CONCRETE
PLINDING
FOOTING
MAKKAH EXPRESSWA
P02 314614.366 2873489.482
23693 7597
P03 314589.761 2873482.416
818 1576 1576 1576 1576 1576 1576 1576 1576 1576 1576 1576 1576 1576 1576 818 2873489.144
P04 314587.829
431 431
50mm THK. ASPHALT
EL. 743.828
EL. 743.490
TRANSVERSE CONCRETE
BUFFER ( TYP.)
PIER "P1" RIGHT CARRIAGEWAY
SLOPE
STRUCTURE POINTS EASTING NORTHING
F01 314612.367 2873496.087
FOOTING
EL. 741.597
EL. 741.362 F02 314614.244 2873489.551
F03 314589.830 2873482.540
1238
1000
119
1600
602 602
600
PIER "P1" RIGHT CARRIAGEWAY
1811 5018 5018 5018 5018 1811
STRUCTURE POINTS EASTING NORTHING
(TYP.)
6030
C01 314610.744 2873492.083
CENTER OF
COLUMNS
C02 314605.921 2873490.698
N.G.L. 734.401 N.G.L. 734.485
C03 314601.098 2873489.313
(TYP.)
722
C04 314596.275 2873487.928
1600
ELEV. 731.401
PIER "P1" RIGHT CARRIAGEWAY
100mm THICK STRUCTURE POINTS EASTING NORTHING
LEAN CONCRETE
25400
P01 314611.566 2873493.568
P02 314612.229 2873491.261
- SECTION AT PIER "P1" P03 314609.922 2873490.599
SCALE: 1:150
P04 314609.259 2873492.906
P05 314606.743 2873492.183
℄
OF BRIDGE & P07 314605.099 2873489.214
"
P17 P13 P09 P01
38
1200
1'
C05 C04 C03 C02 C01
°1
85
P1 P13 314597.097 2873489.413
2400
6800
1600
1200
TITLE :- INTERCHANGE BRIDGE NO. 1 -ALQASSIM- CONTRACTOR :- -: ﺍﻟﻤﻘـــــ ﺎﻭﻝ CONSULTANT :- -: ﺎﺭﻱ ﺍﻹﺳﺘﺸ PROJECT :- -: ﺍﻟﻤﺸــ ﺮﻭﻉ KINGDOM OF SAUDIA ARABIA
MAKKAH ALMUKARRAMAH EXPRESSWAY ﺍﻟﻤﻤﻠﻜ ﺔ ﺍﻟﻌﺮﺑﻴ ﺔ ﺍﻟﺴ ﻌﻮﺩﻳﺔ
MINESTRY OF TRANSPORT
ﺷﺭﻛــ ﺔ ﺍﻟﻔـــــــ ﻼﺡ ﻟﻠﻣﻘـــــ ﺎﻭﻻﺕ ﻣﻛ ﺔ ﺍﻟﻣﻛﺭﻣ ﺔ ﺍﻟﻣﺑﺎﺷ ﺭ/ ﻁ ﺭﻳﻖ ﺍﻟﻘﺻ ﻳﻡ ﻭﺯﺍﺭﺓ ﺍﻟﻨﻘـــ ﻞ
PIER "P1" LEVEL & COORDINATES SHEET (3-3)
ﺍﻟﻣﺩﻳﻧ ﺔ ﺍﻟﻣﻧ ﻭﺭﺓ- ﻣﻛ ﺔ ﺍﻟﻣﻛﺭﻣ ﺔ ﻣ ﻊ ﻁ ﺭﻳﻖ ﺍﻟﻘﺻ ﻳﻡ- ﺗﻘ ﺎﻁﻊ ﻁ ﺭﻳﻖ ﺍﻟﻘﺻ ﻳﻡ GENERAL STUDIES AND DESIGN DEPARTMENT
RIGHT CARRIAGE WAY ONLY 26/01/2022 ﺷﺭﻛــ ﺔ ﺩﺍﺭ ﺍﻟﺭﻳ ﺎﺽ ﻟﻺﺳﺗﺷــ ﺎﺭﺍﺕ ﺍﻟﻬﻧﺩﺳـــ ﻳﺔ 002+041.703 -: ( ﻓ ﻲ ﺍﻟﻣﺣﻁ ﺔ ﺭﻗ ﻡ1) ﺗﻘ ﺎﻁﻊ ﺭﻗ ﻡ ﺇﺩﺍﺭﺓ ﺍﻟﺪﺭﺍﺳـــ ﺎﺕ ﻭﺍﻟﺘﺼـ ﺎﻣﻴﻢ