3Ph 4 WIRE LT CT & 3Ph 3/4 WIRE HT CT/PT OPERATED FULLY STATIC

AMR COMPATIBLE TRI-VECTOR ENERGY METERS

DLMS COMPLIANT – CATEGORY ‘C1’

FOR

1) 240 V, LT CT OPERATED METER (3Ph 4 Wire)

2) 11KV BULK CONSUMER METER (3Ph 3 Wire)

3) 33 KV BULK CONSUMER METER (3Ph 4 Wire)

WBSEDCL
TECHNICAL SPECIFCATION FOR 3PHASE 4 WIRE LT CT, 3PHASE 3 WIRE CT/PT & 3PHASE 4
WIRE CT/PT OPERATED FULLY STATIC AMR COMPATIBLE TRI-VECTOR ENERGY METERS FOR
BULK CONSUMER
1.0 SCOPE
Design, manufacturing, testing, supply and delivery of

1. AC, 3 Phase, 4 Wire, CT/PT operated fully Static and AMR compatible Tri-Vector Energy
Meters
2. AC, 3 Phase, 3 Wire, CT/PT operated fully Static and AMR compatible Tri-Vector Energy
Meters
3. AC, 3 Phase,4wire LT CT operated fully Static and AMR compatible Tri-Vector Energy
Meters
for measurement of different electrical parameters listed elsewhere in the document
including
1. Active Energy
a. kWh for LT meters
b. MWh for 11 kV & 33 kV meters
2. Reactive Energy (kVArh/ MVArh),
a. kVArh for LT meters
b. MVArh for 11 kV & 33 kV meters
3. Apparent Energy etc.
a. kVAh for LT meters
b. MVAh for 11 kV & 33 kV meters

2.0 APPLICATION
CONSUMER METER – Category “C1” for only DLMS meters

3.0 STANDARDS TO WHICH METERS SHALL COMPLY


IS-14697:1999(2004) Specification for AC Static Transformer operated Watt Hour & VAR-Hour
meters (class 0.5S);

IS-15959:2011 Data Exchange for Electricity Meter Reading Tariff & Load Control – Companion
Specification

CBIP - 325 Manual on Standardization of AC Static Electrical Energy Meter

IEC 62052-11 Electricity metering equipment (AC) –General requirements, tests and test
conditions -Part 11: Metering equipment;

IEC 62053-22 Electricity metering equipment (AC) –Particular requirements - Part-22: Static
Meters for Active Energy (Class 0.5S);

IEC 62053-23 Electricity metering equipment (AC) –Particular requirements - Part-23: Static
Meters for Reactive Energy;

IS 15707 Specification for Testing, evaluation, installation & maintenance of AC Electricity Meters-
Code of Practice.

WBSEDCL
Page 2
Guidelines on “Data Exchange for Electricity Meter Reading, Tariff and Load Control – Companion
Specification”

IEC 62056-21 Electricity metering: Data exchange for meter reading, tariff and load control- Part
21: Direct local data exchange

IEC 62056-31 Electricity metering: Data exchange for meter reading, tariff and load control -Part
31: Local Area Network data exchange

IEC 62056-61 Electricity metering: Data exchange for meter reading, tariff and load control- Part
61: Object identification system (OBIS)

The equipment meeting with the requirements of other authoritative standards, which ensure
equal or better quality than the standard mentioned above, also shall be considered; in case of
conflict the Guidelines on “Data Exchange for Electricity Meter Reading, Tariff and Load Control –
Companion Specification” enclosed with this document as annexure shall prevail upon.

4.0 GENERAL TECHNICAL REQUIREMENTS


1 TYPE AMR Compatible Static, Tri-Vector Energy Meter for Bulk
Consumers .
i) 3Ph,3Wire 11kV ,50/5A CT/PT operated Tri-vector meter
ii) 3Ph,4Wire 33V, 100/1A CT/PT operated Tri-vector Meter
iii)3Ph,4Wire 240V , 200/5A,(LTCT) Tri-Vector Energy Meter
2 FREQUENCY 50 Hz ± 5%
3 ACCURACY CLASS 0.5S
4 VOLTAGE Suitable for operation from
RATING i) 11kV /110 V (3P, 3W)
PT secondary 110V ph-ph: 63.5 V ph-N
ii) 33/√3kV /110/√3 V (3P, 4W)
PT secondary 110 V ph-ph: 63.5 V ph-N
iii) 240V Ph-N, 240 V LT CT (3P, 4W)
VOLTAGE
VARIATION (-) 30% to (+) 20%

5 BASIC CURRENT i) Ib- 5A, Ratio : 50/5 A) for 11 kV CT (3P-3W)


(Ib) & CURRENT
ii) Ib - 1A, Ratio : 100/1 A) for 33 kV CT (3P, 4W
RATING
iii) Ib - 5A, Ratio : 200/5 A for LT CT(3P, 4W )
6 MAXIMUM
CONTINUOUS As per IS 14697:1999(2004)
CURRENT
STARTING
0.1% of Ib at UPF
CURRENT
7 POWER The active and apparent power consumption, in each voltage
CONSUMPTION circuit, at reference voltage, reference temperature and
reference frequency shall not exceed 1. 5 W and 8 VA.
The apparent power taken by each current circuit, at basic
current, reference frequency and reference temperature shall
not exceed 1.0 VA.
8 POWER FACTOR 0 Lag – Unity – 0 Lead

WBSEDCL
Page 3
9 DESIGN Meter shall be designed with application specific integrated
circuit (ASIC) or micro controller; shall have no moving part;
electronic components shall be assembled on printed circuit
board using surface mounting technology; factory calibration
using high accuracy (0.05 class) software based test bench.
Assembly of electronic components shall be as per ANSI /IPC-A-
610 standard.
10 DLMS TEST Manufacturer must have test certificate for conformance to
CERTIFICATE DLMS from CPRI of Category – C1.
i) 3Ph,3Wire 11kV ,50/5A CT/PT operated meter –
DLMS Test Certificate not applicable
ii) 3Ph,4Wire 33 kV, 100/1A CT/PT operated Tri-vector Meter
DLMS Test Certificate mandatory for manufacturer
iii)3Ph,4Wire 240V , 200/1A,(LTCT) Tri-Vector Energy Meter
DLMS Test Certificate mandatory for manufacturer
5.0 TEMPARATURE RISE:
Under normal condition of use, winding and insulation shall not reach a temperature, which might
adversely affect the operation of the meters. IS14697:1999(2004) should be followed.

6.0 CLIMATIC CONDITIONS:


Temperature : -10 C to 55 C (in shade)

Humidity : up to 95% RH non-condensing

Average annual rainfall : 150 cm.

Max Wind Pressure : 150 kg/sq.m.

Max. altitude above MSL : 3000 m.

7.0 TROPICAL TREATMENT:


The meters shall be suitably designed and treated for normal life and satisfactory operation under
hot & hazardous tropical climate conditions and shall be dust and vermin proof. All the parts &
surface, which are subject to corrosion, shall either be made of such material or shall be provided
with such protective finish which provides suitable protection to them from any injurious effect of
excessive humidity.

8.0 CONSTRUCTIONAL REQUIREMENT/ METER COVER &


SEALING ARRANGEMENT
Wherever poly carbonate cover is specified, it shall conform to IS 11731 (FH-1category) besides
meeting the test requirement of heat deflection test as per ISO 75, glow wire test as per the
IS:11000 (part 2/SEC-1) 1984 OR IEC PUB,60695-2-12, Ball pressure test as per IEC--60695-10-
2 and Flammability Test As per UL 94 or As per IS 11731(Part-2) 1986.

9.0 CONSTRUCTION
WBSEDCL
Page 4
The case, winding, voltage circuit, sealing arrangements, registers, terminal block, terminal cover
& name plate etc. shall be in accordance with the relevant standards. The meter should be
compact & reliable in design, easy to transport & immune to vibration & shock involved in the
transportation & handling. The construction of the meter should ensure consistence performance
under all conditions especially during heavy rains / very hot weathers. The insulating materials
used in the meter should be non-hygroscopic, non-ageing & have tested quality.

The meter should comply latest technology such as Microcontroller or Application Specific
Integrated Circuit (ASIC) to ensure reliable performance. The mounting of the components on
the PCB should compulsorily be Surface Mounted Technology (SMT) type. Power supply
component may be of PTH type. The electronic components used in the meter should be of high
quality and there should be no drift in the accuracy of the meter for at least ten years. The
circuitry of the meter should be compatible with 16 Bit (or better) ASIC with compatible
processor and meter should be based on Digital measuring and sampling technique.

The meter should be housed in a safe, high grade, unbreakable, fire resistant, UV stabilized, virgin
Polycarbonate/ High grade Engineering plastic/Thermosetting Plastic casing of projection
mounting type. The meter cover should be transparent, for easy reading of displayed
parameters, and observation of operation indicators. The meter base may or may not be
transparent, but it should not be black in colour. The meter casing should not change shape,
size, and dimensions when subjected to 200 hrs on UV test as per ASTMD 53. It should withstand
650 deg. C. glow wire test and heat deflection test as per ISO 75.

Meters must be supplied with 2 (two) nos. manufacturers’ seals between meter base and
meter cover at both the sides.

Both the communication port (Optical and RS232 port) should have proper sealing arrangement.

The bidder shall submit relevant documents regarding the procurement of polycarbonate
material. The polycarbonate material of only the following manufacturers shall be used.

a) G.E. Plastics/Sabic: LEXAN 943A or LEXAN 143 or equivalent for Meter &
Terminal cover, and LEXAN 503R or 500R or equivalent for
base
b) BAYER/SABIC : Grade corresponding to above
c) DOW Chemicals : -Do-
d) MITSUBISHI : -Do-
e) TEJIN : -Do-
f) DUPONT : -Do-

10.0 METER CASE AND COVER


The meter should be sealed in such a way that the internal parts of the meter becomes
inaccessible and attempts to open the meter shall result in viable damage to the meter cover. This
is to be achieved by use of Ultrasonic Welding (Ultrasonically continuously welded at three sides
so that the cover cannot be separated from the base without breaking/damaging the case and
cover) i.e. break to open type. In case, ultrasonic welding using plate/strip is used the material of
plate/strip should be same as that of cover and base and the strip should flush with meter body.
The manufacturer’s logo should be embossed on the strip / plate.

WBSEDCL
Page 5
The meter cover should be fixed to the meter base (case) with Unidirectional Screws, so that the
same cannot be opened by use of screwdrivers. The meter shall withstand external magnetic
influence as per latest amendments of CBIP Technical Report No. 325.

11.0 TERMINAL BLOCK AND COVER:


The terminals may be grouped in a terminal block having adequate insulating properties and
mechanical strength. The terminal block should be made from best quality non-hygroscopic,
flame retardant material (capable of passing the flammability tests) with nickel plated brass
inserts / alloy inserts for connecting terminals.

