You are on page 1of 30

H2S SOLID BED

SCAVENGER PROJECT

FEED ENGINEERING
REQUISITION FOR CONTROL VALVES

Contract No:
Work Authorization:

EHS-E076-ICS-REQ-CNL-000-90008-00

G01 24-Feb-21 ISSUED FOR DESIGN JD LCFK I.OJOBOH

E01 21-Jan-21 ISSUED FOR REVIEW JD LCFK I.OJOBOH

REV DATE DESCRIPTION ORIG CHK APPR


APPROVED BY:
CHEVRON NIGERIA LIMITED
DATE:

Project Area Discipline Type Originator Package Sequence-Sht Revision


Document Control No.
EHS E076 ICS REQ CNL 000 90008-00 G01
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90008-00
Revision No.: G01

SECTION 9.0

TECHNICAL REQUEST

(DOCUMENT NO. EHS-E076-ICS-RFQ-CNL-000-90001-00)

EXHIBIT “A” GENERAL INSTRUCTIONS

EXHIBIT “B” COMPANY’s APPROVED MANUFACTURER’s LIST

EXHIBIT “C” LIST OF SUB-SUPPLIERS / SUB-CONTRACTORS

EXHIBIT - 1 SCHEDULE OF QUANTITY

EXHIBIT - 2 SPARE PARTS REQUIREMENTS

EXHIBIT - 3 UNIT RATES

EXHIBIT - 4 DOCUMENTATION PROCEDURE

EXHIBIT - 5 SUPPLIER DATA REQUIREMENT & SCHEDULE

EXHIBIT - 6 MILESTONE SCHEDULE

EXHIBIT - 7 PROJECT DRAWINGS, DATASHEETS, SPECIFICATIONS ETC.

EXHIBIT - 8 COMPANY SPECIFICATIONS, DRAWINGS, APPLICABLE CODES & STANDARDS

EXHIBIT - 9 LIST OF TECHNICAL EXCEPTIONS

EXHIBIT - 10 QUALITY PLAN

EXHIBIT - 11 INSPECTION & TEST PLAN

EXHIBIT - 12 TECHNICAL BID EVALUATION CRITERIA (EQUIPMENTS / MATERIALS)

EXHIBIT - 13 TECHNICAL REQUEST BID SUBMISSION CHECK LIST

Page 2 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90008-00
Revision No.: G01

EXHIBIT “A”

GENERAL INSTRUCTIONS

1.0 APPROVED VENDOR LIST:-

COMPANY’s approved sub-vendor / manufacturer list is in Exhibit “B” [COMPANY’s Approved


Manufacturer’s List]. SUPPLIER should follow the same for the procurement of the item included in
the package or in the supplied equipment.

2.0 SUB-SUPPLIERS / SUB-CONTRACTORS:-

All sub-suppliers / sub-contractors that the BIDDER proposes to use in the performance of the Work as
well as the approximate value of that portion of the Work must be listed in Exhibit “C” [List of Sub-
Suppliers / Sub-Contractors] of the BIDDER’s proposal. COMPANY reserves the right to review, and
accept or reject any or all of the BIDDER’s proposed sub-contractors.

3.0 SPARE PARTS:-

3.1 BIDDER should submit a separate price list for start-up & commissioning spares, insurance
spares & 2 years operational spares along with the bid as per Exhibit - 2 [Spare Parts
Requirements].

3.2 Spares Parts bid validity should be minimum ninety (90) calendar days more from date of
issue of Purchase Order (PO) for the main equipment. Any PO shall be issued within the period
of applicable bid validity. BIDDER to make sure that the unit prices for the spare parts shall
cover the extended bid validity as per 3.2.

4.0 VENDOR ASSISTANCE IN INSTALLATION & COMMISSIONING:-

4.1 SUPPLIER have to provide the assistance in installation, commissioning & start up and training
on the equipment as required in Exhibit - 5 [Supplier Data Requirement & Schedule].

4.2 SUPPLIER has to provide the detail schedule for installation, commissioning & startup
preferably level 5 schedule. Schedule shall also include the time period required for
SUPPLIER’s site engineer & representative.

4.3 Unit Rates should be quoted for these services along with the bid.

4.4 COMPANY will inform the SUPPLIER in advance to assign their personnel to assist in site
activity for commissioning of the equipment.

4.5 The PO award will be contingent on SUPPLIER’s agreement to support installation,


commissioning, and start-up activities.

5.0 EXCEPTIONS TO TECHNICAL REQUIREMENTS:-

5.1 COMPANY purchase order(s) resulting from this REQ shall also be based on the technical
requirements of this REQ.

5.2 If BIDDER must take exception, BIDDER shall specify clearly the exception(s) in Exhibit - 9
[List of Technical Exceptions] of the bid, explain specifically what is not acceptable and
BIDDER is to justify why specific technical exception been taken and propose alternate with
proper technical justification.
Page 3 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90008-00
Revision No.: G01

6.0 ALTERNATE PROPOSAL:-

6.1 If BIDDER wishes to propose alternate technical and/or commercial proposals to the base bid,
only alternate proposals by the Original Equipment Manufacturers (OEMs) identified on the
Exhibit “B” [COMPANY’s Approved Manufacturer’s List] shall be acceptable. Alternate
proposals shall be consistent with a “like for like in function” philosophy.

6.2 If BIDDER wishes to propose alternate technical and/or commercial proposals to the base bid,
BIDDER may do so by attaching such proposals, in this the BIDDER shall state price and
schedule impact of the alternate proposal. Alternate proposal shall not deviate from the
specifications. Also BIDDER shall state reasons why the alternate will be advantageous to
COMPANY.

6.3 BIDDER shall note and be responsible for accounting for any and all impact of their alternate
proposals would have on all options requested by COMPANY in any portion of this REQ. Any
impact/change not noted by BIDDER shall obligate them to bear the contract should the
COMPANY elect to accept the alternate proposal.

7.0 DOCUMENTS SUBMISSION:-

7.1 Documents required to be submitted are listed in Exhibit - 5 [Supplier Data Requirement &
Schedule]. BIDDER may add the other required document as applicable.

7.2 BIDDER should also complete the data sheets and other project document as listed in Exhibit
- 7 [Project Drawings, Datasheets, Specifications Etc.].

