You are on page 1of 154

QATAR GAS OPERATING

COMPANY LIMITED

PROVISION OF FISHING &


DRILLING TOOLS RENTAL
SERVICES - TAWTEEN
PROJECT

TENDER NO.
LTC/C/SDC/4920/20OI:
SC-PC-SC-660-A

STARK TRADING AND MACHINERY WLL


JUNE 10th 2021
COMMERCIAL PROPOSAL
Table of Contents

1 COVER LETTER ............................................................................................................. 1

2 OFFER LETTER.............................................................................................................. 3

3 COMPENSATION AND PRICE TABLE .......................................................................... 6

4 LIST OF EXCEPTIONS................................................................................................. 71

5 PRICE BOOK ................................................................................................................ 77


.

1 COVER LETTER

1 COVER LETTER
Page 1 All Rights Reserved
Confidential and Proprietary
Reproduction by Permission
To Date: 10th June 2021
QATAR GAS OPERATING COMPANY LIMITED
Supply Department
P.O. Box 22666
Doha, Qatar

Kind Attn: Hemendra Bul - Senior Contracts Analyst

Subject Ref: LTC/C/SDC/4920/20: PROVISION OF FISHING AND DRILLING TOOLS RENTAL SERVICES

Dear Sir,

Stark Trading & Machinery WLL (STARK) thanks and appreciates Qatar Gas Operating Company Limited for providing the opportunity to
participate in this subject tender. STARK with the support and co-operation of its above project partner - Wellbore Integrity Solutions Trading
(WIST) Qatar, is pleased to propose quality products and services to support your operations in Qatar for the TAWTEEN Project.

STARK and WIST had entered into an exclusivity agreement under which STARK will function as an exclusive representative of WIST for the
Tawteen project.

About Wellbore Integrity Solutions (WIS)

Wellbore Integrity Solutions LLC (WIS) has recently acquired the worldwide Fishing & Milling and DRILCO Tubular businesses of Schlumberger
for approximately USD 400Million. Accordingly, all the assets of Schlumberger under those product lines including equipment; machinery;
expertise, manufacturing facilities, knowledge, design, brands, patents, intellectual property etc. have also been acquired by WIS. STARK will,
with the support of WIST provide a comprehensive suite of products and services for Fishing and drilling tools rental services.

Since the closing, WIS has transitioned over 900 of the 1000 employees that are coming over from Schlumberger to WIS. These employees
represent over 49 nationalities and are engaged and committed to ensuring the quality services which
Qatar Gas Operating Company Limited can rely upon from the erstwhile Schlumberger set up. Currently WIS operates in 30 countries across
the globe.

In addition, the process of integrating all the engineering, operations, manufacturing, and quality management to support the business is
complete. We are also pleased to inform that American Petroleum Institute (API) have since transferred the API Certification to WIS for our US
Operations including our manufacturing facility at Houston Texas which has also been granted ISO 9001 Certification. We are also glad to
inform that WIS has since been granted the API Q1 spec certificate.

Wellbore Integrity Solutions Trading – Qatar is currently associated with Qatar Gas Operating Company Limited to execute a similar project
and as such has hands on experience to cater to its requirements for flawless execution of the above project should we be awarded. In
addition to the above, Wellbore Integrity Solutions Trading Qatar is also currently associated with executing similar projects for Qatar
Petroleum, North Oil Company – Qatar and Qatar Shell thus clearly demonstrating our technical and operational capability. We are very
confident that our association with Wellbore Integrity Solutions Trading – Qatar will hold us in good stead to embark on similar Tawteen
projects based on the above experience of our partner.

We look forward to fostering a mutually beneficial working relationship with an esteemed company like Qatar Gas Operating Company
Limited to become a partner of choice and contribute as a team for success in your projects.

Should you require any further clarifications or information, please do not hesitate to contact us.

Yours Faithfully,

NAYEF MOHAMED A Z AL-MAHMOUD


Owner / Manager
Authorized Signatory

P.O Box: 35163, Doha – Qatar. Tel: +974 31006039


.

