Professional Documents
Culture Documents
Disclaimer
The material, data, charts, pieces and information contained in this pack including market overview,
opportunity scope, spend commitment, Tawteen evaluation process and submission templates (the
“Tawteen Investor Pack”) are for general information purposes only and should not be construed as
investment or commercial advice or as a recommendation whatsoever. The user of the Tawteen
Investor Pack (“Investor”) is responsible for independently verifying the Information and shall make
his own determination as to how suitable the Tawteen Investor Pack is for his own usage and intent.
Whilst Qatar Petroleum reasonably endeavors to provide and keep the Tawteen Investor Pack up to
date and correct, Qatar Petroleum makes no representations or warranty of any kind, express or
implied about the content, correctness, completeness, accuracy, quality, reliability or suitability
with respect to the Tawteen Investor Pack for any purpose. Qatar Petroleum expressly disclaims
liability for errors and/or omissions in the Tawteen Investor Pack contained in this document and
shall in no event be liable for damages resulting from the use or reliance of Investor upon the
Tawteen Investor Pack. Any reliance the Investor of the Tawteen Investor Pack places on such
Tawteen Investor Pack is strictly at Investor’s own risk.
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 2
DRILLING TOOLS AND ACCESSORIES
Foreword
On behalf of the Tawteen program, I would like to congratulate you on being shortlisted as a
potential investor for this investment opportunity. You are hereby invited to proceed to “Application
Stage 2” for this opportunity, which entails you participating in two separate processes as follows:
Please note that the tender from the Leading Contracting Entity will be run through a separate
process. The scope of this document is limited to the submission of your investment proposal. This
document provides you with all the required information to conduct your own feasibility study and
prepare an investment proposal in line with the proposed scope. The information provided in this
pack includes a market overview, scope of the proposed product or service, evaluation approach
and submission guidelines. In addition to this Tawteen Investor Pack, you should have received the
Submission Templates and other supporting documents as mentioned in Section 5.5 of the Tawteen
Investor Pack.
The energy sector companies and our Partners are committed to providing you support towards
your investment in the local supply chain and enrichment of the Qatari business environment. As a
result, the Leading Contracting Entity will be issuing an RfP to support investment in this
opportunity. In addition, QP commits to supporting you via targeted incentives and supplier
development initiatives as outlined in Section 3 of this document.
We hope that this document provides the required guidance necessary for you to begin work on
your investment proposal and we welcome any clarification questions you may have in the coming
weeks.
Sincerely,
Abdulaziz J. Al-Muftah
Executive Vice-President, Industrial Cities
Qatar Petroluem
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 3
DRILLING TOOLS AND ACCESSORIES
Tawteen Partners
Partners
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 4
DRILLING TOOLS AND ACCESSORIES
Table of Contents
2.2 Scope
Incentives & supporting
3 contract
3.1 Incentives
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 5
DRILLING TOOLS AND ACCESSORIES
Tawteen The localization program for Services and Industries in the Energy
Sector that aims to develop the local supply chain
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 6
DRILLING TOOLS AND ACCESSORIES
Closing Date The last date by which the Investor must submit the Investment
Proposal
Submission Templates Data templates in Excel that are required to be completed by each
Investor as part of their final submission
EFSM QP's electronic file system management that will be used to share the
Tawteen Investor Pack with all Investors and for upload of the
documents related to the final submission
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 7
DRILLING TOOLS AND ACCESSORIES
Executive Summary
Tawteen’s Subsurface Cluster covers the equipment and services required for onshore and offshore
drilling workover, steady state production and water injection operations. This Tawteen Investor
Pack presents the opportunity for Investors to establish a local business in providing Drilling Tools
and Accessories in Qatar to support local oil and gas drilling and fishing activities.
Tawteen aims to localize the provision of the most frequently used Drilling Tools and Accessories,
including tools for fishing operations. This is envisioned to cover the leasing of drilling and fishing
tools used in various operations.
As such, Tawteen aspires for the Investor to develop the following local assets and capabilities:
Tawteen’s participating oil and gas operators estimate ~ QAR 35 M per annum to be spent on
Drilling Tools and Accessories in onshore and offshore fields, for the coming 4 years. This estimate
includes planned spend for drilling Bottom Hole Assemblies (BHAs), as well as a historical average
of actual unplanned contingency spend on fishing operations. Please note that all the estimates
provided in this section are based on analyses conducted prior to the COVID-19 crisis and drop in
oil prices.