7.3 The documentation procedure to be followed by BIDDER is listed in Exhibit - 4


[Documentation Procedure] and BIDDER has to follow it strictly for any document submittal
in the event of PO award.

8.0 VENDOR QUALITY PLAN:-

8.1 Minimum requirement of Quality Assurance (QA) plan to be followed by BIDDER is listed in
Exhibit - 10 [Quality Plan].

8.2 BIDDER should follow the proper quality plan for specific items and submit the quality plan as
per Exhibit - 10 [Quality Plan].

8.3 If the BIDDER wishes to submit their own quality plan, such plan shall meet COMPANY’s
requirements as stipulated in Exhibit - 10 [Quality Plan].

9.0 EQUIPMENT NAME PLATE & TAGGING:-

9.1 All major equipment should have the name plate with equipment tag number etc.

9.2 All bulk material and loose items as a minimum should be tagged properly for correct
identification and erection site.

Page 4 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90008-00
Revision No.: G01

EXHIBIT “B”

COMPANY’s APPROVED MANUFACTURER’s LIST

COMPANY’s Approved Manufacturer’s List is listed in this Exhibit “B”. BIDDER has to review carefully and
should follow strictly the same for the procurement of the item (s) included in the package or in the supplied
equipment.

Flow Control Valve Name : Fisher (EMERSON PROCESS MANAGEMENT)

Note:- BIDDER should indicate clearly in their documents the manufacturer name, model number and country
of origin for each relevant item (s) included in the package or in the supplied equipment.

Page 5 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90008-00
Revision No.: G01

EXHIBIT “C”

LIST OF SUB-SUPPLIERS / SUB-CONTRACTORS

It is the BIDDER’s intent to perform all of the Work covered in any Purchase Order resulting from this REQ with
the exception of the following items below, which BIDDER proposes to sub-contract. It is agreed that BIDDER
shall retain complete responsibility for complying with all provisions of the Purchase Order, including any and
all sub-contracted work.

COMPANY reserves the right to reject any and all proposed SUB-SUPPLIERS.

Approximate Value of
S. SUB-SUPPLIER’s
Sub-Contracted Work Work
No. Name & Location
(in USD)

Total (in USD)

Authorized Signatory :

Date :

Name :

Designation :

BIDDER Name :

Page 6 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

EXHIBIT - 1

SCHEDULE OF QUANTITY

BIDDER is requested to furnish the equipment and services as described in the REQ for an all Inclusive Lump Sum (LS) price or unit prices as requested in the following breakdown. Costs shall
include, but not be limited to, manufacture, assembly, testing and preparation for shipment of all components in accordance to appropriate codes, transportation within BIDDER’s assembly yard,
and lift and tie down of equipment from BIDDER’s yard to Chevron Nigeria Limited Warri Project Warehouse, Kilometer 4, New Expressway, Warri, Delta State, Nigeria on DDP
(Delivered Duty Paid) basis.
Extended Delivery period to
Unit Price Delivery period at
Item No.

Price deliver on DDP


Item Size Description Qty. Unit Ex-works
basis.
(in USD) (in Weeks ARO)
(in USD) (in Weeks ARO)

Valve Type: GLOBE


Actuator type: SPRING & DIAPHRAGM
Modulating: YES
Body/Bonnet Material: ASTM A350 LF2
End Connections In / Out: 6" RF Flange #600
Packing: ENVIRO-SEAL DUPLEX
Flow
Trim Type: STANDARD
1 Control 4 in 2 Each
Seat Material: 410 SST
Valve
Stem Material: 316 SST
Positioner: Digital DVC 6200

Manufacturer / Model: FISHER / ET


Tags: FV-8330, FV-6030
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

Extended Delivery period to


Unit Price Delivery period at
Item No.

Price deliver on DDP


Item Size Description Qty. Unit Ex-works
basis.
(in USD) (in Weeks ARO)
(in USD) (in Weeks ARO)

Vendor Data (as per Exhibit - 5) - Electronic Copy in CD Format and 5 Hard Copies of All
2 Lot
Final Accepted Documents.

3 Start-up and Commissioning Spare Parts. LS

Total Cost for the delivery at Chevron Nigeria Limited Warri Project Warehouse,
Kilometer 4, New Expressway, Warri, Delta State, Nigeria on DDP (Delivered Duty Paid)
basis

OPTIONAL
ITEMS:-
4 Insurance Spare Parts. LS

5 Two (2) Year Operating Spare Parts. LS

MARK-UP:-

BIDDER Mark-up on the Manufacturer’s Cost : %

MODE OF SHIPMENT / TRANSPORTATION:-

Place of the Ex-works. :

Mode of Shipment from Ex-works to Nigeria. :

Place of the Arrival of Shipment in Nigeria. :

Page 8 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

Mode of Transportation to Warri. :

Payment Terms : As per Section 6.0 [Standard Purchase Order Terms And Conditions]

Warranty / Guarantee Terms : As per Section 6.0 [Standard Purchase Order Terms And Conditions]

Cancellation Schedule : BIDDER should submit along with the bid (If Applicable)

Important Notes:-

.A. Vendor proposal shall be based on process conditions defined on data sheets Doc No: EHS-E076-ICS-DAS-CNL-000-90012-00.

B. Model numbers provided are for reference only. Vendor shall provide and recommend the final and most suitable model / type to be used and shall be approved by COMPANY.

C. Vendor to furnish items with permanently attached stainless steel tags. Tags shall include Manufacturer, model, serial number and tag.

D. Vendor shall furnish five (5) sets of installation, operations and maintenance manuals.

E. Vendor after PO shall prepare a set of engineering drawings for COMPANY approval.

F. VTA: Vendor To Advise

G. ARO: After Receipt of Purchase Order

H. Vendor to perform final sizing calculation report of each control and be made part of the BID.

Page 9 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

Page 10 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

EXHIBIT - 2

SPARE PARTS REQUIREMENTS

START- UP & COMMISSIONING SPARE PARTS:-

1.1 Those parts required to prepare the equipment for start-up, and to safeguard the operation of
equipment during storage, installation, pre-commissioning, commissioning, and start-up periods.

1.2 The selection shall be based on the BIDDER’s recommendations and shall be reviewed and
revised by COMPANY as required.