2 OFFER LETTER

2 OFFER LETTER
Page 3 All Rights Reserved
Confidential and Proprietary
Reproduction by Permission
‫سـتارك للـتجـارة والـمـعـدات ذ م م‬
Stark Trading and Machinery W.L.L

OFFER LETTER

Qatar Gas Operating Company Limited Date: 10th June 2021


P.O. Box 22666
Doha - Qatar

For the attention of: The Secretary – Limited Tender Committee

SUBJECT: TENDER ENQUIRY NO. LTC/C/SDC/4920/20 FOR PROVISION OF FISHING


AND DRILLING TOOLS RENTAL SERVICES

1. Having carefully examined all the Tender Document (Tender Enquiry# LTC/C/SDC/4920/20) as
per your Tender Invitation letter dated 04 February 2021, and any Addenda thereto, we the
undersigned offer to provide the FISHING AND DRILLING TOOLS RENTAL SERVICES as
required under the Tender Document, within the sum and rates quoted by us under duly completed
Attachment C and as per the required time schedule indicated under the Tender Document.

2. We further confirm that we thoroughly examined the working conditions at Doha, Ras Laffan and other
areas for our services and the conditions specified by COMPANY and impact of these on our costs
and we have prepared our Bid-Offer after taking due cognizance of such impacts.

3. We confirm that our Bid-Offer is valid, shall not be rescinded and is open for COMPANY’S
acceptance for Two hundred and seventy (270) calendar days from Tender Closing Date i.e. our Bid-
Offer is open for COMPANY’S acceptance until 7th March 2022.

4. An original Tender Bond for QAR 247,000/- (Two Hundred Forty-Seven Thousand Qatari Riyals)
in accordance with the form provided in Tender Document shall be provided during the Evaluation
stage

5. We confirm that rates quoted under Attachment C, Compensation and Payment are fixed and are not
subject to any change during the validity of Tender and during subsequent CONTRACT execution as
applicable.

6. Unless and until a formal CONTRACT is prepared and executed by COMPANY, this Bid-Offer along
with any written acceptance of the terms thereof by COMPANY shall constitute a binding
AGREEMENT between COMPANY and us.

7. We understand that COMPANY is not bound to accept the lowest or any Bid-Offer received by it, nor
to give any reason or explanation for rejection of any Bid-Offer.

8. We acknowledge and accept that COMPANY may publish the name of the successful
CONTRACTOR with the award price information on the COMPANY website or in any public media.
Further such publications shall not be deemed as a breach of any confidentiality obligations by
COMPANY.

P.O Box: 35163, Doha – Qatar. Tel: +974 31006039


‫سـتارك للـتجـارة والـمـعـدات ذ م م‬
Stark Trading and Machinery W.L.L

9. In case of contract award, the CONTRACT shall be issued in the following name: Contractor

Name in full: STARK TRADING AND MACHINERY WLL


Address: P.O.BOX -35163, DOHA -QATAR.

Registered under the Laws of: Qatar


Company Registration No: 98154
Name of Authorised Signatory: Nayef Al Mahmoud

COMPANY Vendor No: ......................................... (Applicable only if worked with COMPANY before)

Dated this 10th Day of June 2021

Signature(s)
Name(s) Nayef Al Mahmoud

in the capacity of Owner / Manager


duly authorized to sign Tenders

For and on behalf of

Messrs: STARK TRADING AND MACHINERY WLL


Business Address: P.O.BOX -35163, DOHA -QATAR.
Witness Signature

Name & Address: Aneesh George


Managing Director
STARK WLL - Oil & Gas Services
GBC, 4th floor, C-Ring Road
PO Box 35163, Doha -QATAR.

P.O Box: 35163, Doha – Qatar. Tel: +974 31006039


.

3 COMPENSATION AND PRICE TABLE

3 COMPENSATION AND PRICE TABLE


Page 6 All Rights Reserved
Confidential and Proprietary
Reproduction by Permission
Classification: Confidential

CONFIDENTIAL

QATARGAS OPERATING COMPANY LIMITED

TENDER ENQUIRY NO. LTC/C/SDC/4920/20

FOR

PROVISION OF FISHING AND DRILLING TOOLS RENTAL SERVICES

ATTACHMENT C
COMPENSATION AND PAYMENT
(Revision 1)
Classification: Confidential

CONFIDENTIAL

ATTACHMENT C

COMPENSATION AND PAYMENT

TABLE OF CONTENTS

PART 1 GENERAL
PART 2 RATES OF PAYMENT
PART 3 ADDITIONAL SERVICES
PART 4 PRICE BOOK / THIRD PARTY EQUIPMENT AND SERVICES
PART 5 PRICE ADJUSTMENT FOR OPTIONAL CONTRACT EXTENSIONS
PART 6 VOLUME DISCOUNTS

