The document provides a list of materials needed to replace the feed tank at the Sei Intan Water Feed Pump Station. It includes 52 items such as steel plates, pipes, valves, welding materials, and paint supplies. The materials will be used for the tank body, floor, cover, supports, inlet/outlet piping, level instrumentation, and coating. Concrete and rebar are also included for the foundation.
The document provides a list of materials needed to replace the feed tank at the Sei Intan Water Feed Pump Station. It includes 52 items such as steel plates, pipes, valves, welding materials, and paint supplies. The materials will be used for the tank body, floor, cover, supports, inlet/outlet piping, level instrumentation, and coating. Concrete and rebar are also included for the foundation.
The document provides a list of materials needed to replace the feed tank at the Sei Intan Water Feed Pump Station. It includes 52 items such as steel plates, pipes, valves, welding materials, and paint supplies. The materials will be used for the tank body, floor, cover, supports, inlet/outlet piping, level instrumentation, and coating. Concrete and rebar are also included for the foundation.
JUMLAH NO URAIAN BAHAN SAT FISIK 1 Plate kapal 5' x 20 ' tebal 8 mm u/body 12 lbr 2 Plate kapal 5' x 20' tebal 18 mm u/ lantai ( base plate tangki ) 2 lbr 3 Plate kapal 5' x 20' tebal 5 mm u/ tutup atas tangki 2 lbr 4 Besi siku ukuran 75 x75 x 7 mm @6 mtr u/ ring body atas dan body bawah 4 btg 5 Besi siku ukuran 65 x 65 x 6 mm @6 mtr u/ tulangan tutup atas & bangku steam coil 6 btg 6 Pipa steam dia 4" SCH 40 @6 mtr u/ over flow 2 btg 7 Elbow 4 inchi u/ over flow 2 pcs 8 Pipa steam dia 3" SCH 80 @6 mtr u/ pipa inlet 4 btg 9 Elbow steam dia 3" 90 deg SCH 80 7 bh 10 Flange dia 3" 4 bh 11 Ball valve dia 4" u/ blowdown 1 bh 12 Gate valve dia 3" u/ kran outlet 1 bh 13 Kabel sling baja dia. 5 mm u/ pembaca level air 12 mtr 14 Pipa steam dia 3" SCH 80 @6 mtr u/ inlet dari pompa cation menuju ke feed tank 4 btg 15 Pelampung stainless steel u/ adjust level air 1 bh 16 Pipa stainless steel dia 2" SCH 40 @6 mtr u/ steam coil 8 btg 17 Elbow stainless steel dia 2 inch u/ steam coil 15 bh 18 Elbow 90 deg material stainless steel dia 2 inchi 30 bh 19 Baut klem material stainless steel ukuran 1/2 inchi 25 bh 20 Baut + mur + ring ukuran 5/8 inchi panjang 2 1/2 inchi 40 bh 21 Gate valve dia 2 inchi 1 bh 22 Flange steam dia 2 inchi 10 bh 23 Check valve dia 2 inchi 1 bh 24 Elbow steam dia 2 inchi 2 bh 25 Besi siku 50 x 50 x 5 mm @6 mtr u/ rail level air 4 btg 26 Besi siku 75 x 75 x 6 mm @6 mtr u/ atap 8 btg 27 Besi beton ulir dia 16 mm @12 mtr u/ besi induk tulangan pondasi 53 btg 28 Besi beton polos dia 12 mm @12 mtr u/ besi begol 48 btg 29 Wiremesh M8 8 lbr 30 Sika latex 5 kg 31 Kayu 5 x 10 cm somel @4 mtr 36 btg 32 Triplek tebal 8 mm 15 lbr 33 Paku panjang 3 inchi 5 kg 34 Paku panjang 1 inchi 5 kg 35 Kawat ikat 10 kg 36 Ready mix K225 Split 34 cubic 37 Baut + mur ukuran 5/8 inchi panjang 3 inchi u/ kran 16 pcs 38 Baut + mur + ring ukuran 1/2 inchi panjang 1 1/2 inchi u/ manhole 16 pcs 39 Kran type butterfly dia 3 inchi 2 bh 40 Flange stainless steel dia 3 inchi 10 bh 41 Paking klingerit @120 x 120 cm 1 lbr 42 Tali asbes dia 5/8 inchi 10 kg Bahan pendukung 45 Kawat las LB 52 @diameter elektroda 3.2 mm Kobe steel 150 kg 46 Kawat las RB 26 @diameter elektroda 3.2 mm Familiarc 30 kg 47 Oxygen @25 kg 30 tube 48 Elpiji @50 kg 2 tube 49 Batu gerinda asah dia 4 inchi 15 bh 50 Batu gerinda asah dia 7 inchi 10 bh 51 Batu gerinda potong dia 4 inchi 8 bh 52 Cat manie 30 kg 53 Cat minyak warna biru 50 kg 54 Thiner 20 klg 55 Kuas roll 5 bh 56 Kuas biasa ukuran 4 inchi 8 bh