Professional Documents
Culture Documents
E 332500
DWG. LIMIT N 326000
PLANT NORTH
10°
35°
IND
TR
PREV.W
UE
NO
RT
E 308500
H
5 PS COL'S
N N.324500
PS COL'S
PS COL'S
E.330146
E.327846
PS COL'S
N.321000
12"-P-CCS21X-8202-H
4 N 319640
ADSORBERS
E.319570
E 330500
2-V-8330A
N.315315 PS COL'S
N.315000
3
DWG. LIMIT
2-V-8330B
N.310315
LEGEND:
EXISTING FACILITIES
N 304960
EHS SCOPE
1
PROJECT: EGP H2S SCAVENGER PROJECT
FRONT END ENGINEERING DESIGN
RWE No: 306
REV DATE BY CHKD APPD PROJECT DWG REVISIONS
K01 11-NOV-21 WAOD FCHM TBIH ISSUED FOR REVIEW
G01 30-NOV-21 WAOD FCHM TBIH ISSUED FOR DESIGN
ENGINEERING
N 301435 SERVICES TEAM
DWG. LIMIT
NOTES
FILENAME E076-CIV-GAR-CNL-0000-02913-02
1. ALL DIMENSIONS ARE IN MILLIMETRES U.N.O
2. ALL ELEVATIONS ARE IN METRES U.N.O LOCATION ESCRAVOS GAS PLANT
ESCRAVOS GAS PLANT
3. CONTRACTOR TO CONFIRM GRADE LEVELS ON SITE. H2S SCAVENGER BED SCALE 1:25 SHEET 2 OF 6
STRUCTURAL GENERAL ARRANGEMENT
PLAN ON EL.113312 R
DWG No: EGP-E076-CIV-GAR-CNL-0000-02913-02 E
REFERENCE DWG No REV BY REVISION DESCRIPTION DATE CHKD APPD REV BY REVISION DESCRIPTION DATE CHKD APPD V
0,0
A B C D E F G H A1