Tender Enquiry No. LTC/C/SDC/4920/20 Page 2 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

PART 1 - GENERAL
1.0 PURPOSE AND SCOPE
This Attachment contains the CONTRACTOR’s rates of payment for provision of GOODS,
CONTRACTOR EQUIPMENT, Services and CONTRACTOR PERSONNEL necessary to perform
Fishing and Drilling Tools Rental Services to support COMPANY’s drilling, completion and
work-over programs in Qatar.
1.1 FORM OF CONTRACT INSTRUCTION
1.1.1 A request for GOODS, CONTRACTOR EQUIPMENT, Materials and/or Services and
CONTRACTOR PERSONNEL to be provided and/or WORK to be performed pursuant to this
CONTRACT shall be in writing by an INSTRUCTION TO PROCEED (ITP) on call-off basis.
1.1.2 If the charges for the requested goods, equipment, materials, personnel and/or services, and/
or work have not been specified in Attachment C, then any request for such goods, equipment,
materials, personnel and/or services and/or work shall be made effective by a CHANGE ORDER
(“CO”), executed by the duly authorized REPRESENTATIVES of the PARTIES hereto provided
however, such issuance is not conflicting with the CO requirements. The CO shall state the
scope of the WORK including the GOODS, CONTRACTOR EQUIPMENT, Materials required, the
Services to be provided/WORK to be performed, the WORK SITE, the CONTRACTOR
PERSONNEL required, the delivery and/or mobilization/delivery date, rates that will apply,
costs that will be reimbursed to CONTRACTOR by COMPANY, and any other pertinent details
with respect to the WORK.
1.1.3 The general terms and conditions of this CONTRACT shall apply to all of the INSTRUCTIONS TO
PROCEED. Should there be a conflict between the ITP and the CONTRACT/Attachment C, the
CONTRACT shall prevail. The WORK specified in any ITP shall be considered to be within the
scope of this CONTRACT.
The ITP shall be used for communicating COMPANY requirements to CONTRACTOR that will
include the following:

INSTRUCTION TO PROCEED:
(i) Commitment for any WORK that is covered (specified and priced) in this CONTRACT.
(ii) Commitment for any third party items or items from CONTRACTOR’s Price Book in relation
to WORK but that are not covered under Scope of WORK or specified in Attachment C of
this CONTRACT.
(iii) Any modification made to above commitment.

CHANGE ORDER:
(i) Scope of WORK / Services that is not covered (specified and priced) in this CONTRACT.
(ii) Any modification made to above.
(iii) Incorporate other mutually agreed amendments
(iv) Exercise any options included in the CONTRACT.
(v) Incorporate approved Procedures into the CONTRACT.
Tender Enquiry No. LTC/C/SDC/4920/20 Page 3 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

1.2 CONTRACTOR MOBILIZATION AND DEMOBILIZATION


1.2.1 Unless clearly stated otherwise in the CONTRACT, CONTRACTOR rates shall include
mobilization charges to COMPANY’s BASE or in the case of CONTRACTOR PERSONNEL, to Doha
Heliport or as otherwise directed, as per Article 1.1 of CONTRACTOR EQUIPMENT, materials,
other services, reimbursable cost items, and items not specified in the CONTRACT.
Mobilization includes but is not limited to supervisory support, administrative support,
transporting, and making available CONTRACTOR EQUIPMENT required to perform the WORK.
1.2.2 Unless clearly stated otherwise in the CONTRACT, CONTRACTOR rates shall include
demobilization charges of CONTRACTOR EQUIPMENT, CONTRACTOR PERSONNEL, materials,
other services, reimbursable cost items, and items not specified in the CONTRACT.
Demobilization includes but is not limited to any and all costs and expenses incurred by
CONTRACTOR from the date the items are released by COMPANY REPRESENTATIVE to remove
all of CONTRACTOR EQUIPMENT, CONTRACTOR PERSONNEL, materials, other services,
reimbursable cost items, and items not specified in the CONTRACT from the COMPANY BASE.
1.3 GENERAL PRICING TERMS AND CONDITIONS
1.3.1 Payment in accordance with this Attachment C shall cover the performance of all obligations
and duties of CONTRACTOR under the CONTRACT and as per ITP, and / or CO. No claim for
any other sum additional to the prices and rates specified in the CONTRACT shall be made by
CONTRACTOR, unless otherwise agreed as per Article 1.1 of this Attachment C.
1.3.2 Notwithstanding the prices and rates specified in Attachment C, Compensation and Payment,
COMPANY shall have the right, at its sole discretion, to require CONTRACTOR to supply ad-hoc
services not included in the CONTRACT, but listed in CONTRACTOR's catalogues of services
and their respective regional price list (Price Book), as and when required by COMPANY less
the applicable discount.
1.3.3 In the event that COMPANY exercises its right, in accordance with Article 1.3.2, to avail WORK
contained in CONTRACTOR's Price Book, any general terms and conditions that form part of
the catalogue and/or price list shall not be applicable and the terms and conditions of the
CONTRACT shall govern the performance of the WORK.
1.3.4 All amounts expressed in the CONTRACT shall mean Qatari Riyals (QAR) unless the amounts
are specifically expressed to be in another currency.
1.3.5 No adjustment to the prices and rates shall be permitted throughout the duration of the
Primary Term of the CONTRACT or any extensions thereto, except as otherwise explicitly
provided for in Attachment C, Part 5.
1.3.6 In the event that CONTRACTOR fails to meet its obligations regarding the performance of the
WORK, liquidated damages shall be applied as per the CONTRACT.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 4 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

