S. NO. Activity UOM Scope Completed BALANCE START DATE FINISH DATE
1 UNIT -1 175
2 UNIT -2 182
TOTAL 357
BA Slurry (Inside)
Completed START DATE FINISH DATE
S. No. UOM Scope Balance
Activity
1 ST-1 Nos 34 13 21
2 ST-2 Nos 53 9 44
3 ST-3 Nos 122 40 82
4 ST-4 Nos 96 64 32
5 ST-5 Nos 126 - 126
6 ST-6 Nos 25 - 25
7 ST-7 Nos 54 - 54
SIZE NO SIZE
PC1 375 30 PC1 375
TRENCH 4 PC4 375 30 TRENCH 5 PC4 375
PC5 375 30 PC5 375
TOTAL 90 TOTAL
SIZE NO SIZE
PC1 375 32 PC6 375
TRENCH 7 PC2 375 32 TRENCH 8
PC3 375 32
TOTAL 96 TOTAL
SIZE NO SIZE
PC7 400 10 PC7 400
TRENCH 10 TRENCH 11
TOTAL
TOTAL 10
SIZE NO
PC8 400 30
TRENCH 13 PC9 400 30
TOTAL 60
NO SIZE NO
26 PC1 375 30
26 TRENCH 3 PC2 375 30 TRENCH1
26 PC3 375 30 TRENCH2
78 TOTAL 90 TRENCH3
TRENCH4
TRENCH5
TRENCH6
TRENCH7
NO SIZE NO TRENCH8
35 PC1 375 30 TRENCH9
41 TRENCH 6 PC2 375 30 TRENCH10
38 PC3 375 30 TRENCH11
114 TOTAL 90 TRENCH12
TRENCH13
TOTAL
NO SIZE NO
30 PC6 375 30
TRENCH 9
30 TOTAL 30
NO SIZE NO
30 PC8 400 30
TRENCH 12 PC9 400 30
30
TOTAL 60
NO OF PRECASTE COVER
90
78
90
90
114
90
96
30
30
10
30
60
60
868
NO OF
AREA COMPLETED BALANCE
SLEEPERS
UNIT1 175 0 175
BA Slurry (Inside - Boiler to ASPH) UNIT2 182 0 182
BA Slurry (Inside- ASPH to Boundary
) 510 126 384
BA Slurry (OUTSIDE- Ashdyke) 2187 64 2123
Total 3054 190 2864
NO OF PRECAST
COMPLETED BALANCE
COVER START DATFINISH DATE
708 6 702
160 0 160
868 6 862