To support the investment in this opportunity, the Leading Contracting Entity (Qatargas) will issue an
RfP to all the short-listed Investors. This opportunity will be further supported by a Supporting
Contracting Entity (NOC). Collectively, commitments from these entities will cover a combined total
of ~ QAR 5-7 M of spend on Drilling Tools and Accessories for 4 years. In addition, Tawteen will
provide various incentives across financing, infrastructure and supplier development as further
outlined in this document.
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 8
DRILLING TOOLS AND ACCESSORIES
Table of Contents
2 Scope of opportunity
4 Evaluation
5 Appendix
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 9
DRILLING TOOLS AND ACCESSORIES
Opportunity
The objective of this opportunity is to support the establishment of a local company to provide key
Drilling Tools and Accessories, including tools for fishing operations. The new business is envisioned
to provide the opportunity of leasing locally owned drilling and fishing tools used both in drilling
activities such as Bottom Hole Assemblies (BHAs) and contingent activities such as fishing of a “fish
or barrier” (this could be done using a drill pipe, coiled-tubing or slickline). As such, the Investor
would develop in-country capabilities to:
– Possess an inventory of drilling and fishing1 tools of most common types and sizes
– Operate workshop facilities for minor fabrication as well as tool modification and maintenance
– Develop local experienced crew available for fishing services on short notice
In the longer term, it is expected that the Investor will provide cost competitive Drilling Tools and
Accessories, including tools for fishing operations. The Investor will also explore adjacencies in
renting further tools and equipment used at ad-hoc basis such as inflatable packers and bridge
plugs. The capabilities are anticipated to reach beyond Qatar, covering other addressable markets
in the wider region.
1 Common fishing tools, as identified on the basis of experience of the provider or as requested by end-user
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 10
DRILLING TOOLS AND ACCESSORIES
In Qatar, the average spend on Drilling Tools and Accessories in onshore and offshore fields is
expected to be ~ QAR 35 M per annum for the coming 4 years. Please note that all the estimates
provided in this section are based on analyses conducted prior to the COVID-19 crisis and drop in
oil prices. The spend is mainly driven by:
– 20 rigs active during 2020-24, forecast to complete ~ 100 new onshore and offshore wells
– ~ 4 active workover rigs deployed throughout 2020-24
Today, Drilling Tools and Accessories are mostly supplied by international companies. A local
provider focused on serving Qatari operations could improve operational efficiency of operators and
as such develop a competitive edge.
Strategic fit
This Tawteen opportunity is aligned with individual energy sector companies’ operating strategies,
and the strategic interests of Qatar and its economy.
National − Attract white collar1 labor in specialized oil and gas services
Interest
− Increase in-country spending on locally-owned assets and reinvestment
− Reduce dependence on international supply chains and collaborations
1 Class of employees known for earning higher average salaries (> QAR 10,000) and doing highly skilled work
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 11
DRILLING TOOLS AND ACCESSORIES
▪ Standard Drilling Tools and Accessories such as drilling jars, drill subs,
X-overs, accelerators, bumper subs etc.
In-country assets:
▪ Fishing tools such as grapples, spears and over-shots that are suitable
- Facilities for catching and recovering lost-in-hole and stuck equipment.
- Equipment
▪ Milling tools such as mills, reamers, etc.
▪ Workshop facility for minor fabrication as well as tool modification and
maintenance
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 12
DRILLING TOOLS AND ACCESSORIES
Table of Contents
1 Opportunity overview
2.2 Scope
Incentives & supporting
3 contract
4 Evaluation
5 Appendix
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 13
DRILLING TOOLS AND ACCESSORIES
The estimated spend on Drilling Tools and Accessories in onshore and offshore fields is ~ QAR 35
M per annum based on estimates from the three major entities mentioned above. Additional
business could be generated from other operators in Qatar. Please note that all the estimates
provided in this section are based on analyses conducted prior to the COVID-19 crisis and drop in
oil prices.