1.3.7 All prices and unit rates include the provision and maintenance of CONTRACTOR’S Quality
Assurance and Quality Control system;
1.3.8 All prices and unit rates include the provision, procurement, expediting, purchase,
documentation, and incorporation of all material and other resources required to perform the
WORK;
1.3.9 All costs associated with meeting the requirements of any Certifying Authority, including the
certification of CONTRACTOR EQUIPMENT and plant, and the provision of associated
certification documentation.
1.3.10 Storage and/or transmission of all data via a COMPANY provided communications link to
COMPANY’s Office, shall be in a COMPANY specified APPROVED format

1.3.11 All prices and unit rates included in this Attachment C are fully inclusive of all existing facilities,
new facility development and resources necessary to perform the WORK, to fully satisfy all
CONTRACTOR’s obligations under the CONTRACT including, but not limited to:
a) Tawteen requirements and expectations as mentioned in the Investor Pack;
b) Full compliance with the References and Definitions of service Conditions within
Attachment B;
c) Full compliance with the provision of the service requirements within Attachment B.
1.4 PAYMENT FOR GOODS
1.4.1 General Provisions
1.4.1.1 Delivery of the GOODS, CONTRACTOR EQUIPMENT, and Materials shall be on Delivered Duty
Paid (DDP, INCOTERM 2020) basis to COMPANY’S BASE at Ras Laffan for offshore WORK, and
to COMPANY onshore drilling WORK SITE for onshore WORK, unless specified otherwise in the
CONTRACT Attachment C and / or ITP and /or CO.
1.4.2 Purchase of Goods
1.4.2.1 COMPANY shall pay CONTRACTOR an all-inclusive unit price specified in Attachment C for
purchased GOODS as described in Attachment B that is verified as being actually delivered to
and accepted by COMPANY at the specified location. The unit rates shall, where applicable,
include but not be limited to any and all direct and indirect costs associated with supplying
the GOODS.
1.4.2.2 The GOODS specified in Attachment C shall include any and all ancillary, associated and
consumable items required for each item of the GOODS to be utilized for its intended purpose;
items forming an integral component of any item of the GOODS; items which would normally
be required to proficiently utilize the GOODS; or any other items that are required for the
GOODS to perform the function for which they are intended irrespective of whether or not
the items are specifically detailed in the CONTRACT and / or ITP, and / or CO.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 5 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