The terminals in the terminal block shall be of adequate length in order to have proper grip of
conductor with the help of screw adjustable metal plates to increase the surface of contact and
reduce the contact resistance. The screws shall have thread size not less than M 4 and head
having 4-6mm. diameters. The screws shall not have pointed ends at the end of threads. All
terminals and connecting screws should be of tinned/nickel plated brass material.

The internal diameter of terminal hole should be minimum 5.5 mm. The holes in the insulating
material shall be of sufficient size to accommodate the insulation of conductor also.

The terminal cover shall be transparent High grade Engineering Plastic/Polycarbonate/


Thermosetting Plastic with minimum thickness 2.0 mm and the terminal cover shall be of
extended type completely covering the terminal block and fixing holes. The terminal cover
should preferably be detachable. The space inside the terminal cover should be sufficient to
accommodate adequate length of external cables.

12.0 WORKING ENVIRONMENT


As per IS 14697:1999(2004). Meter to perform satisfactorily under Non-Air Conditioned
environment (within stipulations of IS) IP51 housing for indoors.

The meter shall be suitable designed for satisfactory operation under the hot and hazardous
tropical climate conditions and shall be dust and vermin proof. All the parts and surface, which
are subject to corrosion, shall either be made of such material or shall be provided with such
protective finish, which provided suitable protection to them from any injurious effect of
excessive humidity.

13.0 MANUFACTURING PROCESS, ASSEMBLY AND TESTING


Meters shall be manufactured using latest and ‘state of the art’ technology and methods prevalent
in electronics industry. The meter shall be made from high accuracy and reliable surface mount
technology (SMT) components. All inward flow of major components and sub assembly parts (CT,
PT, RTCs / Crystal, LCDs, LEDs, power circuit electronic components etc.) shall have batch and
source identification. Multilayer ‘PCB’ assembly with ‘PTH’ using surface mounted component
shall have adequate track clearance for power circuits. SMT component shall be assembled using
automatic ‘pick-and-place’ machines, Reflow Soldering oven, for stabilized setting of the
components on ‘PCB’. For soldered PCBs, cleaning and washing of cards, after wave soldering
process is to be carried out as a standard practice. Assembly line of the manufacturing system
shall have provision for testing of sub-assembled cards. Manual placing of components and
soldering, to be minimized to items, which cannot be handled by automatic machine. Handling of
‘PCB’ with ICs / C-MOS components, to be restricted to bare minimum and precautions to prevent

WBSEDCL
Page 6
‘ESD’ failure. Complete assembled and soldered PCB should undergo functional testing using
Computerized Automatic Test Equipment.

Fully assembled and finished meter shall under go ‘burn-in’ test process for 24 Hours at 55 degree
Celsius (Max. temperature to not exceed 60 degree Celsius) under base current (Ib) load
condition.

Test points should be provided to check the performance of each block/stage of the meter
circuitry.

RTC shall be synchronized with NPL time at the time of manufacture. Meters testing at
intermediate and final stage shall be carried out with testing instruments, duly calibrated with
reference standard, with traceability of source and date.

14.0 DISPLAY OF MEASURED VALUES


The meter shall have Alphanumeric display with at least 7 full digit with LCD backlit display,
having minimum character height of 10 mm. The meter display shall have 7 digits(complete) for
energy counter with alphanumeric digits for parameter identifier and tamper indication with
backlit Liquid Crystal Display (LCD) of minimum 10 mm height, wide viewing angle suitable for
temperature withstand of 70° C. LCD to be of ‘STN’ (super twisted numeric ) type construction.

The data stored in the meters shall not be lost in the event of power failure. The meter shall
have Non Volatile Memory (NVM), which does not need any battery backup. The NVM shall have a
minimum retention period of 10 years.

Meter shall have Scroll Lock facility to display any one desired parameter continuously from
display parameters.

Auto display cycling of each parameter should be minimum 10-12 Seconds. The time between two
auto display cycles shall be 100-120 sec. OBIS code in display is optional.

It should be possible to easily identify the single or multiple displayed parameters through
symbols/legend on the meter display itself or through display annunciation.

WBSEDCL
Page 7
For 33 kV meters ( 3Phase 4 Wire)

AUTO MODE:
i. LCD Test
ii. Meter Sl no.
iii. Real Time & Date (DD/MM/YYYY)
iv. Rising Apparent Demand with elapsed time
v. Cumulative Power Off Hours
vi. Inst. Primary Voltages –Phase Wise (Ph- N for 3-Ph,4-Wire)
vii. Inst. Primary Currents – Phase Wise
viii. Cumulative Total Active Energy (5+2) (cumulative sign /legend must be given)
ix. Cumulative Total Reactive Energy Lag (5+2)
x. Cumulative Total Reactive Energy Lead (5+2)
xi. Cumulative Apparent Energy (5+2) – Lag Only
xii. Apparent Max. Demand (4+3) – Lag Only
xiii. TOD Wise Total Active Energies
xiv. TOD Wise Apparent Energies
xv. TOD Wise Apparent Max. Demand (MD)
xvi. History 1 Cumulative Active Forward Energy(5+2)
xvii. History 1TOD Wise Cumulative Active Forward Energy(5+2)
xviii. History 1 Cumulative Apparent Forward Energy(5+2)
xix. History 1 TOD Wise Cumulative Apparent Forward Energy(5+2)
xx. History 1 Apparent maximum Demand(4+3)
xxi. History 1 TOD Wise Apparent maximum Demand(4+3)
xxii. Cumulative Apparent Maximum Demand (cumulative sign /legend must be given)
xxiii. Connection Check
xxiv. Self Diagnosis
xxv. Phase Sequence & phase correspondences of voltage and current
xxvi. Cumulative Billing Count
xxvii. Cumulative Tamper Count

PUSH BUTTON MODE :

(i) to (xxvii) of Auto Display and then


xxviii) Cumulative Programming Count
xxix) Last Billing Date & Time
xxx) Signed Inst. Power Factor – Phase Wise
xxxi) Instantaneous Net Phase Power Factor
xxxii) History 1 Billed Average Power Factor
xxxiii) Signed Inst. Active Power,
xxxiv) Inst. Apparent Power
xxxv) Supply Frequency
xxxvi) Present Tamper Status (PT/CT/Other)
xxxvii) First Tamper Occurrence with Date & Time
xxxviii) Last Tamper Occurrence with Date & Time
xxxix) Last Tamper Restoration with Date & Time
xl) Front Cover Open Count
xli) Front Cover Open Indication with Date & Time

WBSEDCL
Page 8
xlii) High Resolution Cumulative Active Forward Energy(2+5)
xliii) High Resolution Cumulative Reactive Forward Energy(lag) (2+5)
xliv) High Resolution Cumulative Reactive Forward Energy(lead) (2+5)
xlv) High Resolution Cumulative Apparent Forward Energy(2+5)
xlvi) Battery Status

Power Off Display

i. Meter Sl no.
ii. Real Time & Date (DD/MM/YYYY)
iii. Cumulative Power Off Hours
iv. Cumulative Total Active Energy (5+2) (cumulative sign /legend must be
given)
v. Cumulative Total Apparent Energy (5+2) – Lag Only
vi. Apparent Max. Demand (4+3) – Lag Only
vii. History 1 Cumulative Active Forward Energy(5+2)
viii. History 1TOD Wise Cumulative Active Forward Energy(5+2)
ix. History 1 Cumulative Apparent Forward Energy(5+2)
x. History 1 TOD Wise Cumulative Apparent Forward Energy(5+2)
xi. History 1 Apparent maximum Demand(4+3)
xii. History 1 TOD Wise Apparent maximum Demand(4+3)
xiii. Cumulative Apparent Maximum Demand (cumulative sign /legend must be
given)

The register shall be able to record and display starting from zero, for a minimum of 2500 hours,
the energy corresponding to rated maximum current at reference voltage and unity power factor.
The register should not roll over in between this duration.

WBSEDCL
Page 9
For 11 kV meters ( 3Phase 3 Wire)
AUTO MODE:
i. LCD Test
ii. Meter Sl no.
iii. Real Time & Date (DD/MM/YYYY)
iv. Rising Apparent Demand with elapsed time
v. Cumulative Power Off Hours
vi. Inst. Primary Voltages –Phase Wise (Ph- Ph for 3-Ph 3Wire)
vii. Inst. Primary Currents – Phase Wise
viii. Cumulative Total Active Energy (5+2) (cumulative sign /legend must be given)
ix. Cumulative Total Reactive Energy Lag (5+2)
x. Cumulative Total Reactive Energy Lead (5+2)
xi. Cumulative Total Apparent Energy (5+2) – Lag Only
xii. Apparent Max. Demand (4+3) – Lag Only
xiii. TOD Wise Total Active Energies
xiv. TOD Wise Apparent Energies
xv. TOD Wise Apparent Max. Demand (MD)
xvi. History 1 Cumulative Active Forward Energy(5+2)
xvii. History 1TOD Wise Cumulative Active Forward Energy(5+2)
xviii. History 1 Cumulative Apparent Forward Energy(5+2)
xix. History 1 TOD Wise Cumulative Apparent Forward Energy(5+2)
xx. History 1 Apparent maximum Demand(4+3)
xxi. History 1 TOD Wise Apparent maximum Demand(4+3)
xxii. Cumulative Apparent Maximum Demand (cumulative sign /legend must be given)
xxiii. Connection Check
xxiv. Self Diagnosis
xxv. Phase Sequence & phase correspondences of voltage and current
xxvi. Cumulative Billing Count
xxvii. Cumulative Tamper Count

PUSH BUTTON MODE :

(i) to (xxvii) of Auto Display and then


xxviii. Cumulative Programming Count
xxix. Last Billing Date & Time
xxx. Signed Inst. Power Factor – Phase Wise
xxxi. Instantaneous Net Phase Power Factor
xxxii. History 1 Billed Average Power Factor
xxxiii. Signed Inst. Active Power,
xxxiv. Inst. Apparent Power
xxxv. Supply Frequency
xxxvi. Present Tamper Status (PT/CT/Other)
xxxvii. First Tamper Occurrence with Date & Time
xxxviii. Last Tamper Occurrence with Date & Time
xxxix. Last Tamper Restoration with Date & Time
xl. Front Cover Open Count
xli. Front Cover Open Indication with Date & Time

WBSEDCL
Page 10
xlii. High Resolution Cumulative Active Forward Energy(2+5)
xliii. High Resolution Cumulative Reactive Forward Energy(lag) (2+5)
xliv. High Resolution Cumulative Reactive Forward Energy(lead) (2+5)
xlv. High Resolution Cumulative Apparent Forward Energy(2+5)
xlvi. Battery Status

Power Off Display

i. Meter Sl no.
ii. Real Time & Date (DD/MM/YYYY)
iii. Cumulative Power Off Hours
iv. Cumulative Total Active Energy (5+2) (cumulative sign /legend must be given)
v. Cumulative Total Apparent Energy (5+2) – Lag Only
vi. Apparent Max. Demand (4+3) – Lag Only
vii. History 1 Cumulative Active Forward Energy(5+2)
viii. History 1TOD Wise Cumulative Active Forward Energy(5+2)
ix. History 1 Cumulative Apparent Forward Energy(5+2)
x. History 1 TOD Wise Cumulative Apparent Forward Energy(5+2)
xi. History 1 Apparent maximum Demand(4+3)
xii. History 1 TOD Wise Apparent maximum Demand(4+3)
xiii. Cumulative Apparent Maximum Demand (cumulative sign /legend must be given)

The register shall be able to record and display starting from zero, for a minimum of 2500 hours,
the energy corresponding to rated maximum current at reference voltage and unity power factor.
The register should not roll over in between this duration.