Spend estimate on Drilling Tools and Planned number of new wells1
Accessories1 QAR M, forecast #, forecast
Contingency (fishing) Planned (drilling) Onshore Offshore
39 39 39 117 117
35 105 105
Ø 35 31 31 86 46 46 77
25 25 25 48 44
25 40
25 25 40
57 71 71 61
18 18 19 46 37
11 15 10
2019 20 21 22 23 2024 2019 20 21 22 23 2024
Onshore 6 6 7 7 5 5
Offshore 14 17 17 17 18 7
2019 20 21 22 23 2024
▪ Spend per rig and well is not constant due to utilization and nature of jobs
▪ Above estimates are based on current (2019) projected drilling and surveillance activities
of Qatar Petroleum, Qatargas and NOC, and are subject to change
▪ In addition 3-4 workover rigs are estimated to be in operation in Qatar during 2020-24
1 Estimated spend based on data provided by Qatar Petroleum, Qatargas and North Oil Company
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 14
DRILLING TOOLS AND ACCESSORIES
This information provides a starting point for estimating the investment size and conducting market
research on sourcing the appropriate equipment types. The well profiles below conveys a view of
the majority of wells and are subject to operator field development changes.
Well Type #1 Well Type #2 Well Type #3 Well Type #4 Well Type #5
16” 22" 16” or 17-1/2” 22” 24”
Hole sizes 12-1/4” 16” 12-1/4” 16” 17 1/2”
(excluding 8-1/2” 12-1/4” 8-1/2” 12-1/4” 12-1/4”
conductor 8-1/2” 8-1/2” 8-1/2”
section)
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 15
DRILLING TOOLS AND ACCESSORIES
2.2 Scope
This section provides an initial high-level description of the scope of services expected to be
delivered by the Investor in support of the feasibility studies and initial business cases in the
Investment Proposal. A subsequent RfP from the Leading Contracting Entity will provide a final and
detailed description of the primary scope of this opportunity.
Out of scope
In Scope
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 16
DRILLING TOOLS AND ACCESSORIES
Table of Contents
1 Opportunity overview
2 Scope of opportunity
4 Evaluation
5 Appendix
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 17
DRILLING TOOLS AND ACCESSORIES
A. Land
Tawteen, through various stakeholders, has secured plots of land for every investment opportunity.
As an Investor with an allocated opportunity, you would have access to the following land entities
listed here and shall:
• Have access to pre-approved land
• Have building and work permit regime directly managed by the Free Zone Authority (FZA)
• Get 0% corporate tax for renewable 20-year periods
• Have 100% foreign ownership
• Get flexible foreign workforce visa regime & best practice employment regulations
• Have zones that are strategically located in Doha and are adjacent to the Airport and Port
For further details, please refer to the Information Pack from the FZA.
B. Financing
As a potential Investor, you would have access to the financial institutions listed here for financing
your loan requirements. These institutions are supporting Tawteen in providing various financing
options with preferential terms around the following elements:
• Leverage
• Tenure
• Interest Rate
• Fees (on loan amount)
For additional information, please contact the financial institutions at the details provided below:
1. QNB: Qatada Rababa: +974 4496 3266 / 7766 7071, Subhi Ghazal: +974 4496 3214 / 3327 6868,
Sami Maliki Elbitar: +974 4496 3223 / 5079 4880
2. QDB: Please visit www.qdb.qa/en/products-services
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 18
DRILLING TOOLS AND ACCESSORIES
C. Equity Financing
Equity financing involves raising money by offering portions of your company, called shares, to
Investors. It is a common way for raising capital by selling company shares to Investors.
For a minority stake, Qatar Development Bank (QDB) is offering equity financing options for
Investors:
• An investment cap of QAR 7 M for existing companies with less than 3 years of audited financials
• An investment cap of QAR 18 M for existing companies with 3 years or more audited financials
To apply for QDB equity funding, please visit https://www.qdb.qa/en/products-services and follow
the steps below:
Visit Product & Services Fill in the application and Based on your request,
webpage and select “Apply attach the required select “SME Equity” or
Now” in the top right corner documents “Seed Funding”
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 19
DRILLING TOOLS AND ACCESSORIES
D. Supplier Development
Tawteen’s Supplier Development Program aims to support Tawteen suppliers in enhancing their
performance and ensuring that they are able to meet the demands of the energy sector.
All successful Investors can benefit from the Supplier Development Program. This also includes
Investors who are allocated an opportunity without a Supporting Contract or Investors who already
have their own land / facilities.
The Supplier Development team will work closely with Tawteen suppliers and provide guidance
across the following areas (where applicable):
The Supplier Development Program will be offered by QP on a “reasonable efforts” basis only, and subject to availability. QP makes no representations or
warranties regarding the Supplier Development Program (including that it will result in any particular outcome). QP shall not, in any case, be responsible for
any loss, damage or claims arising from, incidental to or connected with the Supplier Development Program and/or the reliance or use of any information or
recommendation thereunder, or decision taken on the basis thereof by any person.