1.3 BIDDER should submit a Lump Sum price in Item No. 9, Exhibit - 1 [Schedule of Quantity]
and separate price list for all the parts with the required quantity and unit price along with the
bid.

2.0 INSURANCE SPARE PARTS:-

2.1 Those parts of equipment, equipment assemblies, or complete items of equipment that are
required for replacement of items not subject to deterioration by normal use, but failure of which
is critical for continued and safe operation of the equipment or plant after the start-up period.

2.2 The selection shall be based on the BIDDER’s recommendations and shall be reviewed and
revised by COMPANY as required.

2.3 BIDDER should submit a Lump Sum price in Item No. 10, Exhibit - 1 [Schedule of Quantity]
and separate price list for all the parts with the required quantity and unit price along with the
bid.

3.0 TWO (2) YEAR OPERATING SPARE PARTS:-

3.1 Those parts of equipment, equipment assemblies, or complete items of equipment that is
recommended and required to maintain the operation of equipment during the first two (2) years
of operation.

3.2 The selection shall be based on the BIDDER’s recommendations and shall be reviewed and
revised by COMPANY as required.

3.3 BIDDER should submit a Lump Sum price in Item No. 11


, Exhibit - 1 [Schedule of Quantity] and separate price list for all the parts with the required quantity and
unit price along with the bid.
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

EXHIBIT - 3

UNIT RATES

OPTIONAL ITEMS:-

Below is the BIDDER’s labor and equipment unit rate for determination of cost of extra work that cannot be
determined from the cost breakdown in Exhibit - 1 [Schedule of Quantity].

1. ADDITIONS / DELETIONS:-

Composite man-hour rate (Including supervision, office staff, labor, consumables, and Equipment)

Straight Time : USD_________ / hr.

Overtime (Over 40 hr. / Week) : USD_________ / hr.

Note:- Chargeable for craft labor only.

2. MATERIALS:-

For any additional material that are not covered in the Exhibit - 1 [Schedule of Quantity], BIDDER have to
indicate that as % on the documented cost.

Then the material cost shall be at a documented cost plus _____%.

3. DAY RATE FOR EXPAT PERSONNEL (NOTES 3.1 TO 3.3):-

Daily rate, per Diem, etc. for supervision of pre-


: USD_______ / day in Nigeria.
commissioning as per note 3.3.1
Daily rate, per Diem, etc. for supervision of
: USD_______ / day in Nigeria.
commissioning as per note 3.3.1

Lump Sum cost for round trip as per note 3.2.1 : USD_______

4. DAY RATE FOR NATIONAL PERSONNEL (NOTES 3.1 TO 3.3):-

Daily rate, per Diem, etc. for supervision of pre-


: USD_______ / day in Nigeria.
commissioning as per note 3.3.2
Daily rate, per Diem, etc. for supervision of
: USD_______ / day in Nigeria.
commissioning as per note 3.3.2

Lump Sum cost for round trip as per note 3.2.2 : USD_______

MARK-UP:-

BIDDER Mark-up on the Manufacturer’s Cost : _________ %

Notes:-
3.1 BIDDER is to include in the offer an estimated cost and schedule (BIDDER to state clearly the required
number of days on site and travel days) for the assistance in Installation, Commissioning, Start up and
Training of the equipments as required in Exhibit - 5 [Supplier Data Requirement & Schedule]. Unit
Rates will be used for such services. These services may require the physical presence of suitably
experienced VENDOR staff on site during Installation, Commissioning and Start-up of the plant. Test

Page 12 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

equipment required for any site testing of plant should be priced in the estimate, should such testing be
deemed necessary and should COMPANY require that the VENDOR provide test equipment.

3.2 BIDDER to confirm the respective lump sum cost for the return flight from his location (country of origin)
3.2.1 For Expat Personnel from outside Nigeria: To & from Logos which shall include the travel days,
necessary accommodation on arrival day and necessary accommodation on departure day
including and any other local transportation from/to his accommodation to/from Airport vice versa.
This includes all travel documentation e.g. Visa, etc.

3.2.2 For National Personnel from in county Nigeria: To & from Logos which shall include the travel
time, necessary accommodation on arrival day and necessary accommodation on departure day
including and any other local transportation from/to his accommodation to/from Airport vice versa.

3.3 The applicability of the day rate as follows:


3.3.1 For Expat Personnel: The day rate shall commence from the day the person arrives at Chevron
nominated Airport (either Aero Contractors Airport or Local Airport - MM2) for the further travel to
Chevron field or site locations and the day rate cease from the day person arrived at Chevron
nominated Airport (either Aero Contractors Airport or Local Airport - MM2) for his further travel to
his home country.

3.3.2 For National Personnel: The day rate shall commence from the day the person arrives at
Chevron nominated Airport (either Aero Contractors Airport or Local Airport - MM2) for the travel
to Chevron field or site locations and the day rate cease from the day person arrived at Chevron
nominated Airport (either Aero Contractors Airport or Local Airport - MM2) for his further travel to
his home in country.

Page 13 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

EXHIBIT - 4

DOCUMENTATION PROCEDURE

The below COMPANY’s Documentation Procedure is to be carefully reviewed by BIDDER and confirm
compliance. If BIDDER must take exception, BIDDER shall specify clearly the exception(s) in Exhibit - 9 [List of
Technical Exceptions] of the bid.

S.
Document Number Rev. Date Description
No.
Information Management Requirements
1 DIB-D057-ITM-SPC-CNL-000-00001-00 K01 03-Jun-2011
Specification

2 DIB-D057-ITM-SPC-CNL-000-00002-00 K01 03-Jun-2011 Numbering and Coding Specification

3 DIB-D057-ITM-SPC-CNL-000-00003-00 K01 03-Jun-2011 Document Control and Exchange Specification

Vital Documentation and Data Deliverables


4 DIB-D057-ITM-SPC-CNL-000-00004-00 K01 03-Jun-2011
(VDD) Specification

DECLARATION:-
We (BIDDER) hereby confirm that Exhibit - 4 (Documentation Procedure) have been fully reviewed and all the
cost are included in Exhibit - 1 [Schedule of Quantity] of the REQ.

