You are on page 1of 1

1 9 10

A A

77
3.2 37.2

32
32 R 10 103°

150 3.2
6 65
SECTION A-A

O7 DRILL THRU
90v C'SINK TO O14
(02) HOLES

27.5 ±0.1
A A
77
M5 THRU
27.5 ±0.1 (06) HOLES
38.5

25 ±0.1 40 ±0.1
105 ±0.1
35 80 ±0.1 ISOMETRIC VIEW
150 This Drawing is property of Forbes & Company limited & must be returned on request
It must be not used, copied or lent for any purpose without authorization.

All Dimensions are in mm FORBES & COMPANY LIMITED I


NOTE: Signature
B-13, MIDC WALUJ,
CAD SYS :- Creo Date
FOR TAPPING CD, TOLERANCE TO BE MAINTAINED WITHIN u0.1 AURANGABAD - 431133.
FOR FREE HOLE CD, TOLERANCE TO BE MAINTAINED WITHIN u0.2 Drawn :- SSJ 02/01/2020

FOR DOWEL HOLE CD, TOLERANCE TO BE MAINTAINED WITHIN u0.02 Checked :- ABW 02/01/2020
Project No.:- Error: No reference
Approved :- - -
UNSPEFIED TOLERANCES / DEVIATION ANGULAR TOL. Finish :- 150 X 77 X 32 Description:- C-CHANNEL
OVER - 6 30 120 400 1000 2000 - 10° 50° 100°
Machining:- ( )
J TO 6 30 120 400 1000 2000 3000 10° 50° 100° - Drawing / Part No.:- Rev No.:- J
Material :- ALUMINIUM HE30 C-CHANNEL -
DEVIATION ±0.1 ±0.2 ±0.3 ±0.5 ±0.8 ±1.2 ±2 ±1° ±30' ±20' ±10' Weight :- -
REMOVE BURRS, SHARP EDGES & CORNERS Scale:- NTS Projection:- Page No.:- 1 OF 1
IF IN DOUBT, ASK. DO NOT SCALE ALL DIMENSIONS ARE IN mm Rev.No Drawn Checked Description Date Heat Treatment:- - Sheet:-
0.5 X 45°, UNLESS OR OTHERWISE SPECIFIED

1 2 3 4 5 6 7 8 9 10

You might also like