Professional Documents
Culture Documents
• Robust Construction
• Leak Proof
• Maintenance Free
Applications:
DR 50 9 6 48 92 B9
LE
NG
40 50 60
TH
30 70
DR 75 19 6 40 114 B11
TO
SU
20 80
IT
AP
10 90
6
0
.
2
1
PL
0 100
DR 90 16.5 6 44 152 B15
I
CA
%
TI
O
N
All Dimensions in mm
Installation
The most common position to mount the gauge is half way up the side of the tank thus allowing the shortest
float arm to be used. Any baffles or internal cross bracing should not interfere with the arc of the float arm
travel. Please note that the size, number and position of the gauge flange mounting holes are different for
each gauge. Dimensioned drawings are available on request.
We stock mounting pads pre-fitted with studs, nuts, and washers suitable for welding on to steel tanks.
Bayham Ltd. Rutherford Road Basingstoke Hampshire UK RG24 8PG Tel: +44 (0) 1256 464911 Fax: +44 (0) 1256 464366
DIRECT READING TANK CONTENTS GAUGES
TANK MOUNTING PAD DETAILS B23 TANK PAD
4 . 0 0
13 232
7 0 . 0 0
B9 TANK PAD
9.5
3 . 5 0
92 4 6 . 0 0
30 0
0
.0
30
ID 60
ID 171
3 0 . 0 7
5 1 . 5 0
40 0
40
.0
0
6 M5 STUDS SPACED
15.5 AS SHOWN ON
45 0
4
5 . 5 0
5
.
0
0
A 76 mm P.C.D.
25 7 . 5 0
9.5 117 5 7 . 0 4
13
3 . 4 9
0
.0
30 0
30
ID 83
3 7 . 2 9
40
40 0
.0
0
ID 267
6 M6 STUDS SPACED
6 7 . 0 0
13
7 . 0 0
AS SHOWN ON
A 102 mm P.C.D.
4 . 3 8
30 0
5 7 . 0 4
28 7 . 2 9
I.D 105
ALL DIMENSIONS IN mm
6
0
.
0
0
1. Gauge Type
2. Tank Dimensions
3. Mounting Position of Gauge FIG. D
4. Fluid Details FIG. A
O
O
120 MAX 82.5 MAX
5. Operating Conditions
6. Dial Calibration Units i.e. fractions,
%, litres, etc. CENTRE END OR SIDE MOUNTED CENTRE LINE MOUNTING ON
HORIZONTAL CYLINDER
7. Whether Static or Mobile
application
8. Tank Slope Angle, if any
50 60
40
30 70
20 80 O
FIG.B 10 90
150 MAX
120 MAX
required.
74 MAX
FIG. C
BAYHAM LTD.
Bayham Ltd. Rutherford Road Basingstoke Hampshire UK RG24 8PG
Tel: +44 (0) 1256 464911 Fax: +44 (0) 1256 464366 Leaflet DR1 2001