WBSEDCL
Page 11
For LT meters ( 3Phase 4 Wire)

AUTO MODE:
i) LCD Test
ii) Meter Sl. no.
iii) Real Time & Date (DD/MM/YYYY)
iv) Rising Apparent Demand with elapsed time
v) Cumulative Power Off in Hours
vi) Inst. Voltages –Phase Wise (Ph- N for 3-Ph,4-Wire)
vii) Inst. Primary Currents – Phase Wise
viii) Cumulative Active Forward Energy
ix) Reactive Lag Forward Energy Register
x) Reactive Lead Forward Energy Register
xi) Total Apparent Forward Energy Register
xii) Apparent Forward MD Register (00-24hrs)
xiii) TOD Wise Total Active Energies
xiv) TOD Wise Apparent Energies
xv) TOD Wise Apparent Max. Demand (MD)
xvi) History1 Cumulative Total Active Energy (7 full digit) (cumulative sign
/legend must be given)
xvii) History1 TOD Wise Total Active Energies
xviii) History1 Cumulative Apparent Energy (7 full digit) – Lag Only
xix) History1 TOD Wise Apparent Max. Demand (MD)
xx) History1 Apparent Max. Demand (4+3) – Lag Only(00-24hrs)
xxi) History1 TOD Wise Apparent Energies
xxii) Cumulative Apparent Maximum Demand (cumulative sign /legend must be
given)
xxiii) Connection Check
xxiv) Self Diagnosis
xxv) Phase Sequence & phase correspondences of voltage and current
xxvi) Cumulative Billing Count
xxvii) Cumulative Tamper Count

PUSH BUTTON MODE :


(i) to (xxvii) of Auto Display and then
xxviii) Cumulative Programming Count
xxix) Apparent Forward MD Register (00-24hrs)
xxx) TOD wise Cumulative Active Forward Energy
xxxi) TOD wise Cumulative Apparent Forward Energy
xxxii) TOD wise Apparent Forward MD Register
xxxiii) Apparent Forward Cumulative MD Register
xxxiv) Phase Sequence & phase correspondences of voltage and current
xxxv) Last MD Reset Date & Time
xxxvi) Signed Inst. Power Factor – Phase Wise
xxxvii) Instantaneous Average Factor
xxxviii) History 1 Billed Average Power Factor
xxxix) Signed Inst. Active Power,
xl) Inst. Apparent Power
xli) Supply Frequency
xlii) Present Tamper Status (Voltage related/Current related/Other)

WBSEDCL
Page 12
xliii) First Tamper Occurrence with Date & Time
xliv) Last Tamper Occurrence with Date & Time
xlv) Last Tamper Restoration with Date & Time
xlvi) Front Cover Open Count
xlvii) Front Cover Open Indication with Date & Time
xlviii) High Resolution Cumulative Active Forward Energy(Minimum 2+4)
xlix) High Resolution Cumulative Reactive Forward Energy(lag) (Minimum 2+4)
l) High Resolution Cumulative Reactive Forward Energy(lead) (Minimum 2+4)
li) High Resolution Cumulative Apparent Forward Energy(Minimum 2+4)
lii) Battery Status

Power Off Display

i. Meter Sl no.
ii. Real Time & Date (DD/MM/YYYY)
iii. Cumulative Power Off Hours
iv. Cumulative Total Active Energy (5+2) (cumulative sign /legend must be given)
v. Cumulative Total Apparent Energy (5+2) – Lag Only
vi. Apparent Max. Demand (4+3) – Lag Only
vii. History 1 Cumulative Active Forward Energy(5+2)
viii. History 1TOD Wise Cumulative Active Forward Energy(5+2)
ix. History 1 Cumulative Apparent Forward Energy(5+2)
x. History 1 TOD Wise Cumulative Apparent Forward Energy(5+2)
xi. History 1 Apparent maximum Demand(4+3)
xii. History 1 TOD Wise Apparent maximum Demand(4+3)
xiii. Cumulative Apparent Maximum Demand (cumulative sign /legend must be given)

The register shall be able to record and display starting from zero, for a minimum of 2500 hours,
the energy corresponding to rated maximum current at reference voltage and unity power factor.
The register should not roll over in between this duration.

Push button mechanism should be of high quality and should provide trouble free service for a
long span of time. Up and Down scrolling facility should be there for Push Button Mode.

15.0 MAXIMUM DEMAND


The meter should be capable of recording the Apparent and Active MD with integration period of
15 minutes (programmable).

MD RESET OPTION

i) Billing Date at 00:00 Hrs (Programmable) on 1st day of the month.

ii) Push button

iii) By Authenticated Command from BCS through HHU or directly from PC and REMOTE
Communication.

MD reset button should have proper sealing arrangement. Specific operation should be available
in downloading data.

WBSEDCL
Page 13
16.0 PERFORMANCE UNDER INFLUENCE QUANTITIES
The meters performance under influence quantities shall be governed by IS 14697:1999 (2004).
The accuracy of meter shall not exceed the permissible limits of accuracy as per standard IS
14697:1999(2004)

17.0 OUTPUT DEVICE


Energy Meter shall have test output, accessible from the front, and be capable of being monitored
with suitable testing equipment while in operation at site. The operation indicator must be visible
from the front and test output device shall be provided in the form of LED. Resolution of the test
output device shall be sufficient to enable the starting current test in less than 10 minutes.
Minimum gap should be maintained between Active & Reactive Test LED.

18.0 REAL TIME INTERNAL CLOCK (RTC)


RTC shall be pre-programmed for 30 Years Day and date without any necessity for correction. The
maximum drift shall not exceed ± 300 Seconds per year. Meter may be lying in power off
condition for two years (less than 730 days) from date of supply but RTC should not drift more
than ± 300 seconds.

The clock day and date setting and synchronization shall only be possible through password/Key
code command from one of the following:

a) Hand Held Unit (HHU) or directly through BCS and this shall authentication from BCS for
individual meter.

b) From remote server through suitable communication network with authentication from BCS.

19.0 TIME OF DAY FACILITIES:


The meter should have facilities to record Active, Apparent Energies and MD with a facility of 8
time zones. The time zones should be user programmable through authenticated command
from BCS with the help of HHU.

20.0 METER READING DURING POWER OFF:


It should be possible to read the meter-display visually and with MRI and in absence of input
voltages with the help of internal battery for display in power off condition or external battery
pack/PPU. The interface should be inductive coupling. If internal battery is used then it shall
be capable of supplying the required power for at least two years under meter unpowered
condition. Bidders’ must mention the consumption of battery(in mA) (in the submitted
documents) during power off display and data downloading process in power off condition
and this will be checked during sample meter testing.

WBSEDCL
Page 14
21.0 SELF DIAGNOSTIC FEATURES :
The meter shall be capable of performing complete self-diagnostic check to monitor the circuits
for any malfunctioning to ensure integrity of data memory location all the time. If possible, the
details of malfunctioning should be recorded in the meter memory. The bidder should furnish
the details of self-diagnostic capability feature, viz (i) Memory status, (ii) Battery status
(iii) NVM Status and it should be available in display as well as BCS end data..

22.0 BASE COMPUTER SOFTWARE (BCS):


The BCS should be compatible Windows 7(both 32 bit and 64 bit), Windows 8(64 bit), &
Windows 10 operating systems and copy righted. The data stored in the meters memory
including defrauded energy should be available on the BCS. Only one BCS should be provided
for downloading data and programming of meter from CMRI and Laptop.

Before performing and transaction through authenticated CMRI or Laptop the software
should be programmed so as to take full meter reading as back up and the said data must be
available at BCS end.

The data transfer should be reliable and fraud proof. BCS should give all details pertaining to
billing and load survey data. The meter condition details should also be transferred into the BCS
including abnormalities/anomalies of voltage current conditions or tamper conditions which can
occur due to mistake in connections or intentionally done for the purpose of tamper.

The software should show electrical conditions existing at the time of reading the meter in tabular
forms as well as in graphical format (Phasor diagram).

All the information about energy, maximum demand and their respective TOD register
readings, billing register readings and billing history readings should be shown in a
manner which user can understand quickly, preferably in tabular format.

All the load survey data should be available in numerical as well as graphical format. It
should also be possible to view this data in daily, weekly and monthly formats. The load survey
graph should show values.

All the information about tamper events should be accompanied with date and time stamping
along with the ‘SNAPSHOT’ (details) of the respective electrical conditions. This information
should be displayed in the sequence in which it happened, in cumulative format as well as in
summary format. The cumulative format should segregate a particular tamper information and
summary report should show count of tamper occurrence, restoration and the duration for which
meter has remained under tamper condition.

In BCS, tamper events must be followed as per Table 32-38 as per Annexure-G. In display, first
tamper occurrence & last tamper occurrence & restoration with date & time and total tamper
count must be available.

Facility to view data incorporating External multiplying factor due to Installed CTs & PT
should be provided.

The software should be capable of preparing CMRI to read the meter information or to
reconfigure the meter for change the setting of the meter as per IS 15959:2011.

The BCS should have the facility for ASCII conversion of all recorded meter data. There
should be user friendly approach for viewing meter data for the reading collected now or for the

WBSEDCL
Page 15
reading collected in the past. All information about a particular consumer should be segregated
and available at one place so that locating any consumer's past data is easy. It should be possible
to locate/retrieve data on the basis of one of the following particulars:

a) Consumer ID/Number.
b) Meter Sr. No.
c) Date of meter reading.
d) Location.

The BCS shall have multi level password for data protection and security. The first level
should allow the user to enter the system. The different software features shall be protected by
different passwords. The configuration of passwords should be user definable. The software
installed on one PC should not be copy-able on to another PC.

It is very important that the BCS has the feature to export available data to ASCII format for
integrating with the WBSEDCL billing system. Here again a wizard should be available
whereby user can select file format (for ASCII), what data to export, the field width
selection (whether 8 characters or 10 characters, to include decimal point or not, number
of digits after decimal point etc).

Help should be available with the software so that user can use all the features of the software by
just reading the Help contents.

12 (twelve) months back up data for Main and TOD Registers for KWH/MWH,
KVARH/MVARH (Lag), KVARH/MVARH(Lead), KVAH/MVAH and MD in kW & KVA/MW &
MVA with date and time & Average Power factor should be available at BCS end. The
means by which MD reset has been done must be available at BCS end data.