Authorized Signatory :

Date :

Name :

Designation :

BIDDER Name :

Page 14 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

EXHIBIT - 5

SUPPLIER DATA REQUIREMENT & SCHEDULE

COMPANY requires that the BIDDER submit a complete Supplier Data Book(s) and Equipment Manual(s) as per
the below Supplier Data Schedule as a MINIMUM. This data is required to support completion of Purchase Order
requirements and COMPANY places great importance on timely receipt of accurate and useful “as-built” supplier
data. The approved supplier data schedule will become part of the Purchase Order if the event of award.

Notes:-
1. The payment will be made after the acceptance of all Drawing and Data Requirements as listed in the
Exhibit - 5.
2. All documents / drawings and data shall include Customer, Item Number, Project, & Purchase Order
Number.
3. Transmittals shall be clearly marked with the Customer, Project & Purchase Order Number.
4. BIDDER grants COMPANY permission to make additional copies of all drawings and data.
5. Drawings and Data shall be submitted to COMPANY as follows:-
Chevron Nigeria Limited
Dibi Long Term Facility (DLT) Project
Attention: Ugochukwu EMEME, Project Manager / Adesegun ADEBANJO, Project Engineer
E-mail: UEmeme@chevron.com / AdesegunAdeanjo@chevron.com

6. All document / drawing submittals (including schedule) shall be in both native and Adobe Acrobat PDF
format and on Compact Disk (CD). All drawings shall be completed on AutoCAD 2004 and shall be
provided on CD in the native AutoCAD “DWG” format. All drawings shall be fully bound (X refs) and shall
be zoomed to extents before saving in the required AutoCAD format.
7. The COMPANY required documents which are marked as “X” in the fourth column below of this Exhibit -
5 should be submitted by the BIDDER along with the bid.
8. The final document / drawing package (5 copies) shall be fully indexed (each document / drawing) and
bound with a hard overall cover.

SUPPLIER DATA SCHEDULE

(To Be filled by COMPANY


BIDDER Name (To Be filled by COMPANY during PO Award) PO No.
during PO Award)
(To Be filled by COMPANY
Contact (To Be filled by COMPANY during PO Award) Phone
during PO Award)
Drawings and Data shall be submitted to COMPANY as follows:- (Communication Address & Contact
C= Electronic Copy (PDF/ AutoCAD DWG Format) and 5 hard copies of Details)
all final accepted documents. (To Be filled by COMPANY during PO
T= Transparency (Drawings Larger Than 11" x 17") Award)

BIDDER BIDDER COMPANY BIDDER's


Number of Work Held to Required Proposed
Copies Until Submit Submittal Submittal
Drawing or Data Description
SUPPLIER to COMPANY’s along Time Time
Submit Acceptance With
(Mark as X) Bid (in Weeks) (in Weeks)
SUPPLIER Data Requirements shall be per applicable section of the Specification:
CLASS 1 VENDOR DOCUMENTS
Basic Approval Documents
C Detail Work / Project Schedule from the receipt
4 WAPOA
(see note 2) of PO to delivery of equipment & Final Data Book
C
Drawing List / Deliverables Register X 4 WAPOA
(see note 2)
C Detail Schedule for Installation, Pre-
X
(see note 2) Commissioning, Commissioning, Start up and

Page 15 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

BIDDER BIDDER COMPANY BIDDER's


Number of Work Held to Required Proposed
Copies Until Submit Submittal Submittal
Drawing or Data Description
SUPPLIER to COMPANY’s along Time Time
Submit Acceptance With
(Mark as X) Bid (in Weeks) (in Weeks)
Training on the equipment / Package item and
time period required for SUPPLIER’s Site
Representatives. (As applicable & required)
C
Quality Assurance Plan X 4 WAPOA
(see note 2)
C
Inspection and Test Plan X 4 WAPOA
(see note 2)
C Painting / Surface Preparation Procedures and
X 4 WAPOA
(see note 2) Materials
C Storage / Preservation Instructions and
X 4 WAPOA
(see note 2) Procedures for Short Term (< 6 Months)
C Storage / Preservation Instructions and
X 4 WAPOA
(see note 2) Procedures for Long Term (> 6 Months)
C Nameplate Facsimile detail and Actual Name
4 WAPOA
(see note 2) Plate Rubbing
C Recommended Start-Up / Commissioning Spare
X 4 WAPOA
(see note 2) Parts List (Priced)
C Recommended Insurance Spare Parts List
X 4 WAPOA
(see note 2) (Priced)
C Recommended Two (2) Year Operating Spare
X 4 WAPOA
(see note 2) Parts List (Priced)
C
Nickel Plate Heat Treat Process
(see note 2)
C Nickel Plate Thick, Appear, Adhes, Poros, Hard,
(see note 2) Alloy Test Procedures
C
Tungsten Carbide Coating Process
(see note 2)
C Tungsten Carbide Thick, Appear, Adhes, Poros,
(see note 2) Hard, Alloy Test Prop.
C
Inconel Overlay Procedure
(see note 2)
C
Positive Material Identification Procedure 4 WPTT
(see note 2)
C
Post-Weld Heat Treatment Procedure 4 WPTT
(see note 2)
C Welding and Welding Repair Procedures : WPS /
4 WPTT
(see note 2) PQR
C NDE Procedures (Visual, Radiograph, Dye pen,
4 WPTT
(see note 2) Magnetic Particle, Ultrasonic)
C
Pressure Test Procedures (Body and Seat) X 4 WPTT
(see note 2)
C
Impact Test Procedures 4 WPTT
(see note 2)
C Metallography (Ferrite Count) Procedure and
4 WPTT
(see note 2) Photomicrograph
C
Corrosion Test Procedure 4 WPTT
(see note 2)
C
Hardness Test Procedure 4 WPTT
(see note 2)
C
X Bill Of Materials A/C
(see note 2)
General Arrangement Assembly Drawing of
C
X Valve and Actuator with: Outline Dimensions, X 4 WAPOA
(see note 2)
Weight
General Cross-Sectional Drawing with: Outline
C Dimensions, End Connection Details,
X X 4 WAPOA
(see note 2) Attachment Type, Location and Size; Weight and
Materials List

