Professional Documents
Culture Documents
a) 36 months
b) 37 months
c) 48 months
d) 32 months
a) GD test
b) Airflow test
c) Thermal flow test
d) Dye penetration test
a) APH--ID FAN—FDFAN
b) ID FAN—FD FAN--APH
c) FD FAN—ID FAN—APH
d) Any of the above
a) Air Preheaters
b) Air ducts
c) ESP
d) Transformers
1. 10
2. 45
3. 30
4. 40
Q6. Passivation is done to
a) Catalyst
b) Substitute
c) Inhibitor
d) All of the above.
a) Steam Purging
b) Steam puffing
c) Alakali wash out and then acid cleaning
d) Detergent cleaning
a) Acid cleaning
c) Detergent cleaning
d) Water flushing
Q11. Hydro test is generally done at ___________ [1.5 times the design pressure]
Q14. Trial operation of unit is considered successful if the unit runs continuously for _____ days [14]
Q16. The seal oil pressure to the seal is controlled by _________ [DPR]
Q17. Prior to H2 filling in the generator _______ filling is done. [CO2]
b) Electrical
c) Both
Q 19. The two important terms associated with circuit breaker among the following are:
a) 1 & 2
b) 2 & 4
c) 2 & 5
d) 3 & 5
Q 20. The lock out condition of circuit breaker [CB] occurs when :
a) CB breaks
d) CB becomes in-effective
a) <500 ppm
b) >1500ppm
c) 1000ppm
d) Not added
a) <500ppm
b) 500ppm
c) Not added
d) >500pp
Q 23. The acid cleaning of boiler includes which among the following :-
a) 1 & 3 & 5
b) 1 & 2 & 4
c) 2 & 3 & 5
a) Sulphuric acid
b) HCL
d) Nitric acid
Q 26.True or false.
a) Corporate centre
b) Steering committee
c) Working parties
a) Executive concerned
b) Contractor
c) Working parties
a) GM by contractor
b) O&M dept
a) Plant erection
b) Plant commercialisation
c) Plant commissioning
b) DM water with >10 PH and < 150ppm hydrazene and >100 ppm Ammonia
a) Nitrogen
b) Helium
c) Hydrogen
d) CO2
a) GD test
b) At least 8 hours
c) Employing speedometer
c) Will be unchanged
a) NaoH
b) NA2Co3
d) Ca(oH)2
c) Can be both
a) Generator
b) Circuit breaker
c) Transformer
d) Stator windings