22.0 LOAD SURVEY:


The meter should be capable of recording load survey data of Phase wise Voltage, Phase
wise current, Active Energy, Reactive Energy (lag & lead) Apparent Energy and Active and
Apparent Demand, Net Power Factor for a period of minimum 60 POWER ON days for 15-
minute (programmable) integration period. Default integration period is 15 minutes. Real
time & date should be shown in all the load survey graphs and table. All the load survey data
should be available in numerical as well as graphical format. It should also be possible to view this
data in daily, weekly and monthly formats. The load survey graph should show values.

23.0 MEASUREMENT OF ENERGY


The meter should be capable of measuring Fundamental Energy as well Total Energy (i.e.
Fundamental plus Harmonics energy). Total Energy shall be made available on meter-display and
the same only shall be used for billing purpose. Fundamental Energy should be provided in BCS.

The Fundamental as well as Total Energy shall be logged in the meter memory and be capable
of downloading to the BCS through the HHU and be available for viewing at the BCS end.

WBSEDCL
Page 16
24.0 MARKING OF METERS
Every meter shall have a nameplate clearly visible and indelible and distinctly marked in
accordance with the relevant Standard mentioning “Category – C1” (not applicable for Non-
DLMS Meter). The following information should appear on an external plate attached to the
meter cover.

i) Manufacturers Name or trademark and place of manufacture.


ii) Designation of type.
iii) Number of phases and wires.
iv) Serial number of meter.
v) Month and year of manufacture.
vi) Principal unit of measurement.
vii) P.T. Ratio.
viii) Basic Current and rated maximum current.
ix) C.T. Ratio.
x) Reference frequency in Hz.
xi) Meter constant (impulse/unit).
xii) Class index of meter.
xiii) Reference temperature.
xiv) “Property of WBSEDCL”
xv) Purchaser’s Order No. & Date.
xvi) Guarantee for 5 & ½ years from the date of supply
xvii) Sign. of insulation.
xviii) Bar coding of Serial Number, month & year of manufacture
xx) Power Factor Range
xxi) BIS marking and License no
xxii) Right and left LED nomenclature
The meter shall also store name plate details as given in the Table - 30 of IS 15959:2011

25.0 COMMUNICATION CAPABILITY


The meter shall be provided with two ports for communication of the measured/collected data.
The hardware port (with sealing facility) compatible with RS 232 specifications which shall
be used for remote access through suitable Modem and an Optical port complying with
hardware specifications detailed in IEC-62056-21. This shall be used for local data downloading
through a DLMS compliant HHU or direct through BCS. Both ports shall support the default and
minimum baud rate of 9600 bps.

Optical Cord (i.e. Optical Port of Meter to PC) must be USB type.

Data downloading time from meter to HHU and PC should be within 2 min for meter data
without load survey and within 6 min for meter data with load survey.

26.0 HAND HELD UNIT (HHU)

WBSEDCL
Page 17
To enable local reading of meters data a DLMS compliant HHU (DOS Based) shall be used. The
HHU shall be as per IS 15959:2011. It shall be compatible to the DLMS compliant energy meters
that are to be procured/supplied on the basis of the specification having at least one USB
communication port.

27.0 TAMPER & FRAUD MONITORING FEATURES


The meter shall work satisfactorily under presence of various influencing conditions like External
Magnetic Field, Electromagnetic Field, Radio Frequency Interference, Vibrations, Harmonic
Distortion, Voltage and Frequency Fluctuations, and Electromagnetic High Frequency Fields etc.
The meter shall be immune to abnormal voltage or frequency generating devices and shall record
the occurrence and restoration of all tampers and related snapshots as per Annexure – G of IS
15959:2011

The accuracy of meter should not be affected with the application of abnormal voltage/ frequency
generating device such as spark discharge of approximately 35 kV.

The meters should work even in the presence of any two Potential wires.

Meter should work correctly irrespective of phase sequence.

Meter should also be immune for tamper by application of remote induction device
i.e. radiated spark through Jammer circuit.

Tamper details shall be stored in internal memory for retrieval by authorized personnel through
either of the following:
a) DLMS compliant HHU.
b) Remote access through suitable communication network.
c) Direct by PC.
Meter should have a continuous and clear indication / annunciation in its display if top cover is
removed /open and even refixed (non roll over) and only cover open must be logged in BCS
without any restoration. Auto scroll display may be sacrificed for that COVER OPEN .

Minimum 400 numbers of events (compartment wise) i.e. 200 no. events for occurrences &
200 no. events for restoration with date & time and snapshot should be available in the
meter memory.

Default occurrence and restoration time shall be 5 minutes but it shall be


programmable.

All the tamper information logged by the meter should be available in BCS with snapshot, Date &
Time as per Table 39 of IS 15959:2011 with occurrence and restoration.

Properly designed meter tamper logic with threshold value, should be provided and clearly
explained in the bid. The tamper logic should be capable of discriminating the system
abnormalities from source side and load side and it should not log / record tamper due to source
side abnormalities. The meter should be able to distinguish between HT PT fuse blowing and
Single Phasing and record the former.

Following are the tampers which need to be incorporated in the meter :


For 33 KV 3Phase 4 Wire Meters:

WBSEDCL
Page 18
(Threshold as per Schedule I)
1. Missing Potential (Phase Wise)
2. Voltage Unbalance
3. Low Voltage
4. Power Failure
5. CT Open (Phase Wise)
6. CT Bypass
7. Current Unbalance
8. CT Reversal (Phase Wise)
9. Magnetic Tamper
10. Cover Open
11. 35 KV ESD
12. Jammer

For 11 KV 3Phase 3 Wire Meters:


(Tamper Thresholds should be as per bidders’ threshold)
1. Missing Potential ( With Phase Indication)
2. Voltage Unbalance
3. Low Voltage
4. CT Reversal (Phase Wise)
5. Current Imbalance
6. Invalid Phase Association
7. Power On/OFF event.
8. Magnetic Tamper
9. Cover open.
10. 35 KV ESD
11. Jammer

For 240 V 3Phase 4 Wire LTCT Meters:


(Threshold as per Schedule I)
1. Missing Potential (Phase Wise)
2. Voltage Unbalance
3. Low Voltage
4. Power Failure
5. CT Open (Phase Wise)
6. CT Bypass
7. Current Unbalance
8. CT Reversal (Phase Wise)
9. Invalid Phase Association
10. Magnetic Tamper
11. Cover Open
12. Neutral Disturbance
13. 35 KV ESD
14. Jammer
28.0 TYPE TESTS
Meters shall be fully type tested as per relevant Standard (latest version). The type test
certificates should be submitted along with the offer. Offer without Type Test Report shall be
liable for rejection. The type test certificate shall not be more than five years old.
WBSEDCL
Page 19
29.0 ACCEPTANCE & ROUTINE TESTS:
All acceptance tests as per relevant standards shall be carried out in the presence of utility
representatives.
Further Purchaser shall reserve the right to pick up energy meters at random from the lots
offered and get the meter tested from NABL accredited lab. The supplier has no right to contest
the test results NABL accredited lab or for additional test and has to replace/take corrective
action at the cost of the supplier.

30.0 INSPECTION:
The inspection shall be carried out at any stage of manufacture, by the WBSEDCL authorized
representatives, with prior intimation to the supplier. The manufacturer shall grant all reasonable
facilities for testing free of charge for inspection and testing to satisfy the purchaser that the
materials to be supplied are in accordance with their specification.

The supplier shall keep the WBSEDCL informed in advance, about the manufacturing
program so that the arrangement can be made for inspection.

The representative / Engineer of the WBSEDCL attending the above testing shall carry out testing
as per relevant standards and issue test certificate approval to the manufacturer and give
clearance for dispatch.

31.0 QUALITY ASSURANCE:


The manufacturer shall have a comprehensive quality assurance program at all stages of
manufacture for ensuring products giving reliable, trouble free performance. Details of the
bidder’s quality assurance and test set up shall be furnished with the bid. A detailed quality
assurance program shall be finalized with the successful bidder during the award stage.

Bidder shall furnish following information along with his bid:

a) Organization structure of the manufacturer and his main sub-suppliers (PCBs, SMT cards,
CT/PT) with details of ‘QA’ setup, overall workflow.
b) Copy of system manual showing ‘QAP’ (Quality Assurance Plan) as actually practiced
during manufacturing and final testing.
c) List of raw materials and critical components (ASIC chip, crystal clock, memory
register Chip, transformers, optical ports etc.) with their suppliers and
procurement details.
d) Stage inspection of product before final testing.
e) Procedure adopted for ‘In-situ’ testing of PCBs, after placement of surface mounted
component, for quantitative parametric variation of tolerance by self or sub-contractor.
f) Testing and calibration facility, date of calibration of test bench, manpower data of bench
operators;
g) Sample copies of test certificate of bought out components.
32.0 TESTING FACILITIES:
The Bidder shall have at least the following testing facilities to ensure accurate calibration:
a) Insulation resistance measurement

WBSEDCL
Page 20
b) Running at no load
c) Starting current test
d) Limits of error
e) Dial Test
f) Power loss in voltage and current ckt.
g) Repeatability of error
h) Transportation test
i) Tamper Test
j) Ageing Test
The Bidder shall give a detailed list of bought out items with name of the manufacturer and details
about quality control.
33.0 GUARANTEE
Equipment (Meter) supplied shall be guaranteed for a period of 66 months from the date of
supply. Bidders shall guarantee to replace the meters, which are found to be
defective/inoperative at the time of installation, or become inoperative/ defective during
guarantee period. Replacements shall be effected within 1 month from the date of
intimation.

The Bank Guarantee shall remain valid for 7½ years with a claim period for six months.

34.0 FIXING & SEALING ARRANGEMENT


Every meter shall have three fixing holes one at the top and two at the bottom. The top hole
shall be provided with a special clip at the back of the meter so that holding screw is not
accessible to the consumer after the fixing of the meters. The lower fixing screws shall be
provided under the sealed terminal cover. The requisite fixing screws shall be
supplied with each meter.

Necessary provision may be kept for fixing the utility seal also as per CEA guidelines.
The manufacturers seal provided with the meter should be of high quality with tamper proof
features.
35.0 Supply of HHU/Tab & Communication Cord (HHU/Tab to PC &
Meter to PC)
For every 100 nos. of meters and part thereof one HHU (DOS Based) Analogic Make & 100 nos.
communication cord for each type(Optical to Serial Port and Optical to USB Port) should be
supplied free of cost. The guarantee period of HH/Tab will be of 66 months from the date of
supply.