Page 16 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

BIDDER BIDDER COMPANY BIDDER's


Number of Work Held to Required Proposed
Copies Until Submit Submittal Submittal
Drawing or Data Description
SUPPLIER to COMPANY’s along Time Time
Submit Acceptance With
(Mark as X) Bid (in Weeks) (in Weeks)
Actuator Plan, Elevation and General Cross-
C
X Sectional Drawing with: Outline Dimensions, 4 WAPOA
(see note 2)
Attachment Details, Weight and Materials List
C Actuator Wiring Diagrams, Control Schematics
X 4 WAPOA
(see note 2) and Sizing Calculations
C
General Description of Valve and Actuator X A/C
(see note 2)
C Completed “General Requirements for Valve
X 4 WAPOA
(see note 2) Purchase” Sheets
C Completed “Valve Data Sheet” and “Actuator
X 4 WAPOA
(see note 2) Data Sheet”
C Replacement Seal Kit Details (Valve Stem Seal
(see note 2) Kit, Piston Seal for Act.)
C
Special Tool Details (If Applicable) 4 WAPOA
(see note 2)
C Shipping and Handling Instructions with Lifting
10 WPTS
(see note 2) Plan
C Installation, Operation & Maintenance
X 8 WPTS
(see note 2) Instructions
C
Technical / Final Data Book Detail Index X 8 WPTS
(see note 2)
CLASS 2 VENDOR DOCUMENTS
Fabrication, Testing, Final Data
C Once in 2
Project Status Reports
(see note 2) Weeks
C When
Un-priced Purchase Orders
(see note 2) Placed
C
Corrosion Test Certificates A/C
(see note 2)
C
Hardness Test Certificates A/C
(see note 2)
C
Heat Treatment Records Certificates A/C
(see note 2)
C
Positive Material Identification Certificates A/C
(see note 2)
C
Pressure Test (Body and Seat) Certificates A/C
(see note 2)
C
Impact Test Certificates A/C
(see note 2)
C Metallography (Ferrite Count) Certificate and
A/C
(see note 2) Photomicrograph
C
Type Approval Certificates A/C
(see note 2)
C Manufacturer NDE (Visual, Radiograph, Dye
A/C
(see note 2) pen, Magnetic Particle, Ultrasonic) Certificates
C
Mill Test Certificates A/C
(see note 2)
C
Post-Weld Heat Treatment Charts A/C
(see note 2)
C
Hydrotest Charts / Reports A/C
(see note 2)
C
Stress Relief Charts A/C
(see note 2)
C
Coating Records A/C
(see note 2)
C Certifying Authorities Certificates (Fire-tests, ISO
A/C
(see note 2) 9000, API, UL)

Page 17 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

BIDDER BIDDER COMPANY BIDDER's


Number of Work Held to Required Proposed
Copies Until Submit Submittal Submittal
Drawing or Data Description
SUPPLIER to COMPANY’s along Time Time
Submit Acceptance With
(Mark as X) Bid (in Weeks) (in Weeks)
C
Manufacturer's Data Sheets and U1-A Reports X A/C
(see note 2)
C
Material Traceability Maps A/C
(see note 2)
C
NDE Inspection Reports / Records / Maps A/C
(see note 2)
C Measuring, Testing & Inspection Equipment
X A/C
(see note 2) Calibration Certificate
C
Other inspection Records / Reports X A/C
(see note 2)
C
Mechanical Test Reports X 2 WAT
(see note 2)
C
Performance Test Reports X 2 WAT
(see note 2)
C
Certificate of Conformity X 1 WPTS
(see note 2)
C
Inspection Release Certificate X 1 WPTS
(see note 2)
C
Final Data Book X 6 WAS
(see note 2)
Notes:-
WAPOA Weeks After Purchase Order Award
WPTT Weeks Prior To Testing
WAT Weeks After Testing
WPTS Weeks Prior To Shipment
WAS Weeks After Shipment
A/C As Completed

DECLARATION:-
We (BIDDER) hereby confirm that Exhibit - 5 (Supplier Data Requirement & Schedule) have been fully reviewed
and all the cost are included in Exhibit - 1 [Schedule of Quantity] of the REQ.

Authorized Signatory :

Date :

Name :

Designation :

BIDDER Name :

Page 18 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

EXHIBIT - 6

MILESTONE SCHEDULE

BIDDER has to complete each milestone task with agreement from COMPANY.

COMPANY BIDDER
Proposed Proposed
Item
Milestone Description Time Time
No.
(in Number of Weeks After Receipt
of Purchase Order)
SUPPLIER’s Purchase Order Award to their SUB-
1 Bidder to Advice
SUPPLIER (S) (If Applicable)

2 Complete Engineering and Design Bidder to Advice

3 Complete Drawings for COMPANY Review & Acceptance* Bidder to Advice

4 Drawing Review & Acceptance by COMPANY* Bidder to Advice

5 Revise and Resubmit Drawings for COMPANY Acceptance* Bidder to Advice

6 Receipt of Major Raw Materials (SUPPLIER’s Procurement) Bidder to Advice

7 Commence Assembly Bidder to Advice

8 Complete Assembly Bidder to Advice

9 Complete Acceptance Testing Bidder to Advice

10 Ready for Shipment Bidder to Advice

11 Final Data Book Submission Bidder to Advice

Delivery at Chevron Nigeria Limited Warri Project


12 Warehouse, Kilometer 4, New Expressway, Warri, Delta Bidder to Advice
State, Nigeria on DDP (Delivered Duty Paid) basis

*All drawings for review and acceptance shall be submitted as per Exhibit - 5 [Supplier Data Requirement &
Schedule] of this REQ.

Page 19 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

EXHIBIT - 7

PROJECT DRAWINGS, DATASHEETS, SPECIFICATIONS ETC.

All the below technical documents are to be carefully reviewed by BIDDER & confirm compliance. If BIDDER
intends to modify, it has to be clearly state the changes to the COMPANY with proper justification through Exhibit
- 9 [List of Technical Exceptions].

S.
Document Number Rev. Date Description
No.

1 DIB-D106-ICS-DAS-CMA-000-07062-00 U02 15 Nov 12 DATA SHEETS FOR CONTROL VALVES - SFS

Important Notes:-
I. Vendor proposal shall be based on process conditions defined on data sheets.
II. Model numbers provided are referential. Vendor shall recommend models to be used for actuator,
positioner and any special trim needed.
III. BIDDER should complete the Data Sheet and submit along with the bid.
IV. Vendor shall provide sizing report for all the control valves and submit along with the bid.
V. Vendor to furnish valves with permanently attached stainless steel tags. Tags shall include
Manufacturer, model and serial number, trim size and type, actuator size and tag number.
VI. Vendor after PO shall prepare a set of engineering mechanical and electrical drawings for COMPANY
approval.

