DHLABU ST
CLEARANCE DISTANCES SCALE 1:250 MALL
INTERSECTION APPROACHES North - south direction ENTRANC
E / EXIT
22,8m STRAIGHT
NORTH
DIRECTORATE PLANNING & ECONOMIC DEVELOPMENT
DIREKTORAAT BEPLANNING & EKONOMIESE ONTWIKKELING
LEFAPHA LA NTSHETSOPELE YA MORUO LE MORALO
9m
DECLARATION BY THE DESIGNER 1,26
TRAFFIC CONTROL BOX.
EXISTING CABLE SLEEVES
BESTAANDE PADRAND / EXISTING ROAD EDGE
VERWYDER RANDSTEEN / REMOVE KERBING
It is hereby certified, in terms of Section 287A of the National Road PC2
TO BE USED NUWE RANDSTEEN / NEW KERBING
Traffic Regulations that: EINDE VAN KONSTRUKSIE / END OF CONSTRUCTION
1. The intersection qualifies for signalisation in terms of Warrant 1 0,9
21,6m STRAIGHT
(Section 2.4.2 of Volume 3 of the South African Road Traffic Signs 4 PADMERKE / ROAD MARKINGS
Manual - April 2003.) PC1 PC4
WM6.1 WM6.2
2. The presence of underground civil and electrical services have PC5
WM6.3 GM31
been taken into consideration in the traffic signal design and the
West - East direction
0,95
DHLABU STREET location of traffic signal poles and the traffic signal controller. GM32 GM33
141
0,95
0,95
3. The number, type, location and visibility of traffic signal faces RTM 4
CLASS 4 MINOR COLLECTOR comply with the requirements of Volume 3 of the South African
TOEGEE / YIELD VOETGANGERS
PEDESTRIANS
SPEED 40 km/h 16m Road Traffic Signs Manual. RM8.1 WM7.1
SLOPE -2,63% INCLINE TO INTERSECTION 4. The traffic signal design and traffic signal settings comply with
SLOPE 0,81% DECLINE TO INTERSECTION
RM8.2 WM7.2
the specifications and minimum safety standards stated in Vol. 3 PC12 PC6 RM8.3 WM7.3
EAST of the South African Road Traffic Signs Manual. RM8.4 WM7.4
5. The pedestrian clearance times have been calculated 0,96
24,2m with a wheelchair speed of 0,8m/s 0,95 RM8.5 WM7.5
CLASS 3 ACTIVITY ROAD
6. All poles carrying pedestrian signal heads are to be with RM8.6 WM7.6
MOSHOESHOE STREET
0,96
SPEED 60KM/H
0,98
0,91
0,96
QUALIFICATION: PR. ENG; (TRAFFIC) G.D.E (TRANSPORTATION) CONTINUITY LINE WM 2.3 KONTINUïTEITSTREEP WM 2.3
1,1
PC9 PC8 DIVIDING LINE WM 3 SKEISTREEP WM 3
ECSA REGISTRATION NO.: 980355
SOUTH
1m min
GM 1.2 LANE LINE WHITE 1500 3000 100
GM 1.3 LANE LINE WHITE 1500 1500 100
0,5 m GM 2 GUIDE LINE WHITE 500 1500 100
WM 3 DIVIDING LINE WHITE 3000 6000 100
20°
min WM 2.2
WM 2.3
CONTINUITY LINE
CONTINUITY LINE
WHITE 1500 3000 200
WHITE 1500 1500 200
1,75
6,2m max
max
2,1m min
**
3m max
NAME: _____________
A.BRISLIN YIELD SYMBOLS SADC-RTSM VOL 4 PAGE 12.4.15
*
STOP SYMBOL SADC-RTSM VOL 4 PAGE 12.5.1; 12.5.3;
0,91 m PR.NO: 980355
_____________ 12.5.4
min 19/01/2021
_____________ PAINTED ISLANDS SADC-RTSM VOL 4 PAGE 12.2.3
DATE:
RAISED PEDESTRIANSADC-RTSM VOL 4 PAGE 12.2.13, AND
CROSSING DRAWING NO. MA/A/002
* SYMBOL AND LETTER HEIGHTS: 4000mm
SIGNATURE: ** YIELD SYMBOL HEIGHT: 4000mm
Typical traffic signal layout ................................ *** SADC-RTSM: SOUTHERN AFRICAN DEVELOPMENT
COMMUNITY: ROAD TRAFFIC SIGNS MANUAL
DHLABU ST
U-DRAAI VERBODE NO U-TURN
296 87 C
PHASE 3 GREEN WAARSKUWING WARNING
AMBER ENTRAM ALL PADTEKEN (W413) ROAD SIGN (W413)
1 2 3 4 RED NCE / EXI W413
CYCLE LENGTH: 90s
RED S1 R2.1
R2.1
129 115 DURATION (s) DURATION (s) DURATION (s) DURATION (s) PEDES N-S GREEN 48 VERKEERSDATA/TRAFFIC DATA
B B 55 25 0 0 (PHASE 1) FRM 7 S1 DIENSPEIL F LEVEL OF SERVICE
S1
95 PERSENTIEL 95 PERCENTILE
RED 5 S11 S11 TOULENGTE (m) 15 QUEUE LENGTH (m)
S1 VERKEERSVOLUME 1852 TRAFFIC VOLUME
30s 60s 90s 120s
STAGE 1 STAGE 2 STAGE 3 STAGE 4 VERKEERSLIGTE / TRAFFIC LIGHTS
R103
PHASE 1 GREEN 60
R103
OPERATIONAL MODE: FIXED TIME PLAN 2
A B
81 79 AMBER 3 S1 S1 OORHOOFS OVERHEAD
956 195
RED 2 NUWE VERKEERSLIGPAAL NEW TRAFFIC LIGHT POST
PHASE 2 GREEN 20
AFTERNOON PEAK PERIOD (2)
S1
BESTAANDE ASPEK EXISTING ASPECT
114 35 D
PHASE 3 GREEN VOETGANGERASPEK PEDESTRIAN ASPECT
AMBER
1 2 3 4 RED MOSHOESHOE ST TREK GAT DRAW BOX
PHASE 4 GREEN KABELBUIS ELECTRICAL CABLE DUCT
CYCLE LENGTH: 90s
785 35 RED 5
62 48 DURATION (s) DURATION (s) DURATION (s) DURATION (s) PEDES N-S GREEN 53
A B 60 20 0 0 (PHASE 1) FRM
RED
7
5
S5 S6 S7 S8 S9
M10
STAGE 1 STAGE 2 STAGE 3 STAGE 4 PHASE 1 GREEN 30
CHIEF MOROKA ST
A B
AMBER 3
T
AS
37 36
RED 2 S10R S10L S11 S12
IS
524 94
PHASE 2 GREEN 20
PH
INTERGREEN: AMBER 3s RED 2s
AMBER 3
MA
RED 2 MOS
HOE
PHASE 3 GREEN SHO ST3 ST1 ST2 ST5 ST4
OFF PEAK PERIOD (3)
124 20 C E ST
AMBER
1 2 D 3 4 RED
CYCLE LENGTH: 60s
41 37 DURATION (s)
30
DURATION (s)
20
DURATION (s)
0
DURATION (s)
0
PEDES N-S GREEN
(PHASE 1) FRM
23
7
LOCALITY PLAN 3. 0,8m/s WAS USED TO DETERMINE THE PEDESTRIAN
CLEARANCE, AND THE PEDESTRIAN CROSSINGS SHOULD
HAVE AUDIBLE PUSH BUTTON CASINGS WITH 2 DIFFERENT
A B
RED 5 NTS FREQUENCIES OF OUTPUT FOR 2 DIFFERENT DIRECTIONS.
ONDERWERP SUBJECT AFDELING DIVISION OPGEMEET GETEKEN SKAAL PROJECT MANAGER KODE CODE TEKENING Nr. DRAWING Nr. UIT./ISS.
MANGAUNG METRO MUNICIPALITY SURVEYED DRAWN
R.KRUGER
SCALE F.FOUCH ....................
O. VAN ROOYEN AS SHOWN ON A1 127-CIV-BRT-TD-203
OFFICE OF THE
PROPOSED SIGNALIZATION AND UPGRADING CITY MANAGER ONTWERP NAGESIEN DATUM GLADAFRICA - MIDRAND
A
M.NONDALA
ALONG MOSHOESHOE STREET 13/01/2021 A - ISSUED FOR APPROVAL DESIGNED
A.BRISLIN CHECKED A.BRISLIN
DATE
12/10/2020
ED: INFRASTRUCTURE SIGNAL PLAN OF
WYSIGINGS PAR./SIG. PROJECT DIRECTOR TEKENKANTOOR/DRAWING OFFICE MOSHOESHOE ST AND DHLABU ST
DATE