36.0 SUBMISSION OF SAMPLE & DOCUMENTS


While submitting the Quotation to the Material Controller, Central Stores & Purchase Department,
Vidyut Bhavan, 4th Floor, B – Block Kolkata- 700 091, sample meter having all the mentioned
features, BCS with allied software and sample of seal etc. along with the Type Test Certificates,
DLMS Certificate and with the test results and ISI Certificate, Tamper Logic, Display
Parameters List is to be submitted to C.E. (DTD), Abhikshan within 13:00 hrs. on declared date
and copy of letter indicating acceptance of Sample by the Office of the C.E. (DTD) is to be
submitted to the Material Controller prior to Opening of Offer. Offer will not be accepted without
submission of sample and the Tender will not be opened. Any other accessories required for
WBSEDCL
Page 21
observing the performance & capabilities of the Meter are to be submitted along with
offer.Sample meters shall be submitted to C.E. (DTD). A confirmation from C.E. (DTD) regarding
submission of sample as detailed below shall have to be submitted along with the Techno-
Commercial Bid as follows:-
i) 3-Phase 4-Wire 240 V, 200/5A. Class of Accuracy 0.5s –
a. 2No sample . with ultrasonic welding. (for accuracy & tamper)
b. 1 no sample without ultrasonic welding( for physical verification of components)
c. 1 no prototype ( for verification of ultrasonic welding)
ii) 3-Phase 3-Wire 11KV, 50/5A. Class of Accuracy 0.5s – 2Nos. with ultrasonic welding.
a. 2No sample . with ultrasonic welding. (for accuracy & tamper)
b. 1 no sample without ultrasonic welding( for physical verification of components)
c. 1 no prototype ( for verification of ultrasonic welding)
iii) 3-Phase 4-Wire 33 KV, 100/1A. Class of Accuracy 0.5s – 2Nos. with ultrasonic welding.
a. 2No sample . with ultrasonic welding. (for accuracy & tamper)
b. 1 no sample without ultrasonic welding( for physical verification of components)
c. 1 no prototype ( for verification of ultrasonic welding)
HHU, Power-Pack, Modem along with SIM Card if required, to be brought at the time of testing of
sample meters submitted against the tender.

37.0 SCHEDULES:
The Bidder shall submit the following schedules (as per Standard Format), which is part and
parcel of the Specification.

Schedule A Guaranteed Technical Particulars


Schedule B List of Raw Material(as per enclosed format)
Schedule C Pre Qualification Condition
Schedule D List of Documents to be submitted during sample submission
Schedule E Deviations from Specified Standards (As per standard format of the Bidder)
Schedule F Deviations from Specified Test Requirements(As per standard format of the Bidder)
Schedule G Deviations from Technical Specification(As per Annexure –IV – Deviation sheet of GCC)
Schedule H Bidders Experience (As per standard format of the bidder and also Copies of order
executed along with GTP of the supplied meters.)
Schedule I Tamper Thresholds

WBSEDCL
Page 22
Schedule - A

GUARANTEED TECHNICAL PARTICULARS FOR


11KV, STATIC TRIVECTOR METERS

Manufacturer’s
Sl.No. Description Required Specification
particulars

1 Maker’s name and country To be mentioned


2 Type of meter/model To be mentioned
3 Accuracy class 0.5S
4 Parameters displayed To be mentioned
5 P.F. Range 0 Lag – Unity - 0 Lead
6 Basic Current (Ib) 5A
7 Maximum Current 200 % of Ib
8 Minimum starting current 0.1% of Ib
Ph-Ph : 110 V
9 Rated Voltage
Ph – N : 63.5 V
Variation of voltage at which
10 -30% to + 20% of Vref
meter functions normally
11 Rated Frequency 50Hz
Voltage Circuit Less than
1.5W/8VA,
Power Loss in Voltage & Current
12 Current Circuit Less than 1VA.
Circuits
(Less VA/ Watt getting the
preference)
13 Dynamic range To be mentioned
a) Through authenticated
CMRI or Remote
14 MD reset Provisions Communication Command b)
Automatic resetting at preset
date & time.
Seven segment, minm. 8 digit
Liquid Crystal Display (LCD)
No. of digits of display and height
15 with backlit or LED, having
of character
minimum character height of
10 mm.
16 Size of Non volatile memory To be mentioned
17 Principle of operation To be mentioned
15 Minutes/5 Minutes
18 MD Integration period
(Programmable)
19 Weight of meter To be mentioned
20 Dimensions To be mentioned
21 Warranty 5½ years from date of supply
22 Outline drawings & Leaflets To be furnished
a) Remote meter-readout facility To be mentioned
b) Communication protocol used. To be mentioned
23
c) Sealing provision for meter &
To be mentioned
optical port.
d) Baud rate of data transmission To be mentioned

WBSEDCL
Page 23
e) Required software to be To be mentioned
resident in CMRI and BCS.
f) Ultrasonic welding of body To be mentioned
g) Manufacturer’s Seal provided To be mentioned
Windows 7, 8, 8.1 and 10
24 Base Computer Software
based
25 Type Test Certificates To be furnished
26 Time of Day Zones (Selectable) To be mentioned
27
Whether meter measures both Both required
fundamental & Harmonic Energy
28 Max. drift per annum
Real Time Clock Accuracy ±300 for Class 0.5S.
29 Anti Tamper Features To be mentioned in details.
Data retention by NVM without 10 years
30 battery back up and un-powered
condition.
5½ Years from the date of
supply. Guarantee period
31 Guarantee period of meter
shall be printed on the
nameplate.
32 BIS license To be mentioned
BIS license No. & dt. with its validity
32.1 for ISI certification mark on offered To be mentioned
meter.
Details of meter design for which
32.2 above BIS certification has been To be mentioned
obtained: -
(i) Ratio of Ib to Imax
(ii) Material of meter body
Grade of printed circuit Board
(iii)
material
Type of assembly of component used
(iv)`
(SMT)
(v) Meter constant (IMP / KWh)
Auxiliary power circuit (with PT or
(vi)
PT less)
(vii) Accuracy class
ISO accreditation no. & dt. with its
33
validity
Conform to specification of IS-
14697 / 1999 & CBIP
Other parameters / features not technical report No. 88/325
34
covered in the above GTP
(with its latest amendment)

Copies of order executed in


last three years along with
GTP of the supplied meters to
35 Past Experience be enclosed. Past experience
to be considered for
manufacturing meter as per
IS: 14697 & CBIP-88/325

WBSEDCL
Page 24
GUARANTEED TECHNICAL PARTICULARS FOR
, 33KV STATIC TRIVECTOR METERS

Manufacturer’s
Sl.No. Description Required Specification
particulars

1 Maker’s name and country To be mentioned

2 Type of meter/model To be mentioned

3 Accuracy class 0.5S

4 Parameters displayed To be mentioned

5 P.F. Range 0 Lag – Unity - 0 Lead

6 Basic Current (Ib) 1A

7 Maximum Current 200 % of Ib

8 Minimum starting current 0.1% of Ib

9 Rated Voltage Ph-P : 110V


Ph – N : 63.5 V

10 Variation of voltage at which -30% to + 20% of V ref


meter functions normally

11 Rated Frequency 50Hz

12 Power Loss in Voltage & Current Voltage Circuit Less than


circuits 1.5W/8VA,
Current Circuit Less than
1VA.
(Less VA/ Watt getting the
preference)

13 Dynamic range To be mentioned

14 MD reset Provisions a) Through authenticated


CMRI or Remote
Communication Command
b) Automatic resetting at
preset date & time.

15 No. of digits of display and Seven segment, minm. 8


height of character digit Liquid Crystal Display
(LCD) with backlit or LED,
having minimum character
height of 10 mm.

16 Size of Non volatile memory To be mentioned

WBSEDCL
Page 25
17 Principle of operation To be mentioned

18 MD Integration period 15 Minutes / 5


Minutes(programmable)

19 Weight of meter To be mentioned

20 Dimensions To be mentioned

21 Warranty 5½ years from date of


supply

22 Outline drawings & Leaflets To be furnished

23 a) Remote meter-readout facility To be mentioned

b) Communication protocol To be mentioned


used.

c) Sealing provision for meter & To be mentioned


optical port.

d) Baud rate of data To be mentioned


transmission

e) Required software to be To be mentioned


resident in CMRI and BCS.

f) Ultrasonic welding of body To be mentioned

g) Manufacturer’s Seal provided To be mentioned

24 Base Computer Software Windows 7, 8, 8.1, 10


based

25 Type Test Certificates To be furnished

26 Time of Day Zones (Selectable) To be mentioned

27 Whether meter measures both Both required


fundamental & Harmonic Energy

28 Real Time Clock Accuracy Max. drift per annum


±300 for Class 0.5S.

29 Anti Tamper Features To be mentioned in details.

30 Data retention by NVM without 10 years


battery back up and un-powered
condition.

31 Guarantee period of meter 5½ Years from the date of


supply. Guarantee period
shall be printed on the
nameplate.

WBSEDCL
Page 26
32 BIS license To be mentioned

32.1 BIS license No. & dt. with its To be mentioned


validity for ISI certification mark
on offered meter.

32.2 Details of meter design for which To be mentioned


above BIS certification has been
obtained: -

(i) Ratio of Ib to Imax

(ii) Material of meter body

(iii) Grade of printed circuit Board


material

(iv)` Type of assembly of component


used (SMT)

(v) Meter constant (IMP / KWh)

(vi) Auxiliary power circuit (with PT


or PT less)

(vii) Accuracy class

33 ISO accreditation no. & dt. with


its validity

34 Other parameters / features not Conform to specification of


covered in the above GTP IS-14697 / 1999 & CBIP
technical report No.88 &
325 (with its latest
amendment).

35 Past Experience Copies of order executed


in last three years along
with GTP of the supplied
meters to be enclosed.
Past experience to be
considered for
manufacturing meter as
per IS: 14697 & CBIP-325

WBSEDCL
Page 27
GUARANTEED TECHNICAL PARTICULARS FOR
240 V LT CT, STATIC TRIVECTOR METERS

Manufacturer’s
Sl.No. Description Required Specification
particulars

1 Maker’s name and country To be mentioned

2 Type of meter/model To be mentioned

3 Accuracy class 0.5 S

4 Parameters displayed To be mentioned

5 P.F. Range 0 Lag – Unity - 0 Lead

6 Basic Current (Ib) 5A

7 Maximum Current 200 % of Ib

8 Minimum starting current 0.1% of Ib

9 Rated Voltage Ph-P : 415 V


Ph – N : 240 V

10 Variation of voltage at which -30% to + 20% of Vref


meter functions normally

11 Rated Frequency 50Hz

12 Power Loss in Voltage & Current Voltage Circuit Less than


circuits 1.5W/8VA,
Current Circuit Less than
1VA.
(Less VA/ Watt getting the
preference)

13 Dynamic range To be mentioned

14 MD reset Provisions a) Through authenticated


CMRI or Remote
Communication Command
b) Automatic resetting at
preset date & time.

15 No. of digits of display and Seven segment, minm. 8


height of character digit Liquid Crystal Display
(LCD) with backlit or LED,
having minimum character
height of 10 mm.