Page 20 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

EXHIBIT - 8

COMPANY SPECIFICATIONS, APPLICABLE CODES & STANDARDS

All the below technical documents are to be carefully reviewed by BIDDER & confirm compliance. If BIDDER
intends to modify, it has to be clearly state the changes to the COMPANY with proper justification through Exhibit
- 9 [List of Technical Exceptions].

1. COMPANY SPECIFICATIONS:-

S.
Specification No. Rev. Date Description
No.

1 CNL Spec 11.10 A 20-Nov-1991 Control Valves

Piping Service Classifications and Material


2 CNL-GS-3.00 C Sep-1996
Requirements

Materials and Application of Painting and


3 COM-SU-2.02-A C 06 Jan 2010
Protective Coatings

4 CNL Spec 0.03 A 04-Oct-1991 Preparation for Shipping and Storage

2. APPLICABLE CODES & STANDARDS:-

S.
Codes / Standards Rev. Date Description
No.

As mentioned in the Company Specifications and Project Datasheets

Page 21 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

EXHIBIT - 9

LIST OF TECHNICAL EXCEPTIONS

BIDDER's may raise technical exceptions if any to COMPANY through this Exhibit - 9 only. If exceptions are not
noted in Exhibit - 9, then the bid is fully compliance with COMPANY’s technical requirements.

Wording of
Wording of
COMPANY’s Section BIDDER’s
Exception Doc. COMPANY’s Reason For
Document or Proposed
No. Rev. Paragraph / Exception
Number Reference Paragraph /
Language
Language

DECLARATION:-
We (BIDDER) have reviewed all the attached technical requirements of this REQ carefully and have obtained all
the information required to enable BIDDER to submit a technical bid and BIDDER is satisfied as to the correctness
and sufficiency of COMPANY’s technical requirements.

Authorized Signatory :

Date :

Name :

Designation :

BIDDER Name :

Page 22 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

EXHIBIT - 10

QUALITY PLAN

1. COMPANY plans to maintain an inspection staff throughout the duration of the manufacturing / assembly
in order to independently monitor the SUPPLIER’s QA/QC activities.

2. BIDDER shall provide with the bid a brief description and organizational chart which identifies SUPPLIER’s
QA/QC activities during the course of the project. The description shall describe the interfaces between the
SUPPLIER’s internal organizational groups and COMPANY’s engineers and inspectors. The description shall also
identify QA/QC activities of SUB-SUPPLIER and their interface with SUPPLIER. All personnel involved with the
QA/QC activities shall be identified in the bid and certification from outside agencies shall be listed.

3. In addition, the SUPPLIER shall complete and submit with the bid, a project specific Quality Plan which is
similar in format to the below sample as a MINIMUM. The Quality Plan shall indicate project controls of SUPPLIER
who shall use from the purchase order award through the final delivery of the equipment. The Quality Plan shall
identify all SUPPLIER QC Hold / Witness / Review points, including sub-contracted work, and all COMPANY’s
Hold / Witness / Review points in line with Exhibit - 11 [Inspection & Test Plan].

QUALITY PLAN

BIDDER Quality PO
Name Plan For No.

Customer Sheet XX of XX

PO
Project DIBI Long Term Facility (DLT) Project
Description

Quality Vendor QC Requirement


Inspection Procedure Acceptance Freq.
Activity Characteristics Form
Act No. Reference Criteria Ref.
to be verified Ref.
Vendor Company

SUPPLIER Issued COMPANY


Document No. By Acceptance

Revision Date Date


V Visual
H Hold
D Dimensional
M Monitor
X Ray
U Ultras

Page 23 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

EXHIBIT - 11

INSPECTION & TEST PLAN

Minimum requirement of COMPANY’s Inspection & Testing Requirements (ITR) are listed in this Exhibit - 11.
BIDDER has to review carefully & to confirm compliance. If BIDDER must take exception, BIDDER shall specify
clearly the exception(s) in Exhibit - 9 [List of Technical Exceptions] of the bid. The ITR is the basis for developing
SUPPLIER / SUB-SUPPLIER (S) Inspection and Test Plan (ITP).

BIDDER shall complete the ITP and submit with the bid which is similar in format to the attached sample in this
REQ.

The ITP shall cover the major quality-related activities in chronological order from contract review, through
manufacturing / fabrication, assembly to final testing, documentation, and certification. If the BIDDER wishes to
submit their own ITP, such ITP shall meet COMPANY’s ITR requirements as a minimum and the following
information as minimum is included.

1. Locations at which each activity will take place, including SUB-SUPPLIER premises.

2. Quality verification activity / stage.

3. Reference document / procedure or method statement to perform activity, including specific


reference to actual section / page of procedures, standards, instructions, specifications, etc.

4. Acceptance criteria.

5. Certifying or verifying documents generated to provide evidence of compliance with specified


requirements.

6. CONTRACTOR, Third Party and COMPANY inspection activities defined in terms of Hold /
Witness, Observe, Document Review and Inspect points.

Where activities are to be undertaken by a SUB-SUPPLIER (S), the ITP shall make reference to this fact and
include details of SUB-SUPPLIER (S) involvement. Separate ITPs shall be required for each SUB-SUPPLIER’s
work.

All inspection and testing activity shall be performed using COMPANY’s accepted ITP, Procedures, and
acceptance criteria. All ITPs shall be accepted by COMPANY prior to commencement of any work.

SUPPLIER shall develop all test procedures and submit to COMPANY for review and acceptance - including any
/ all SUB-SUPPLIER (S) testing procedures.

SUPPLIER shall ensure that all applicable codes, standards, and relevant acceptance criteria documents are
available at the work location, and that COMPANY’s representatives on site shall have ongoing access to this
information.

SUPLLIER shall be ultimately responsible for the development and proper implementation of all ITPs, including
those reviewed or developed by SUB-SUPPLIER (S).

COMPANY reserves the right to select witness and hold points within all developed ITPs for COMPANY’s oversight
of selected functions and to perform surveillance or audits of the Work.