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 20
DRILLING TOOLS AND ACCESSORIES
For this opportunity, there will be an RfP from the Leading Contracting Entity to support the
establishment of a local supplier. Every short-listed Investor shall be invited to submit a tender
response, which shall be evaluated on a competitive basis. The winning Investor who is awarded the
commitment from the Leading Contracting Entity shall later be invited to participate in a “single
source” tender from the Supporting Contracting Entity. The Investor shall be evaluated, technically
and commercially, before being awarded the remaining portion of the commitment.
Leading Supporting
Contracting Contracting
Entity* Entity**
* The information provided in this section is indicative only. Exact details of the Supporting Contract and associated spend
commitment will be released by the respective Leading Contracting Entity through the tender / RfP.
** SoW for the commitment from these entities have been shared with the Investor Pack materials you shall receive
through EFSM.
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 21
DRILLING TOOLS AND ACCESSORIES
Table of Contents
1 Opportunity overview
2 Scope of opportunity
5 Appendix
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 22
DRILLING TOOLS AND ACCESSORIES
Tender clarifications (as per ▪ Seek clarifications to refine tender response and
the timeline set by the Leading Investment Proposals
Contracting Entity)
Note: Invitation for the tender shall be sent directly to the shortlisted investors by the Leading Contracting Entity providing the Supporting Contract
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 23
DRILLING TOOLS AND ACCESSORIES
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 24
DRILLING TOOLS AND ACCESSORIES
Investment Investment
Proposal Proposal
Response from evaluation
investors to Based on a certain
Tawteen Investor evaluation
Pack framework and
criteria
Final Award
across
opportunities
Tender Tender
Response from evaluation
investor to Leading on lowest price,
Contracting Entity technically
RfP compliant bid
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 25
DRILLING TOOLS AND ACCESSORIES
Criteria What will be assessed? What must the investment proposal include?
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 26
DRILLING TOOLS AND ACCESSORIES
Criteria What will be assessed? What must the investment proposal include?
Does the investor Please note that each financial institution has its own
Access to
have access to process to evaluate and issue such documents. The
financing
financing? timelines can vary from bank to bank but we estimate
it to take a few weeks. So, we strongly recommend, if
you are an investor seeking a financial loan, that you
start engaging with your preferred financial
institution early on in the process.
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 27
DRILLING TOOLS AND ACCESSORIES
▪ Investment Proposal
▪ Bank letter and supporting documents to demonstrate access to funds for the investment
required (see details in Section 5.5)
▪ Power of Attorney - required only in case person signing the submission documents is not
the Investor himself/herself (for Individuals) or is not an authorized signatory as per the
Commercial Registration (for Companies).
Separately, you are also required to submit hard copies of the following documents (These can be
submitted in person or by using your preferred mailing service even after the submission deadline
mentioned above and once the Tawteen Service Centre is operational. We shall send you a
separate notification once the Tawteen Service Centre resumes normal operations):
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 28
DRILLING TOOLS AND ACCESSORIES
Please refer to the detailed Instructions to Investors in Section 5.5 for further information.
All queries and communication pertaining to Tawteen Investor Pack must be raised by the
Designated Contact Person and not by third party consultants. Queries must not be raised by
telephone or personal contact, but must be submitted in writing using Investor Queries (see Form 2
in Appendix), via email to the to the following address: subsurface_tawteen@qp.com.qa
Separately, you are required to submit the tender responses to the respective Leading Contracting
Entity as per the tender guidelines. Deadline for submission will be as per the guidelines within the
RfP.
In the event, that you'd like to include out-of-scope items and adjacencies in your investment
proposal, kindly follow the guidelines stipulated in Section 5.3 of this document.
