1776 Work Notes  05.08.2022

MONDAY
 = 1st Priority  = 2nd Priority

We have the prop dock for the AM

Unit Priority Task Shop Stage Notes Done


Install the SL Barrel Tower to  Includes Trucking, we have the prop 
Barrel  1 X X
completion dock for the one load top of day
Towers
Pull all related spike/gaff tape after X
1 Place the built 3 stacks US X X Could use the motors as needed
US Barrel 
Add the 4th and 5th row if we have 
Wall X X No worries if not though
the completed barrels for it
The SL seam needs all magnets. SR 
seam is in progress. The spacing is 1'‐
3 Continue sewing on magnets X 6" from the top, then every 1'‐6". (All 
US Drop supplies in the cardboard box in the 
hardware road case)
Sew on small muslin pull tabs for crew 
2 X LT will show the idea in real life
on the seams
Continuing cutting out stars. The  The drawing with numbered sections 
poplin box is done, now it's the free  X is on the TD tech table. The complete 
flow mesh box. starts are on Scott's tech table. 
Sew on small pull tabs for crew on the 
2 seams. Use scraps of the flag curtain,  X LT will show the idea in real life
or maybe muslin
Flag 
Small light stitch on the stars that  Not to be visible, just as a back up to 
Curtain X
Scott glued on over the weekend.  keep them attached if needed
Stitch the bottom hem on the flag and 
X
eliminate the safety pins
NEXT MONDAY: strike immediately 
Install top of day the following 
top of day to go back to the shop for  X X
Tuesday
paint notes. 
Photo below. The material is leaning 
Install the two pained 4x4s of MDF  against the windows in west lobby. 
Orchestra 
2 over the elevator doors in the Pit SL  X This is a lot easier to do on SR; on SL 
Pit
and SR will involve untying some cables from 
that 2x4 in order to install.
Hang A.R.T stock legs on the pipes  Stage ops already hung the pipe. Joe F 
Masking 4 running US/DS next to the barrel  X say the masking is in the overhead 
towers cubbies on SL. 

v.0
Prepared By:  LT TD:  Latiana "LT" Gourzong
Updated:  5/8/2022
 1776 Work Notes  05.08.2022

These are likely already cut, but since 
NEXT MONDAY: Strike the scrim and  they aren't in the way I want to give it 
Masking X
serge legs US of the barrel towers a week before striking in case anything 
changes during the week
Work with paints on pulling plexi so 
Show 
they can paint the raw wood inside  X
Apron
the trough
Raw plank edges DSL and DSR X
Raw masonite deck on the show apron 
X
DSL and DSR
The buttons we were able to purchase 
are black on the flag and top of the US 
drop center seam. Please paint slightly  X
Paints beige or similar, doesn't need to 
match exactly
Paint the raw wood under the plexi to 
X
match the deck color
Scott isn't sure if he'll be in tomorrow. 
Jerry he asked that you call him when  X
you have a moment to chat flag
The US west lobby door sounds 
horrible. If it's an easy fix lets do it, but  X
if not facilities will handle. 
Portal Inquiry X LT will ask in real life
Create the weekly inspection checklist 
Random
1 for curtain travellers. Complete an  X X
inspection today
TBD Tuesday or Wednesday AM, work  LT chatting with folks after the 
X
with LX on the boom move meeting tonight, will update in the AM

SL Pit Elevator Door Pic, same thing other side

v.0
Prepared By:  LT TD:  Latiana "LT" Gourzong
Updated:  5/8/2022