16 Size of Non volatile memory To be mentioned

17 Principle of operation To be mentioned

WBSEDCL
Page 28
18 MD Integration period 15 Minutes/ 5 Minutes
(programmable)

19 Weight of meter To be mentioned

20 Dimensions To be mentioned

21 Warranty 5½ years from date of


supply

22 Outline drawings & Leaflets To be furnished

23 a) Remote meter-readout facility To be mentioned

b) Communication protocol To be mentioned


used.

c) Sealing provision for meter & To be mentioned


optical port.

d) Baud rate of data To be mentioned


transmission

e) Required software to be To be mentioned


resident in CMRI and BCS.

f) Ultrasonic welding of body To be mentioned

g) Manufacturer’s Seal provided To be mentioned

24 Base Computer Software Windows 7, 8, 8.1, 10


based

25 Type Test Certificates To be furnished

26 Time of Day Zones (Selectable) To be mentioned

27 Whether meter measures both Both required


fundamental & Harmonic Energy

28 Real Time Clock Accuracy Max. drift per annum


±300 for Class 0.5S.

29 Anti Tamper Features To be mentioned in details.

30 Data retention by NVM without 10 years


battery back up and un-powered
condition.

31 Guarantee period of meter 5½ Years from the date of


supply. Guarantee period
shall be printed on the
nameplate.

32 BIS license To be mentioned

WBSEDCL
Page 29
32.1 BIS license No. & dt. with its To be mentioned
validity for ISI certification mark
on offered meter.

32.2 Details of meter design for which To be mentioned


above BIS certification has been
obtained: -

(i) Ratio of Ib to Imax

(ii) Material of meter body

(iii) Grade of printed circuit Board


material

(iv)` Type of assembly of component


used (SMT)

(v) Meter constant (IMP / KWh)

(vi) Auxiliary power circuit (with PT


or PT less)

(vii) Accuracy class

33 ISO accreditation no. & dt. with


its validity

34 Other parameters / features not Conform to specification of


covered in the above GTP IS-14697 / 1999 & CBIP
technical report No.88 &
325 (with its latest
amendment).

35 Past Experience Copies of order executed


in last three years along
with GTP of the supplied
meters to be enclosed.
Past experience to be
considered for
manufacturing meter as
per IS: 14697 & CBIP-325

WBSEDCL
Page 30
SCHEDULE - B

List of Raw Material (as per enclosed format


Sl no Component Make / Origin
Function / Feature

1 Current Element
2 Measurement /
Computing chips
3 Memory chips
4 Display modules
5 Communication
modules
6 Optical port
7 Power Supply
8 Electronic
components
9 Mechanical parts
10 Battery
11 RTC / Micro
controller

Schedule-C
Pre-Qualification Conditions for HT Static Meters
Sl. No. Particulars Remarks

Bidders must have valid BIS certification for the


1 Yes / No
offered meter. If it has started to issue by
appropriate authority.
2 Bidder preferably posses ISO 9001 certification Yes / No
Bidder should be manufacturers of static meters
having supplied Static LT, 11/33 KV H.T. Meters
3 with memory and LCD display as per IS 14697 & Yes / No
CBIP 325 to Electricity Boards / Utilities in the
past3 years
Bidders should have dust free, static protected
4 environment for manufacture, assembly and Yes / No
Testing.
5
Bidder should have automatic computerized test Yes / No
bench for lot testing of meters
6 Bidder has facilities of Oven for ageing test. Yes / No

WBSEDCL
Page 31
Schedule-D
LIST OF DOCUMENTS TO BE
Sl. No. SUBMITTED DURING SAMPLE
SUBMISSION
Attested copy of type test
reports from NABL accredited
1
laboratory as per new IS(If
Published
Attested copy of BIS
2 certificates of the same type
of meter submitted as sample
Attested certificates as
regards material used for
3
meter case, cover & terminal
block
4 Schedule - C
5 Schedule - B
Operating manual & Tamper
6
logic of the meter submitted
.

WBSEDCL
Page 32
Annexure -II

Pre-Qualification Conditions for HT Static Meters


Sl.
Particulars Remarks
No.
Bidders must have valid BIS certification for the offered
1 meter. If it has started to issue by appropriate Yes / No
authority.
2 Bidder preferably posses ISO 9001 certification Yes / No
Bidder should be manufacturers of static meters having
3 supplied Static LT, 11/33 KV H.T. Meters with memory
Yes / No
and LCD display as per IS 14697 & CBIP 325 to
Electricity Boards / Utilities in the past 3 years.
4 Bidders should have dust free, static protected
Yes / No
environment for manufacture, assembly and Testing.
5 Bidder should have automatic computerized test bench
Yes / No
for lot testing of meters.
6 Bidder has facilities of Oven for ageing test. Yes / No

Annexure -III

Sl. Component
Make / Origin
No. Function / Feature

1 Current Element

2 Measurement /
Computing chips
3 Memory chips

4 Display modules

5 Communication modules

6 Optical port

7 Power Supply

8 Electronic components

9 Mechanical parts

10 Battery

11 RTC/ Micro controller

WBSEDCL
Page 33
ANNEXURE - IV
Sl. LIST OF DOCUMENTS TO BE SUBMITTED
No. DURING SAMPLE SUBMISSION

1 Attested copy of type test reports from NABL


accredited laboratory as per new IS(If
Published)

2 Attested copy of BIS certificates of the same


type of meter submitted as sample

3 Attested certificates as regards material used for


meter case, cover & terminal block.

4 Annexure – II as per tender documents

5 Annexure – III as per tender documents

6 Operating manual & Tamper logic of the meter


submitted

WBSEDCL
Page 34
ANNEXURE - V

Component Specifications:

The meters shall be designed and manufactured using SMT (Surface Mount Technology)
components, except for power supply components, LCD etc., which are PTH type.

All the material and electronic power components used in the manufacture of the meter shall be of
highest quality and reputed makes so as to ensure higher reliability, longer life and sustained
accuracy.

Sl. Component
Requirement Make / origin
no. Function / Feature

Any make or origin


1. Current Element Current Transformer
conforming to IS-2705
Renasas, Analog Devices,
AMS, Cyrus Logic, Atmel,
Measurement / The Measurement / computing chips used in
SAMES, NEC, Texas
2. computing chips the meter should be with the Surface mount
Instruments, ST, Infinion,
type.
NEC, Phillips, Teridian,
Siemens Freescale, TI
The memory computing chips should not be Atmel, Sames, National
affected by the external parameters like Semiconductors, Renasas
Memory chips
3. sparking, high voltage spikes or electrostatic Microchip, Hitachi, Texas
discharges. Instruments, Phillips, Oki,
Avago, Teridian ,ST.
The display modules should be well protected
from the external UV radiations. The display
should be clearly visible over an angle of at
Haijing, Holtek, Bonafied
least a cone of 70o.The construction of the
Technologies, Advantek,
4. Display modules modules should be such that the displayed
Truly Semiconductor,
quantity should not disturbed with the life of
Hitachi, SONY, Tianma
display. The display should be TN type
industrial grade with extended temperature
range.
National Semiconductors,
Hitachi, Agilent, Avago,
Communication Communication modules should be compatible
5. Texas Instruments, HP,
modules for the RS 232 ports.
Philips, ST, ,Everlight,
Siemens, Ligitek, Fairchild
National Semiconductors,
Optical port should be used to transfer the
Hitachi, Texas
meter data to meter reading instrument. The
Optical port Instruments, Siemens,
6. mechanical construction of the port should be
Agilent, Philips, HP,
such to facilitate the data transfer easily.
Avago, Osram, Everlight,
Siemens

WBSEDCL
Page 35
The power supply should be with the
capabilities as per the relevant standards. The
Power Supply power supply unit of the meter should not be
7. SMPS Type
affected in case the maximum voltage of the
system appears to the terminals due to faults
or due to wrong connections.
Philips, Toshiba, Fairchild,
The active & passive components should be of Murata, Rohm, Siemens.
the surface mount type & are to be handled & National Semiconductors,
8. Electronic components
soldered by the state of art assembly processes. ATMEL, Texas
Instruments, Hitachi.
Ligitec, OKI, EPCOS
The internal electrical components should be
of electrolytic copper & should be protected
Mechanical parts from corrosion, rust etc.
9.
The other mechanical components should be
protected from rust, corrosion etc. by suitable
plating / painting methods.
Renata, Panasonic, Varta,
Tadiran, Sanyo, National,
Battery Lithium / Lithium-ion /NiMh with guaranteed
10. Tekcell, Duracell, Maxell,
life of 10 years
Elegance, Xeno Energy,
EVE
Philips, Dallas, Atmel,
Motorola, NEC, Renesas,
The accuracy of RTC shall be as per relevant Hitachi, Xicor, Texas
11. RTC / Micro controller
IEC / IS standards Instruments, NEC or OKI,
ST,Mitsubishi, Freescale
chip, Teridian

Components accepted in any previous tenders of WBSEDCL will be accepted

WBSEDCL
Page 36
IS 15959:2011

Table 27 Instantaneous Parameters for Class C Meters

(Clause E-2, E-3.2 and E-3.3)

OBIS Code Interface Class


Sl No Parameter
A.B.C.D.E.F No
(1) (2) (3) (4)
i) Real Time Clock – Date and Time 0.0.1.0.0.255 8
ii) Current - IR 1.0.31.7.0.255 3
iii) Current – IY 1.0.51.7.0.255 3
iv) Current – IB 1.0.71.7.0.255 3
v) Voltage – VRN 1.0.32.7.0.255 3
vi) Voltage – VYN 1.0.52.7.0.255 3
vii) Voltage – VBN 1.0.72.7.0.255 3
viii) Voltage – VRY 1.0.32.7.0.255 3
ix) Voltage – VBY 1.0.52.7.0.255 3
x) Signed Power Factor –R phase 1.0.33.7.0.255 3
xi) Signed Power Factor - Y phase 1.0.53.7.0.255 3
xii) Signed Power Factor - B phase 1.0.73.7.0.255 3
xiii) Three Phase Power Factor – PF 1.0.13.7.0.255 3
xiv) Frequency 1.0.14.7.0.255 3
xv) Apparent Power – KVA 1.0.9.7.0.255 3
xvi) Signed Active Power – kW (+ Forward; Reverse) 1.0.1.7.0.255 3
xvii) Signed Reactive Power – kvar (+ Lag; - Lead) 1.0.3.7.0.255 3
xviii) Number of Power-Failures 0.0.96.7.0.255 1
xix) Cumulative Power-Failure Duration 0.0.94.91.8.255 3
xx) Cumulative Tamper Count 0.0.94.91.0.255 1
xxi) Cumulative Billing Count 0.0.0.1.0.255 1
xxii) Cumulative Programming Count 0.0.96.2.0.255 1
xxiii) Billing Date 0.0.0.1.2.255 3
xxiv) Cumulative Energy kWh 1.0.1.8.0.255 3/2
xxv) Cumulative Energy kVARH Lag 1.0.5.8.0.255 3/2
xxvi) Cumulative Energy kVARH Lead 1.0.8.8.0.255 3/2
xxvii) Cumulative Energy kVAH 1.0.9.8.0.255 3/2
NOTES
1) The items at Sl No v), vi) and vii) are for 3Ф / 4W system of measurement with NEUTRAL
as reference point.
2) The items at Sl No viii) and ix) are for 3 Ф / 3W system of measurement with Y-PHASE as
reference point.
3) Signed Power factor – (+ indicates lag) and (- indicates lead).
4) The parameters at Sl No xviii) to xxii) hold cumulative values at that instant from the date
of manufacturing or installation of meter as the case may be.
5) The above list is identified for the purpose of communication to HOST or HHU.
6) The utilities may choose, based on needs, additional parameters for display purpose ONLY.
7) Item at Sl No xxi) refers to the Billing Period Counter
8) Item at Sl No xxiii) - Data type to be same as for attribute 2 of IC 8, Clock.