THIRD PARTY INSPECTION

COMPANY shall arrange for any third party inspection of equipment, materials, installation, erection or
construction required by statutory regulations. The SUPPLIER shall give COMPANY at least 10 Working days’
notice of all visits to the Work site(s) by third party inspectors, to plan COMPANY’s participation in such visits.
COMPANY INSPECTIONS & AUDITS

Page 24 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

COMPANY may inspect and shall have free access at all times to any part of SUPPLIER’s / SUB-SUPPLIER’s
facilities associated with COMPANY Work. COMPANY reserves the right to participate in any audits scheduled
by SUPPLIER / SUB-SUPPLIER or to plan and conduct its own audits including SUPPLIER / SUB-SUPPLIER
facilities. COMPANY shall have the option of inspecting every item and procedure associated with the Work.
Work shall not proceed beyond COMPANY inspection "witness" or "hold" points without COMPANY inspection
or COMPANY written waiver of inspection. COMPANY inspectors shall have the right to explore any apparent
defects in Materials, welds or fabrication. SUPPLIER / SUB-SUPPLIER shall provide office space, drawings,
phone and other support Materials for COMPANY inspection personnel during execution of the Work. In addition
to inspection points indicated on the ITPs, COMPANY may, at its sole option, inspect any activity related to
COMPANY’s purchase order in SUPPLIER’s / SUB-SUPPLIER’s facilities at any time. SUPPLIER / SUB-
SUPPLIER shall fully support COMPANY in this activity on an accompanied or unaccompanied basis as required
by COMPANY.

Methods of COMPANY inspection may include, but are not limited to: visual, metallurgical, dimensional, or any
suitable non-destructive testing method. The type and extent of inspection shall be at the discretion of COMPANY.
SUPPLIER shall provide five (5) working days advance notice for U.S. domestic travel by COMPANY, or ten (10)
working days notice for international travel by COMPANY prior to the start of any COMPANY Required Notification
for “Hold/Witness” or “Observe” inspection and test points. For performance or mechanical tests, SUPPLIER /
SUB-SUPPLIER shall provide pre-witness test data by FAX or e-mail at the time of final confirmation/notification
of the test date.

For any COMPANY identified defects not corrected in a timely manner by SUPPLIER / SUB-SUPPLIER, the
SUPPLIER shall provide a Non-conformance Report which provides the reason for non-conformance and
corrective actions to be taken. Based on applicable codes, standards and specifications, COMPANY shall be the
sole judge of the acceptability of such non-conforming conditions and corrections, and COMPANY decisions shall
be final. The SUPPLIER Non-conformance Reports, that provide a disposition action other than acceptance based
on the original acceptance criteria, shall be accepted by COMPANY prior to proceeding with remedial action.

Where COMPANY inspectors have just cause to suspect the quality of any item, the inspector may require that
additional inspection or testing be performed either by SUPPLIER / SUB-SUPPLIER or by a third party selected
by COMPANY at no extra cost to COMPANY. Prior to this additional inspection or testing, the inspector will so
advise COMPANY or designated representative of the situation.

SUPPLIER shall ensure that all engineering and inspection documentation is readily available to COMPANY
inspectors at SUPPLIER’s / SUB-SUPPLIER’s facility at all times. COMPANY shall have complete access to all
documentation.

SUPPLIER to submit the following documentation:

1. A Project Quality Management Plan aligned with ISO 10005 Quality Management Systems Guidelines
for quality plans.

2. Records of material tests, including PMI, are to be available for review by inspectors at the time of
inspection and are to be submitted at the time of final inspection (documentation to accompany
shipment or otherwise be available for receiving inspection).

3. Welder qualifications and welding procedures that will be used in the performance of Work shall
require COMPANY’s review and acceptance prior to commencing manufacture. Welders shall be
suitably qualified. The requirements for qualification shall be specified and welder records shall be
maintained by SUPPLIER.
4. Special installation procedures and other required fabrication or manufacturing procedures (i.e. those
required for post weld heat treatment, tube rolling, coatings, etc.) that will be used in the performance
of Work shall require COMPANY’s review and acceptance prior to commencing manufacture.
Personnel carrying out special processes (e.g. NDE, welding, coating, and heat treatment) where the
results cannot be fully verified by subsequent inspection and test shall be suitably qualified. The
requirements for qualification shall be specified and personnel records shall be maintained.

5. Instructions and requirements for equipment and materials storage, preservation, and maintenance,
including identification of materials required for preservation and maintenance, are to be provided

Page 25 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

sufficiently prior to receipt (prior to shipment or earlier) to ensure appropriate resources are available
at the time of delivery.

6. Copies of hazardous area third party certificates of testing for every electrical and instrument device
supplied that is required to meet a hazardous area classification.

FUNCTION:-

Witness (W):- 7 Days Written Notice Required.

Hold (H):- 7 Days Written Notification Required / Hold work may not proceed.

Review (R):- Available for Inspection Review at Shop.

Cert's Req'd.:- Manufacturer's Certification Required for Record.

TBA:- To Be Advised.

CRITICALITY & INSPECTION LEVEL:-

Level 1 Resident Inspector(s) - Full Time

Level 2 H & W + Regular Weekly Visits & Final Inspection & Release

Level 3 H & W + 4 In-Progress Visits & Final Inspection & Release

Level 4 Final Inspection & Release Only

INSPECTION & TEST REQUIREMENTS (ITR)

Project DIBI Long Term Facility (DLT) Project Customer Chevron Nigeria Limited

PO Description PO No.

Criticality & Item &


3
Inspection Level Tag No.
Witness

Cert’ s
Req’ d
Review

Item
Hold

Description Remarks
No.

1 Material Chem. Analysis


2 Material Mech. Properties
3 Ferrite Tests
4 Test Pieces
5 Heat Treatment
6 Weld Test / Procedure Qualifications For Weld Repairs.
7 Weld Maps For Weld Repairs.
8 Welder Qualifications For Weld Repairs.
9 NDT Operator Qualifications
10 Radiography Reader Sheet
11 Ultrasonic Report
12 Dye Penetration / Magnetic Particles, etc.

Page 26 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

Witness

Cert’ s
Req’ d
Review
Item

Hold
Description Remarks
No.

