[DOCUMENT NO - 20-200r8/ScH/RA
a Ta ap 2H
,eoLa¢/ a1 io \o3\04 at a2 93 a4 a2 c2! @rLas ai iae loa
— Eee
SUBMISSION OF SCHEMATIC VIEWS & GA OF COOLING TOWER
[APPROVAL OF OR COMMENT ON SCHEMATICVIEWS & GK OF COOLING
ape WRETAT /Manoj Sardana
ie manner (are —uftirea)
‘Addl. General Manages (Thermal-Design)DOCUMENTNO -20-210019/SCH/RA
JALOF OR COMMENT ON FP DESIGN OF SUPERSTRUCTURE
[APPROVAL OF OR COMMENT ON RCDETAILS OF COOLING TOWER
‘COW MN a WALL
SSUBNASSION OF RC DETAILS OF BASIN SLAB INCLUDING BEAM
[APPROVAL OF OR COMMENT ON RC DETAILS OF EASIN SLAB INCLUDING
ea
‘SUBMISSION OF RC DETALS OF PLASTER
[APPROVAL OF OR COMMENT ON RC DETAILS FO PIPESUPPORT & rides
ENCASING
SUBMISSION OF Rc DETALS OF SLUDGE PIT & STAIRCASE day
APPROVAL OF OR COMMENT ON RC DETAILS OF SLUDGE PI STAIRCASE 21 days
‘FOR COMMENT ON GAOF SWITCHGEAR BLILOING
(OF SUBSTRUCTURE DRAWINGS OF SWITCHGEAR SUOING 7 days
y\ a2 a at cz)as aa!
Se ge AEO
cone iu
Losey
OC ga nt
a OaDOCUMENT NO - 20-210019/SCH/RE
{2 SCHEDULE FOR 2x6SOMW KHIURJA SUPER THERMAL POWER PROJECT.
Buntn Sa
a ee Searene | eoeesies |e Peers La
S| MECHANICAL DRAWING & DOCUMENTS Geddays 190621 O4zat
| ‘SUBMISSION OF HW MANIFOLD DRAWING day 19-0521 39.0621
3 | [APPROVAL OF OR COMMENT ON HW MANIFOLD DRAWING 2idays 20-05-21 1007-21 |
| ‘SUBMISSION OF GA AND TDS FOR BF VALVE dy 030321 90921
s 2doys 100321 30-0921
a Léa 19-08-21 19-08-21
APPROVAL OF OR CONIMENT ON GA AND TDS FOR GATE VALVE days 200821 coma)
SUBMISSION OF TDS FOR FRP Adey 0722 207-2
[APPROVALOF OR COMMENT ON TOS FOR FRP 2idays 230721 120821 |
‘SUBMISSION OF GA AND TOS FOR SUDE GATE day 04-0823 04-08-21
[APPROVALOF OR COMMENT ON GA AND TDS FOR SLIDE GATE days 050021 25.0921
“SUBMISSION OF GA AND TOS FOR FAN ASSEMBLY day 27-0521 77-0621
"APPROVAL OF OR COMMENT ON GA AND TDS FOR FAN ASSEMBLY 2daye 28-0621 1807-21
SUBMISSION OF GA FOR EXPANSION BELLOW day 19-0621 39.0521 |
APPROVAL OF OR COMMENT ON GA FOR EXPANSION BELLOW aa days 20.0521 1007.21
“SUBMISSION OF GA OF SUBMERSIBLE PUMP Lday 20-07-21 200721
APPROVAL OF OR COMMENT ON GA OF SUBMERSIBLE PUMP. 2 days 21-0721 100821
BALANCE MECHANICAL DRAWING y30days 2-07-21 081221
ELECTRICAL & INSTRUMENTATION DRAWING & DOCUMENTS. wUséays 130621 144221
SUBMISSION OF ELECTRICAL LOAD UST day 13-0621 13-06-21
PPR ‘OR COMMENT ON ELECTRICAL LOAD UST eye 40521 040721
SUBMISSION OF CONTROL & OPERATION PHILOSOPHY Aday 03-07-21 03-07-24
appre ‘ORCOMMENTON CONTROL & OPERATION PHILOSOPHY — 21.days 04-07-21 24-07
‘SUBMISSION OF INSTRUMENT INPUT / OUTPUT UST UST FOR CT dey 03-0721 03-07-21
/APPROVALOF OR COMMENT ON INSTRUMENTINPUT / OUTPUT UST UST 2idays 040723, 2407-21
‘SUBMISSION OF DS FOR POWER CABLE day 240322 21-0921
APPROVAL OF OR COMMENT ON DS FOR POWER: ‘dys 20921 124021 |
'SUBRAISSION OF DS FOR CONTROL/INSTRUMENT CAC day 180821 19.08.21
-APPROVALOF OR COMMENT ON DSFOR CONTROY/INSTRUMENT CABLE 22 days 200921 100-21
‘SUBMISSION OF DS FOR FRP CABLE TRAY day 34-0921 14-09-21 |
APPROVAL OF OR COMMENT ON DS FOR FAP CABLE TRAY 2idsys 15-0921 051021
"35 __SUBMISSION OF INSTRUMENT CABLE SCHEDULE & 8 SCHEDULE Lewy 23-0721 2307-21 lL
y
yr Oe
Es
ae el
SatDOCUMENT NO = 20-20018/5CH/R
‘ORDERING
‘ouGHT our mes
STEEL PLATES FOR HW PPES/ HW PIPES
FRP STRUCTURES
Drier euntnaToR
BALANCE IN HOUSE TEMS
ousHT our rrems.
FRP STRUCTURES
Fam assemnuy
, a
Me Be aks tit SEY oe nT
no eee parolee eat (re
Spa" Bret Sia MeDOCUMENT NO -20.20019/SCH/RA
‘CONSTRUCTION & ERECTION CTH
SWITCH GEAR BULDING
BALANCE ovat WORK
PREPERATORY & ASSEMBLING OF FP ITEMS
YON UPTO FANCYLNDER
[MECHANICAL ERECTION ABOVE FANDECK
[BRCKFILUNG FOR BASIN SHUTTERING SUPPORT
tno pera ae HN en
passer Masa fares,
a A IM al}
380221
DOCUMENT NO - 20-210015/SCH/RA
jo Jaton she at ian as