WBSEDCL
Page 37
IS 15959:2011

Table 28 : Block Load Survey Parameters for Class C Meters

(Clauses E-2, E-4.1 and 4.3)

Sl No Parameter OBIS Code Interface Class No /


Attribute
A.B.C.D.E.F

(1) (2) (3) (4)

i) Real Time Clock – Date and 0.0.1.0.0.255 8/2


Time
ii) Current - IR 1.0.31.27.0.255 3 / 2

iii) Current – IY 1.0.51.27.0.255 3 / 2

iv) Current – IB 1.0.71.27.0.255 3 / 2

v) Voltage – VRN 1.0.32.27.0.255 3 / 2

vi) Voltage – VYN 1.0.52.27.0.255 3 / 2

vii) Voltage – VBN 1.0.72.27.0.255 3 / 2

viii) Voltage – VRY 1.0.32.27.0.255 3 / 2

ix) Voltage – VBY 1.0.52.27.0.255 3 / 2

x) Block Energy – kWh 1.0.1.29.0.255 3/2

xi) Block Energy – kvarh – lag 1.0.5.29.0.255 3/2

xii) Block Energy – kvarh – lead 1.0.8.29.0.255 3/2

xiii) Block Energy – kVAh 1.0.9.29.0.255 3/2

NOTES:-
1) The parameters listed in this table are for load survey purpose and are
logged as per the block period time.
2) The parameters at Sl No ii) to ix) are the average values during the block
period time and stored at the end of that time block.
3) The parameters at Sl No x) to xiii) are the actual energy consumption
during that time block.
4) Capture objects for 3 Ф / 4W are items at Sl No i) to vii) and x) to xiii)
5) Capture objects for 3 Ф / 3W are items at Sl No i) to iv) and viii) to xiii)
6) Support for Selective access shall be as defined in Section 11.3

WBSEDCL
Page 38
IS 15959:2011

Table 29 : Billing Profile Parameters for Class C Meters

( Clauses E 5.1 and E 5.3 )

Interface
OBIS Code
Sl.No Parameter Class No /
A.B.C.D.E.F
Attribute
(1) (2) (3) (4)

i) Billing Date 0.0.0.1.2.255 3/2

ii) System Power Factor for Billing 1.0.13.0.0.255 3/2


Period

iii) Cumulative Energy – kWh 1.0.1.8.0.255 3/2

iv) Cumulative Energy – kWh – TZ1 1.0.1.8.1.255 3/2

v) Cumulative Energy – kWh – TZ2 1.0.1.8.2.255 3/2

vi) Cumulative Energy – kWh – TZ3 1.0.1.8.3.255 3/2

vii) Cumulative Energy – kWh – TZ4 1.0.1.8.4.255 3/2

viii) Cumulative Energy – kWh – TZ5 1.0.1.8.5.255 3/2

ix) Cumulative Energy – kWh – TZ6 1.0.1.8.6.255 3/2

x) Cumulative Energy – kWh – TZ7 1.0.1.8.7.255 3/2

xi) Cumulative Energy – kWh – TZ8 1.0.1.8.8.255 3/2

xii) Cumulative Energy – kvarh – Lag 1.0.5.8.0.255 3/2

xiii) Cumulative Energy – kvarh – Lead 1.0.8.8.0.255 3/2

xiv) Cumulative Energy – kVAh 1.0.9.8.0.255 3/2

xv) Cumulative Energy – kVAh – TZ1 1.0.9.8.1.255 3/2

xvi) Cumulative Energy – kVAh – TZ2 1.0.9.8.2.255 3/2

xvii) Cumulative Energy – kVAh – TZ3 1.0.9.8.3.255 3/2

xviii) Cumulative Energy – kVAh – TZ4 1.0.9.8.4.255 3/2

xix) Cumulative Energy – kVAh – TZ5 1.0.9.8.5.255 3/2

xx) Cumulative Energy – kVAh – TZ6 1.0.9.8.6.255 3/2

xxi) Cumulative Energy – kVAh – TZ7 1.0.9.8.7.255 3/2

OBIS Code Interface


Sl.No Parameter
A.B.C.D.E.F Class No /

WBSEDCL
Page 39
Attribute

xxii) MD – kW 1.0.1.6.0.255 4 / 2 ,5

xxiii) MD – kW – TZ1 1.0.1.6.1.255 4 / 2 ,5

xxiv) MD – kW – TZ2 1.0.1.6.2.255 4 / 2 ,5

xxv) MD – kW – TZ3 1.0.1.6.3.255 4 / 2 ,5

xxvi) MD – kW – TZ4 1.0.1.6.4.255 4 / 2 ,5

xxvii) MD – kW – TZ5 1.0.1.6.5.255 4 / 2 ,5

xxviii) MD – kW – TZ6 1.0.1.6.6.255 4 / 2 ,5

xxix) MD – kW – TZ7 1.0.1.6.7.255 4 / 2 ,5

xxx) MD – kW – TZ8 1.0.1.6.8.255 4 / 2 ,5

xxxi) MD – kVA 1.0.9.6.0.255 4 / 2 ,5

xxxii) MD – kVA – TZ1 1.0.9.6.1.255 4 / 2 ,5

xxxiii) MD – kVA – TZ2 1.0.9.6.2.255 4 / 2 ,5

xxxiv) MD – kVA – TZ3 1.0.9.6.3.255 4 / 2 ,5

xxxv) MD – kVA – TZ4 1.0.9.6.4.255 4 / 2 ,5

xxxvi) MD – kVA – TZ5 1.0.9.6.5.255 4 / 2 ,5

xxxvii) MD – kVA – TZ6 1.0.9.6.6.255 4 / 2 ,5

xxxviii) MD – kVA – TZ7 1.0.9.6.7.255 4 / 2 ,5

xxxix) MD – kVA – TZ8 1.0.9.6.8.255 4 / 2 ,5

NOTES

1) The data are stored up to 6 billing cycles. The Billing profile is modeled as Profile generic (IC: = 7) object with
OBIS Code 1.0.98.1.0.255. The capture objects of this load profile are as per Table-29. The capture object
values will be copied into buffer of this object either automatically or asynchronously. The capture period is
set to zero, billing action is controlled by billing dates as provided in 10 and table 31.
2) Support for Selective access shall be as defined in Section 11.3
3) The current cycle billing parameters shall be readable as the values of the latest billing period, on demand.
This shall be in addition to the last 6 billing period data which shall be available in the Profile buffer as the
last 6 entries in the buffer
4) The captured attributes in case of Interface Class 4 (Extended register) used for MD values will be attributes
2 and 5 (Value and Timestamp)

WBSEDCL
Page 40
Table 30: Name Plate Details Parameters

(Clause F-1)

Sl No Parameter OBIS Code Interface Class

A.B.C.D.E.F

(1) (2) (3) (4)

i) Meter Serial Number 0.0.96.1.0.255 1 (Data)

ii) Manufacturer name 0.0.96.1.1.255 1

iii) Firmware Version for meter 1.0.0.2.0.255 1

iv) Meter type (3P-3W / 3P-4W) 0.0.94.91.9.255 1

v) Internal CT ratio 1.0.0.4.2.255 1

vi) Internal PT ratio 1.0.0.4.3.255 1

vii) Meter year of manufacture 0.0.96.1.4.255 1

NOTE For item Sl No iv), a value of “0” indicates 3P-3W; a value of “1” indicates 3P-4W

Table 31 Programmable Parameters

(Clause F-2)

Sl No Parameter OBIS Code Interface


A.B.C.D.E.F Class
(1) (2) (3) (4)
i) Real Time Clock – Date and Time 0.0.1.0.0.255 8 (Clock)
ii) Demand Integration Period 1.0.0.8.0.255 1 (Data)
iii) Profile Capture Period 1.0.0.8.4.255 1
iv) Single-action Schedule for Billing 0.0.15.0.0.255 22
Dates
v) Activity Calendar for Time Zones 0.0.13.0.0.255 20
etc.
NOTES

1) The parameters are programmable by the utility engineers with required access
rights.
2) Unit for Demand Integration Period and profile capture period is in “seconds”.
3) Programming of any of the parameters shall increment the “Cumulative
programming count” value.

WBSEDCL
Page 41
Table 32 Indian Event Reference Table – Voltage Related

(Clause G-1 & G-1.1)

Sl No Event ID Descriptions
(1) (2) (3)
i) 1 R-Phase – PT link Missing (Missing Potential) – Occurrence
ii) 2 R-Phase – PT link Missing (Missing Potential) – Restoration
iii) 3 Y-Phase – PT link Missing (Missing Potential) – Occurrence
iv) 4 Y-Phase – PT link Missing (Missing Potential) – Restoration
v) 5 B-Phase – PT link Missing (Missing Potential) – Occurrence
vi) 6 B-Phase – PT link Missing (Missing Potential) – Restoration
vii) 7 Over Voltage in any Phase - Occurrence
viii) 8 Over Voltage in any Phase - Restoration
ix) 9 Low Voltage in any Phase - Occurrence
x) 10 Low Voltage in any Phase - Restoration
xi) 11 Voltage Unbalance - Occurrence
xii) 12 Voltage Unbalance - Restoration

Table 33 Indian Event Reference Table – Current Related


(Clause G-1 & G-1.1)
Sl No Event ID Descriptions

(1) (2) (3)


i) 51 Phase – R CT reverse – Occurrence
ii) 52 Phase – R CT reverse – Restoration
iii) 53 Phase – Y CT reverse – Occurrence
iv) 54 Phase – Y CT reverse – Restoration
v) 55 Phase – B CT reverse – Occurrence
vi) 56 Phase – B CT reverse – Restoration
vii) 57 Phase – R CT Open - Occurrence
viii) 58 Phase – R CT Open - Restoration
ix) 59 Phase – Y CT Open - Occurrence
x) 60 Phase – Y CT Open - Restoration
xi) 61 Phase – B CT Open - Occurrence
xii) 62 Phase – B CT Open - Restoration
xiii) 63 Current Unbalance - Occurrence
xiv) 64 Current Unbalance - Restoration
xv) 65 CT Bypass – Occurrence
xvi) 66 CT Bypass – Restoration
xvii) 67 Over Current in any Phase – Occurrence
xviii) 68 Over Current in any Phase – Restoration
Table 34 Indian Event Reference Table – Power Related

WBSEDCL
Page 42
(Clause G-1 & G-1.1)

Sl No Event ID Descriptions

101 Power failure (3 phase) – Occurrence


102 Power failure (3 phase) – Restoration

Table 35 Indian Event Reference Table – Transaction Related

(Clause G-1 & G-1.1)

Sl No Event ID Descriptions

(1)
i) 151 Real Time Clock – Date and Time
ii) 152 Demand Integration Period
iii) 153 Profile Capture Period
iv) 154 Single-action Schedule for Billing Dates
v) 155 Activity Calendar for Time Zones etc.