13 P.M.I. X X Including Low Alloy


14 Visual Inspection X X X Per Final Inspection
15 Dimensional Inspection X X X Per Final Inspection
16 Polish Surface Finish Test
17 Trial Assembly Match Marking Per Final Inspection
18 Function Test X X X Per Final Inspection
19 Performance Test Procedure Qualifications
20 Performance Test
21 Sequence Test
22 Running Test
23 Post Run Inspection
24 Proof Load Test
25 Resistance / Immersion Test
26 Pressure / Leak Test X X X
27 Spark / Holiday Test
28 Surface Preparation / Paint Thickness X X
29 Packing / Crating / Marking Inspection X X X
30 Shipping Preparation X X
31 Load Out / Tie Down
32 Magnetism Check
33 Hardness Test X X
34 Charpy Impact Test
35 Final Inspection X X X
The above checked items are required when applicable to the individual type of equipment or material being
supplied by the Vendor.

Special Requirements:-
NOTE (1) - Type "B" Material Certification per DIN 50 049M 3.1B attested by Vendor QA Inspector.

NOTE (2) - Refer to Notes in Purchase Order for other required Inspections and Certificates.

All Inspection Procedures / Quality Control Manual and Associated Documentation must be available for Review

EXHIBIT - 12

Page 27 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

TECHNICAL BID EVALUATION CRITERIA (EQUIPMENTS / MATERIALS)

The Technical Bid Evaluation Criteria Form (Doc # DIB-D106-ICS-EVA-CMA-000-90043-00-U01) is attached in this
REQ and it has to be carefully reviewed and completed by BIDDER. Attention is drawn to the notes mentioned in
the Technical Bid Evaluation Criteria Form.

EXHIBIT - 13

Page 28 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

TECHNICAL REQUEST BID SUBMISSION CHECK LIST

Status
S.
Description Yes or Justification for “No”
No.
No or
N/A
EXHIBIT “A”:- GENERAL INSTRUCTIONS
1 Has the BIDDER clearly reviewed all the requirements in this
Exhibit.
EXHIBIT “B”:- COMPANY’s APPROVED MANUFACTURER’s LIST
2 Has the BIDDER clearly reviewed all the requirements in this
Exhibit.
EXHIBIT “C”:- LIST OF SUB-SUPPLIERS / SUB-CONTRACTORS
3 Has the BIDDER clearly reviewed all the requirements in this
Exhibit & submitted in the bid.
EXHIBIT - 1:- SCHEDULE OF QUANTITY
Has the BIDDER clearly reviewed all the requirements in this
Exhibit & submitted in the bid.
4
Has the BIDDER prepared this Exhibit in the Letter Head also as
per 25.6 of Section 2.0 [Instruction To Bidders] & submitted in
the bid.
EXHIBIT - 2:- SPARE PARTS REQUIREMENTS
5 Has the BIDDER clearly reviewed all the requirements in this
Exhibit & submitted in the bid.
EXHIBIT - 3:- UNIT RATES
Has the BIDDER clearly reviewed all the requirements in this
Exhibit & submitted in the bid.
6 Has the BIDDER prepared this Exhibit in the Letter Head also as
per 25.6 of Section 2.0 [Instruction To Bidders] & submitted in
the bid.
EXHIBIT - 4:- DOCUMENTATION PROCEDURE
Has the BIDDER clearly reviewed all the requirements in this
7 Exhibit & submitted in the bid.
Exceptions / modifications (if any) have been clearly stated in
Exhibit - 9 [List of Technical Exceptions].
EXHIBIT - 5:- SUPPLIER DATA REQUIREMENT & SCHEDULE
Has the BIDDER clearly marked the documents that will held the
Work until COMPANY's Acceptance under Column 2 of Exhibit
- 5.
Has the BIDDER identified the documents which are marked by
COMPANY under Column 4 of Exhibit - 5 & submitted in the
8
bid.
Has the BIDDER filled the proposed periods for documentation
submittal under Column 6 of Exhibit - 5.
Has the BIDDER clearly reviewed all the requirements in this
Exhibit, filled, signed & submitted in the bid.
EXHIBIT - 6:- MILESTONE SCHEDULE
9 Has the BIDDER filled the proposed periods for each milestone
under Column 4 of Exhibit - 6 & submitted in the bid.
EXHIBIT - 7:- PROJECT DRAWINGS, DATASHEETS, SPECIFICATIONS ETC.
10 Has the BIDDER clearly reviewed all the requirements in this
Exhibit & submitted in the bid.

Page 29 of 30
CHEVRON NIGERIA LIMITED ` REQUISTION FOR CONTROL VALVES
H2S Solid Bed Scavenger Project EHS-E076-ICS-REQ-CNL-000-90001-00
Revision No.: G01

Exceptions / modifications (if any) have been clearly stated in


Exhibit - 9 [List of Technical Exceptions].
EXHIBIT - 8:- COMPANY SPECIFICATIONS, APPLICABLE CODES & STANDARDS
Has the BIDDER clearly reviewed all the requirements in this
11 Exhibit & submitted in the bid.
Exceptions / modifications (if any) have been clearly stated in
Exhibit - 9 [List of Technical Exceptions].
EXHIBIT - 9:- LIST OF TECHNICAL EXCEPTIONS
12 Has the BIDDER been clearly stated all the Exceptions /
modifications (if any) in this Exhibit & submitted in the bid.
EXHIBIT - 10:- QUALITY PLAN
13 Has the BIDDER clearly reviewed all the requirements in this
Exhibit & submitted in the bid.
EXHIBIT - 11:- INSPECTION AND TEST PLAN
Has the BIDDER clearly reviewed all the requirements in this
14 Exhibit & submitted in the bid.
Exceptions / modifications (if any) have been clearly stated in
Exhibit - 9 [List of Technical Exceptions].
EXHIBIT - 12:- TECHNICAL BID EVALUATION CRITERIA (EQUIPMENTS / MATERIALS)
Has the BIDDER clearly reviewed all the requirements in this
15
Exhibit & included all the requirements in the bid to meet the
Technical Bid Evaluation Criteria.
Note:-
N/A : Not Applicable

Special Notes (If Any):-

Authorized Signatory :

Date :

Name :

Designation :

BIDDER Name :