMENT INPUT / OUTPUT UST UST FOR CT dey 03-0721 03-07-21 /APPROVALOF OR COMMENT ON INSTRUMENTINPUT / OUTPUT UST UST 2idays 040723, 2407-21 ‘SUBMISSION OF DS FOR POWER CABLE day 240322 21-0921 APPROVAL OF OR COMMENT ON DS FOR POWER: ‘dys 20921 124021 | 'SUBRAISSION OF DS FOR CONTROL/INSTRUMENT CAC day 180821 19.08.21 -APPROVALOF OR COMMENT ON DSFOR CONTROY/INSTRUMENT CABLE 22 days 200921 100-21 ‘SUBMISSION OF DS FOR FRP CABLE TRAY day 34-0921 14-09-21 | APPROVAL OF OR COMMENT ON DS FOR FAP CABLE TRAY 2idsys 15-0921 051021 "35 __SUBMISSION OF INSTRUMENT CABLE SCHEDULE & 8 SCHEDULE Lewy 23-0721 2307-21 lL y yr Oe Es ae el Sat DOCUMENT NO = 20-20018/5CH/R ‘ORDERING ‘ouGHT our mes STEEL PLATES FOR HW PPES/ HW PIPES FRP STRUCTURES Drier euntnaToR BALANCE IN HOUSE TEMS ousHT our rrems. FRP STRUCTURES Fam assemnuy , a Me Be aks tit SEY oe nT no eee parolee eat (re Spa" Bret Sia Me DOCUMENT NO -20.20019/SCH/RA ‘CONSTRUCTION & ERECTION CTH SWITCH GEAR BULDING BALANCE ovat WORK PREPERATORY & ASSEMBLING OF FP ITEMS YON UPTO FANCYLNDER [MECHANICAL ERECTION ABOVE FANDECK [BRCKFILUNG FOR BASIN SHUTTERING SUPPORT tno pera ae HN en passer Masa fares, a A IM al } 380221 DOCUMENT NO - 20-210015/SCH/RA jo Jaton she at ian as

You might also like