Table 36 Indian Event Reference Table – Others


(Clause G-1 & G-1.1)
Sl No Event ID Descriptions

(1)
i) 201 Influence of Permanent Magnet or AC/ DC
Electromagnet - Occurrence
ii) 202 Influence of Permanent Magnet or AC/ DC
Electromagnet - Restoration
iii) 203 Neutral Disturbance - HF & DC - Occurrence
iv) 204 Neutral Disturbance - HF & DC - Restoration
v) 205 Very Low PF - Occurrence
vi) 206 Very Low PF - Restoration

Table 37 Indian Event Reference Table – Non Roll Over Events


(Clause G-1 & G-1.1)
Sl.No. Event ID Descriptions
251 Meter Cover Opening – Occurrence

Table 38 Indian Event Reference Table – Control Events

(Clause G-1.1)

Sl No Event ID Descriptions

(1) (2) (3)


301 Meter disconnected
302 Meter connected

WBSEDCL
Page 43
Table 39 Capture Parameters for Events

(Clauses B-6.4, B 6.5 and G-1)

Sl No Parameter A B C D E F IC

(1) (2) (3) (4) (5) (6) (7) (8) (9)


i) Date and Time of event 0 0 1 0 0 255 8 (Clock)
ii) Event Code 0 0 96 11 0 255 1 (Data)
iii) Current - IR 1 0 31 7 0 255 3 (Register)
iv) Current - IY 1 0 51 7 0 255 3 (Register)
v) Current – IB 1 0 71 7 0 255 3 (Register)
vi) Voltage VRN (3 Ф / 4W) 1 0 32 7 0 255 3 (Register)
vii) Voltage VYN (3 Ф /4W) 1 0 52 7 0 255 3 (Register)
viii) Voltage VBN (3 Ф /4W) 1 0 72 7 0 255 3 (Register)
ix) Voltage VRY (3 Ф / 3W) 1 0 32 7 0 255 3 (Register)
x) Voltage VYB (3 Ф /3W) 1 0 52 7 0 255 3 (Register)
xi) Power Factor – R phase 1 0 33 7 0 255 3 (Register)
xii) Power Factor – Y phase 1 0 53 7 0 255 3 (Register)
xiii) Power Factor – B phase 1 0 73 7 0 255 3 (Register)
xiv) Cumulative Energy – kWh 1 0 1 8 0 255 3 (Register)

WBSEDCL
Page 44
Schedule I
33 KV Meter 3Phase 4 Wire

OCC
Reset Time
TAMPERS Occurrence. Condition Reset. Conditions Time
(min)
(min)
Vx< 15% Vref Vx > 40% Vref
Any other phase voltage > Any other phase
Missing
1 70% of Vref voltage > 70% of Vref 5
Potential
Current Ignored Current Ignored
Missing potential tamper detection will be phase wise
V3x> 70% Vref V3x > 70% Vref
Voltage Vmax-Vmin<10%
2 Vmax-Vmin> 10% Vref 5
Unbalance Vref
Current Ignored Current Ignored
Low Vx < 70% Vref V3x > 71% Vref
3 5
Voltage Current Ignored Current Ignored
Power If power goes off for more
4 Power Restores 5 Immediate
Failure than the persistence time
Residual Current<
Residual Current >20% Ib
20% Ib
5 CT Open Ix< 2% Ib Ix Ignored 5
Average Current >
Average line Current :Ignored
10% of Ib
Residual Current
Residual Current >20% Ib
<20% Ib
6 CT Bypass Ix >2% Ib Ix Ignored 5
Average Current >
Average line Current :Ignored
10% Ib
Residual Current <
Residual Current < 20% Ib
20% Ib

Imax- Imin> 30% 0f Imax for Imax- Imin <29% 0f


Current that period Imax for that period
7 5
Unbalance
Average Line Current
Average Line Current> 5% Ib
> 10% Ib
Calculated In> 5% of
Calculated In> 5% of Ib
Ib
Ix > 10 % Ib Ix> 10 % Ib

CT Direction : Negative Direction: Positive


8 Reversal 5
Net Power Factor> 0.3 Net Power Factor> 0.3

CT Reversal detection will be phase wise

WBSEDCL
Page 45
33 KV Meter 3Phase 4 Wire

OCC Reset
TAMPERS Occurrence. Condition Reset. Conditions Time Time
(min) (min)
When Voltage and
When association of current
current association is
phase with voltage phase is
Invalid proper.
mismatched.
9 Phase For example: For 5
For Example: For Voltage
Association voltage phase R-Y-B
phase R-Y-B , Current phase
current phase is also
association is Y-B-R
R-Y-B.
Whenever the meter functionality gets affected on
account of magnetic field, meter log it as an event and
10 Magnet 30 sec 30 sec
recording starts on Imax or it remains immune. Same
shall be logged with date and time stamp.

Cover On removal of meter cover the meter will log cover Immediate. No
11
Open open event along with date and time. Restoration

V3X= Voltage in All Phases


Vx= Voltage In Any Phase
I3X= Current in All Phases
IX= Current in any phase

WBSEDCL
Page 46
11 KV Meter 3 Phase 3 Wire
OCC
Reset Time
TAMPERS Occurrence. Condition Reset. Conditions Time
(min)
(min)
Vx< 15% Vref Vx> 40% Vref
Any other phase voltage Any other phase voltage > 70% of
Missing
1 >70% of Vref Vref 5
Potential
Current Ignored Current Ignored
Missing potential tamper detection will be phase wise
V3x> 70% Vref V3x> 70% Vref
Voltage
2 Vmax-Vmin> 10% Vref Vmax-Vmin<10% Vref 5
Unbalance
Current Ignored Current Ignored
Low Vx< 70% Vref V3x> 71% Vref
3 5
Voltage Current Ignored Current Ignored
Power If power goes off for more
4 Power Restores 5 Immediate
Failure than the persistence time

Residual Current >20% Ib Residual Current< 20% Ib

5 CT Open Ix< 2% Ib Ix Ignored 5

Average line Current :Ignored Average Current > 10% of Ib

Residual Current >20% Ib Residual Current <20% Ib

6 CT Bypass Ix>2% Ib Ix Ignored 5

Average line Current :Ignored Average Current > 10% Ib

Residual Current > 20% Ib Residual Current < 20% Ib

Imax- Imin> 30% 0f Imax for Imax- Imin<29% 0f Imax for that
Current that period period
7 5
Unbalance
Average Line Current> 5% Ib Average Line Current> 10% Ib

Calculated In> 5% of Ib Calculated In> 5% of Ib

Ix> 10 % Ib Ix > 10 % Ib

CT Direction : Negative Direction: Positive


8 Reversal 5
Net Power Factor> 0.3 Net Power Factor> 0.3

CT Reversal detection will be phase wise

WBSEDCL
Page 47
11 KV Meter 3 Phase 3 Wire
OCC Reset
TAMPERS Occurrence. Condition Reset. Conditions Time Time
(min) (min)
Whenever the meter functionality gets affected on account of
magnetic field, meter log it as an event and recording starts on
9 Magnet 30 sec 30 sec
Imax or it remains immune. Same shall be logged with date and
time stamp.

Cover On removal of meter cover the meter will log cover open event Immediate. No
10
Open along with date and time. Restoration

V3X= Voltage in All Phases


Vx= Voltage In Any Phase
I3X= Current in All Phases
IX= Current in any phase

WBSEDCL
Page 48
240 V LT CT Meter 3 Phase 4 Wire
OCC REST.
REST.
TAMPERS OCC. Condition TIME TIME
CONDITIONS
(MIN) (MIN)
Vx< 30% Vref Vx> 40% Vref

Any other phase voltage > Any other phase


Missing 70% of Vref voltage > 70% of Vref
1 5
Potential
Current Ignored Current Ignored
Missing potential tamper detection will be phase
wise

V3x> 70% Vref V3x> 70% Vref


Voltage
2 Vmax-Vmin < 29% 5
Unbalance Vmax-Vmin > 30% Vref
Vref
Current Ignored Current Ignored
Low Vx< 70% Vref V3x> 71% Vref
3 5
Voltage Current Ignored Current Ignored

Power If power goes off for more


4 Power Restores 5 Immediate
Failure than the persistance time

Residual Current<20%
Residual Current >20% Ib
CT Open Ib
5 (Phase Ix< 2% Ib Ix Ignored 5
Wise) Average line Current Average Current >
:Ignored 10% of Ib
Residual Current
Residual Current >20% Ib
<20% Ib
6 CT Bypass Ix>2% Ib Ix Ignored 5
Average line Current Average Current >
:Ignored 10% Ib
Residual Current <
Residual Current < 20% Ib
20% Ib

Imax- Imin> 30% 0f Imax Imax- Imin<29% 0f


Current for that period Imax for that period
7 5
Unbalance
Average Phase Current> Average Phase
10% Ib Current> 10% Ib
Neutral Current
In> 2% of Ib
ignored
Ix> 10 % Ib Ix> 10 % Ib

CT Direction : Negative Direction: Positive


8 Reversal 5
Net Power Factor> 0.3 Net Power Factor> 0.3

CT Reversal detection will be phase wise

WBSEDCL
Page 49
240 V LTCT Meter 3Phase 4 Wire

OCC REST.
REST.
TAMPERS OCC. Condition TIME TIME
CONDITIONS
(MIN) (MIN)
When Voltage and
When association of
current association is
current phase with voltage
Invalid proper.
phase is mismatched.
9 Phase For example: For 5
For Example: For Voltage
Association voltage phase R-Y-B
phase R-Y-B ,Current phase
current phase is also
association is Y-B-R
R-Y-B.
Whenever the meter functionality gets affected on
account of magnetic field, meter log it as an event and
10 Magnet 30 sec 30 sec
recording starts on Imax or it remains immune. Same
shall be logged with date and time stamp.

Cover On removal of meter cover the meter will log cover Immediate. No
11
Open open event along with date and time. Restoration

Neutral
12 Bidders' Logic Bidders' Logic Bidders' Choice
Disturbance
 In Case of Neutral Disturbance Tamper the meter may remain Immune and maintain its class of
accuracy.
 If not immune from neutral disturbance then the meter should record energy with positive error.
V3X= Voltage in All Phases
Vx= Voltage In Any Phase
I3X= Current in All Phases
IX= Current in any phase