Professional Documents
Culture Documents
PLANT NORTH
10°
35°
IND
TR
PREV.W
UE
NO
R TH
5
N
T.O.S. EL.113.312
2-V-8330B
T.O.S. EL.110.850
T.O.S. EL.108.000
2-F-4303A
2-F-4303B
T.O.G. EL.106.870
T.O.G. EL.105.975
T.O.C. EL.102.175
H.P.GRADE EL.101.500
LEGEND:
SCALE 1:50 EXISTING FACILITIES
EHS SCOPE
1
PROJECT: EGP H2S SCAVENGER PROJECT
FRONT END ENGINEERING DESIGN
RWE No: 306
REV DATE BY CHKD APPD PROJECT DWG REVISIONS
K01 11-NOV-21 WAOD FCHM TBIH ISSUED FOR REVIEW
G01 30-NOV-21 WAOD FCHM TBIH ISSUED FOR DESIGN
ENGINEERING
SERVICES TEAM
NOTES
FILENAME E076-CIV-GAR-CNL-0000-02913-03
1. ALL DIMENSIONS ARE IN MILLIMETRES U.N.O
2. ALL ELEVATIONS ARE IN METRES U.N.O LOCATION ESCRAVOS GAS PLANT
ESCRAVOS GAS PLANT
3. CONTRACTOR TO CONFIRM GRADE LEVELS ON SITE. H2S SCAVENGER BED SCALE 1:50 SHEET 3 OF 6
STRUCTURAL GENERAL ARRANGEMENT
ELEVATION LOOKING NORTH R
DWG No: EGP-E076-CIV-GAR-CNL-0000-02913-03 E
REFERENCE DWG No REV BY REVISION DESCRIPTION DATE CHKD APPD REV BY REVISION DESCRIPTION DATE CHKD APPD V
0,0
A B C D E F G H A1