You are on page 1of 1

Key Plan - District Key Plan - Plot

District : DE10 Plot ID : DE10-PU-02


A


A

▁▁
669.53
DE10-MUO-05 A
DE10-PU-01 663.82 Gate Levels
A 666.21
DE10-RC-01 A DE10-ED-02 A Gate Level 662.63 m
661.66
A 01
665.63
A A
662.67
DE10-RN-01
665.26 DE10-R-SK-02
A
1
8.4
N N
0 0.5 1 2 0 0.07 0.15 0.3

Sid
34 km km
eC

eD
Q Q

661.42 Sid A
661.82


A Plot Data Notes


663.64

▁▁
A
Land Use Level 1 and Level 1 Code Utility Networks 2200 General
No Notes Notes

185
DE10-HH-01
662.1 A Land Use Level 2 and Level 2 Code Electricity - Primary 114 1 All coordinates are relative to WGS_1984 UTM Zone 38N.

.68
A
DE10-RL-01
659.03 Substation 2 All dimensions are indicated in meters.
659.41 A 3 This sheet provides details for the identified plot only. All details
660.56
A A Land Use Level 3 / Asset Electricity - Primary of other plots should be considered illustrative only.
Description Substation 4 All Levels and coordinates are based on the latest DMP stage
659.03 information and the final levels shall be confirmed with DGDA
A Plot Area (m²) 70,982 upon completion of the detailed design.
658.37
A Max. FAR - 5 The grading level is highest elevation within the plot based on the
657.95 07
current overall grading design. All building heights mentioned are
A Max. Plot Coverage (%) -
9.25

in reference to gate level.


06 DE10-PU-02 02

2
Max. Number of Floors 1 6 Proposed design shall comply with all applicable local authorities’

20.8
regulations. The PRS refers to all mandatory minimum build-to-
03 Max. Building Height (m) 10 lines & setbacks. For further guidance on recommended design
controls and regulations please refer to 'Book-V Development
657.6 657.52 Max. Total Allowable GFA (m²) -
A A Controls'.
Max. Allowable Basement Levels NA 7 Build-To-Line (BTL) refers to the line at which construction of a
657.12 building façade is to occur on a plot. A build-to-line runs parallel
DE10-MUO-06 A GFA Split Max. GFA (m²) Units/Keys
to, and is measured from, the front property line and is
Residential - -
182

established to create a regular building façade line on a street.


656.71
.85

Commercial Office - - 8 The demonstrated building footprint and massing is indicative.


657.02
A A
9 Parking standards are based on DGII Traffic Impact Study.
Commercial Retail - -
Sid

656.62 10 CP are designated car parks that provide parking for two or more
A
eB

eA
Commercial Hotel / Resort - - sub-plots:
Sid - Major Central Car Park (MCCP) provides parking for plots above
Community Facilities - -
656.32 3 656A and public parking for plots within catchment.
A 9.2 Cultural - - - Minor Shared Car Park (MSCP) provides parking for designated
32
plots only.
Sports - - - An ‘Onsite’ CP is located under the sub-plot/plot, and an ‘Offsite’
655.79
DE10-MUO-07
A Recreational - -
CP is located in the adjacent sub-plot/plot.
15.9
9
655.66 05 Parking Development
SNoNotes Notes
A 04 A
655.54 Total Parking Demand 0 1 Plot internal arrangement & development is to be defined by SEC
655.03 National Grid SA.
DE10-RL-02 A N 0 35 70 140 Parking provided on Plot (bays) 0 2 Architectural look and feel for the façade to be as per DGDA
655.1 m Parking transferred to CP (bays) 0 guidelines.
Q
A
On-plot Surface Parking (bays) 0
Plot Coordinate Utility Connections Potable Water Public Drop Off Service Access
Telecom Location Shared Service Access On-plot Basement Parking (bays) 0
Plot Boundary Electrical (Power)
Street Lighting Drop Off Assigned CP Type / Location NA
Developable Plot ICT A Spot Level
Storm Water EVA Routes Mandatory Vehicular Assigned CP Total Bays NA
Privately Owned A Gate Level
Publicly Accessible Sewerage Access Assigned CP no. of Basement Levels NA
Setback Line Back of House
Open Space AWCs Permitted Vehicular Miscellaneous
On-Street Parking Access In-Plot Open Space
Utilities Easement Gas Architectural Character KKR Lamination
Bus Stop Location Pedestrian Access
Access Easement Irrigation Sustainability Rating System LEED C+C Gold; Mostadam
Applied Communities Gold Side
Setback Range Min.
Side
Setback Range Min.
Min. - Max. Built to Line Min. - Max. Built to Line

Asset Staging 0 Side A 0m - No Max. NA Side E

Pt_I Easting
ID Easting Northing
Northing Z Lvl
Gr. ID Easting
Pt_I Easting Northing
Northing Z Lvl
Gr. ID Easting Northing Gr. Lvl ID Easting Northing Gr. Lvl Utility Provision Side B 0m - No Max. NA Side F

01 661,479.70 2,736,624.05 667.19 05 661,242.10 2,736,292.01 655.66 Average Water Provision m³/day - Side C 0m - No Max. NA Side G

02 661,557.59 2,736,455.50 658.04 06 661,165.29 2,736,457.86 657.75 Average Sewage Flow m³/day - Side D 0m - No Max. NA Side H
Signature
03 661,550.76 2,736,435.83 657.74 07 661,169.05 2,736,466.31 657.76 Irrigation Provision m³/day - Rev. Issued by Date
DGDA Jacobs
04 661,257.21 2,736,286.77 655.66 Waste Arising kg/day - 0 Jacobs 16-Jul-2022

Power Provision @ Plot (kVA) 13,842


SNG Gas Provision m³/day -