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 29
DRILLING TOOLS AND ACCESSORIES
Table of Contents
1 Opportunity overview
2 Scope of opportunity
4 Evaluation
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 30
DRILLING TOOLS AND ACCESSORIES
Cover Page
Submission date
Table of
Main sections of the study with page numbers
Contents
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 31
DRILLING TOOLS AND ACCESSORIES
Demand:
• Total market size incl. export potential (list assumptions)
• Demand drivers
Market • Expected market trends over the period of financial projections
Assessment
Supply:
• Overview of current players fulfilling demand – local & international
• Competitors’ comparative analysis
• Investor’s competitive advantage / positioning
• Market share assumptions & justifications over the period of financial
projections
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 32
DRILLING TOOLS AND ACCESSORIES
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 33
DRILLING TOOLS AND ACCESSORIES
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 34
DRILLING TOOLS AND ACCESSORIES
General
▪ Tab “General information” ▪ Template for opportunity and investor/
company information
information
▪ Contact person details
Compliance
▪ Tab “C1 – Regulatory bodies ▪ Template for list of regulatory entities
with regulations
consulted” consulted
▪ Tab “C1 – Compliance form” ▪ Template for signed declaration
Meeting the ▪ Tab “C2 – Meeting the scope” ▪ Template for confirmation that the
scope investment proposal meets the scope
objectives
Meeting the ▪ Tab “C3 – Localization metrics” ▪ List of metrics that are aligned with the
localization goals of localization
objectives
▪ Tab “C5 – Market Assessment” ▪ List of elements that help assess the
Financial ▪ Tab “C5 – Financial commercial feasibility of the proposed plan
feasibility and projections” ▪ Template for 5 year financial projections
strength ▪ Tab “C5 – Financial metrics” ▪ List of metrics that will help assess the
financial strength of the proposed plan
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 35
DRILLING TOOLS AND ACCESSORIES
If an investor wishes to go beyond the scope outlined in the Tawteen Investor Pack, in order to
achieve cost synergies or then improve the financial attractiveness of the proposed investment, we
suggest that the Investor follows these guidelines:
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 36
DRILLING TOOLS AND ACCESSORIES
Below is a typical list of entities that the Investor is expected to consult, as a starting point. This is
not meant to be an exhaustive list of entities and is to be used for guidance only. The Investor is
expected to conduct own research and approach/consult with the various regulatory bodies to
understand their requirements. Your responses need to be documented in the relevant sections of
the Submission Templates as described in Section 5.2.
Ministry of Ministry of
Commerce Qatar Free Ministry Municipality & Qatar
Investment elements & industry Zone of Interior Environment MOTC Petroleum
(Foreign) Investment
Restrictions
Ownership and
Company structures
Taxation
Land ownership
Permits and
Environmental
regulations
Product registration
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 37
DRILLING TOOLS AND ACCESSORIES
In this ITI all capitalized words and expressions shall have the same meanings as are assigned to
them in the Glossary of Terms in the Tawteen Investor Pack.
On receipt of these documents, each Investor is required to submit, within two (2) weeks, the
Acknowledgement of Receipt of Tawteen Investor Pack (Form 1). QP is issuing the Tawteen Investor
Pack and supporting documents in electronic format only. The Investor must ensure that the
documents received are complete and the Investor must sign and return this form. Form 1 must be
completed, signed and submitted by the Designated Contact Person via email to the official email
address set out in Item 5.1 of this Section.
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 38
DRILLING TOOLS AND ACCESSORIES
Signed,
“Designated Point of Contact”
Name:
Position:
Company:
Contact E-Mail address:
Telephone:
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 39
DRILLING TOOLS AND ACCESSORIES
5.3 Any addendums or clarifications will be issued as Bulletins and sent to all Investors during the
”Application Stage 2” process. Investor shall acknowledge the receipt of all Bulletins in the Cover
Letter for Investment Proposal (Form 3). Bulletins shall be issued to the Investor or Designated
Contact Person via email.
6- Governing Language
Investment Proposal and all communication must be in English.
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 40
DRILLING TOOLS AND ACCESSORIES
▪ Bank letter and supporting documents to demonstrate access to funds for the investment
required
▪ Power of Attorney - required only in case person signing the submission documents is not
the Investor himself/herself (for Individuals) or is not an authorized signatory as per the
Commercial Registration (for Companies).
Separately, you are also required to submit hard copies of the following documents (These can be
submitted in person or by using your preferred mailing service even after the submission deadline
mentioned above and once the Tawteen Service Centre is operational. We shall send you a
separate notification once the Tawteen Service Centre resumes normal operations):
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 41
DRILLING TOOLS AND ACCESSORIES
7.2 Investment Proposal: Investor must follow the structured guidelines available in Section 5.1 of
the Tawteen Investor Pack to complete the Investment Proposal.
7.3 Submission Templates: Investor is required to submit the completed Submission Templates
along with the Investment Proposal. Please refer to Section 5.2 of the Tawteen Investor Pack for
more details on the components of the Submission Templates.
7.4 Cover Letter for Investment Proposal: Investor shall complete and sign the Cover Letter for
Investment Proposal (Form 3). QP may reject any Investor that has not submitted Form 3.
7.5 Declaration of Regulatory Compliance: Investor is required to complete and sign the
Declaration of Regulatory Compliance to comply with the requirements brought forward by the
consulted regulatory bodies. Please refer to Section 5.4 of the Tawteen Investor Pack for more
details.
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 42
DRILLING TOOLS AND ACCESSORIES
Please note that each financial institution has its own process to evaluate and issue such
documents. The timelines can vary from bank to bank but we estimate it to take a few weeks. So, we
strongly recommend, if you are an investor seeking a financial loan, that you start engaging with
your preferred financial institution early on in the process.
7.7 Letter of Undertaking: Investor must abide by the terms of the Letter of Undertaking included
with the Tawteen Investor Pack and mentioned in Item 2. This must be completed and signed by the
Investor (Individual/Company) or a duly authorized representative.
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 43
DRILLING TOOLS AND ACCESSORIES
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 44
DRILLING TOOLS AND ACCESSORIES
7.10 Please note that the Power of Attorney (PoA) is only required in the event that the person
signing the submission documents is not the Investor himself/herself (in case of individuals) or is not
an authorized signatory as per the Commercial Registration or equivalent (in case of Companies).
In case a PoA is applicable to your situation, then please follow the guidelines below:
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 45
DRILLING TOOLS AND ACCESSORIES
7.11 Hard copies of the requested documents must be submitted to the following address:
7.12 Any electronic submissions received after the Closing Date may be rejected.
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 46
DRILLING TOOLS AND ACCESSORIES
Tawteen Investor Pack Document Number : <Insert number mentioned on the pack>
We hereby acknowledge having received the Tawteen Investor Pack and supporting documents for
the above mentioned opportunity in electronic format. We furthermore confirm that we have used
the electronic version of the Tawteen Investor Pack and supporting documents on an ‘as is’ basis,
without making any alterations or amendments thereto whatsoever and advise you:
• * that the Tawteen Investor Pack and supporting documents were received in good order and
that we intend to complete and submit the Investment Proposal in accordance with the Tawteen
Investor Pack and supporting documents
• * that the Tawteen Investor Pack and supporting documents are incomplete and request the
following:
• * that we are unable to complete the Investment Proposal and therefore wish in this instance to
decline to respond.
Our representative for further contact in connection with this investment opportunity is
Mr : .………………………………….
Signed : ……………………………………………………………………….
Name : ……………………………………………………………………….
Position Held : ……………………………………………………………………….
On behalf of : ……………………………………………………………………….
Company : ……………………………………………………………………….
Address : ……………………………………………………………………….
Facsimile : ……………………………………………………………………….
Telephone : ……………………………………………………………………….
Country : ……………………………………………………………………….
Date : ……………………………………………………………………….
Notes :
* Delete whichever is not applicable
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 47
DRILLING TOOLS AND ACCESSORIES
Page No. /
# Description of query
Section
..
..
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 48
DRILLING TOOLS AND ACCESSORIES
Dear Sirs,
1. Having carefully examined the Tawteen Investor Pack for the investment in the above named
opportunity, we the undersigned offer to invest in the opportunity in conformity with the above
referred Tawteen Investor Pack.
2. The following documents are uploaded herewith, on the EFSM portal:
a) Investment Proposal
b) Completed Submission Templates
c) Signed Cover Letter for Investment Proposal
d) Declaration of Regulatory Compliance
e) Bank letter and supporting documents
f) Signed Letter of Undertaking
g) Signed Investment Undertaking Letter
h) Company related documents
i) Power of Attorney
j) Any other documents to support the submission:
i) ………………………………………….
3. We acknowledge receipt of the following Tawteen Investor Pack bulletins/meetings and these
have been considered in our Investment Proposal preparation:
Ref. No. Subject Date
…………………………. .......................................... ...........................
…………………………. .......................................... ...........................
…………………………. .......................................... ...........................
4. This Investment Proposal shall remain valid for a period of 180 calendar days from the
submission date for completed Investment Proposals.
Signed : ………...……………………… Date : …………………...…………..
Name : ……………..…………………
(AUTHORISED SIGNATORY)
Position : ……………..………………… Company : ………………………...….
Address : ………………..……………… (Company Seal) : ………………….….
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 49
DRILLING TOOLS AND ACCESSORIES
www.tawteen.com.qa info@tawteen.com.qa +974 40136477 Qatar Navigation Tower, Annex Building, 6th Floor 50