1.4.2.3 COMPANY may request GOODS to be stored at CONTRACTOR facility, within Qatar, until
COMPANY is ready to receive GOODS at COMPANY’s BASE or onshore WORK SITE, for a
duration of up to six (6) months from the date of delivery free of charge. In such cases,
CONTRACTOR shall promptly notify COMPANY of arrival of the GOODS at its Base Facility.
1.4.3 Consignment of Goods
Not Applicable.
1.5 PAYMENT FOR SERVICES
1.5.1 Services
1.5.1.1 In consideration for the performance of the WORK in accordance with the CONTRACT,
COMPANY agrees to pay CONTRACTOR the prices and rates specified in this Article. Payment
in accordance with this Article shall cover the performance of all CONTRACTOR's obligations
and duties under the CONTRACT and/or ITP and /or CO. No claim for any other sum additional
to the prices specified herein shall be made by CONTRACTOR, unless otherwise agreed as per
Article 1.1.
1.5.2 Equipment Rentals
1.5.2.1 For CONTRACTOR EQUIPMENT specified in Attachment C and described in Attachment B,
Scope of Work, that are provided on a rental basis, COMPANY shall pay CONTRACTOR the
applicable rates specified therein. Unless specified otherwise in Attachment C, ITP, and / or
CO. CONTRACTOR EQUIPMENT rental rates shall be as follows:
(i) Rental Rate, if applicable, applies when CONTRACTOR EQUIPMENT arrives at COMPANY’s
BASE until it is released from COMPANY’s BASE.
(ii) Standby Rate, if applicable, applies when CONTRACTOR EQUIPMENT arrives at COMPANY’s
BASE as per COMPANY specified dates, and accepted by COMPANY and shall be applicable
until the CONTRACTOR EQUIPMENT is released by COMPANY from COMPANY’s BASE.
(iii) Operating Rate, if applicable, applies when CONTRACTOR EQUIPMENT is operating at
COMPANY WORKSITE (from the time CONTRACTOR EQUIPMENT is lowered below rotary table
for the performance of WORK until it is pull out of hole above rotary table).
(iv) If the WORK being performed by the CONTRACTOR is not able to proceed in a fully productive
and safe manner, consistent with normal operating practice, due to failure or non-availability
of CONTRACTOR EQUIPMENT, CONTRACTOR PERSONNEL, GOODS, Services, or Materials,
then the applicable rental rate of CONTRACTOR EQUIPMENT (the failed/non-performing
equipment and the equipment affected because of the failed/non-performing equipment)
and related CONTRACTOR PERSONNEL rates, shall not be paid for the duration of such non-
productive time (hereinafter called as Zero Rate), commencing from the time of failure or non-
availability of such CONTRACTOR EQUIPMENT, CONTRACTOR PERSONNEL, Services, or
Materials and ceasing at such time when the subject CONTRACTOR EQUIPMENT,
CONTRACTOR PERSONNEL, Services, or Material, is repaired or replaced, or made available as
fully functional in accordance with COMPANY requirements, and full productive provision of
the WORK, is resumed.
Tender Enquiry No. LTC/C/SDC/4920/20 Page 6 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

(v) Only one (1) rental rate per tool can apply at any given time during the rental period.
(vi) The payment of any rental rates shall be subject to the items of equipment being continuously
present and available to perform the WORK provided that each item of equipment has been
called off by COMPANY through the issuance of a written ITP, as Per Article 1.1.
(vii) Monthly rate, if any, shall be pro-rated on daily basis, for partial months for which service is
provided.
1.5.2.2 Except as otherwise provided, COMPANY shall pay CONTRACTOR the applicable all-inclusive
rates specified in Attachment C. The rates shall cover all of the CONTRACTOR’s costs and
expenses associated with the provision and utilization of its equipment at the WORKSITE. The
unit rates shall include any and all direct and indirect costs.
1.5.2.3 CONTRACTOR EQUIPMENT shall be deemed to include any and all ancillary, associated and
consumable items required for each item of equipment to be utilized for its intended purpose;
items forming an integral component of any item of equipment; items which would normally
be required to proficiently utilize the equipment; or any other items of equipment that are
required for CONTRACTOR to perform the WORK irrespective of whether or not the items are
specifically detailed in the CONTRACT.
1.5.2.4 Unless clearly stated otherwise in the Attachment C, the package unit rates for provision of
CONTRACTOR EQUIPMENT shall include the cost of providing primary and back-up Equipment
and associated spare parts.
1.5.2.5 CONTRACTOR shall maintain and provide sufficient back-up equipment at the WORK SITE and
at the CONTRACTOR’s facility to ensure uninterrupted operations of CONTRACTOR
EQUIPMENT. CONTRACTOR shall also maintain sufficient quantities of spare parts at the
WORKSITE to ensure all of CONTRACTOR EQUIPMENT remains fully functional.
1.5.2.6 The following conditions, specific to this CONTRACT, shall also apply:
Fishing Equipment Package Rates
a) Fishing Equipment will be charged on per hole section fishing package basis per
rig/rigless operation, based on call-out/ ITP. It is anticipated at times there will be
some overlap in packages called out due to preparation for upcoming operations. In
the event of overlap, COMPANY at its sole discretion, may elect which hole section
rate applies for that given day, based on the applicable rates per Table C.
b) For each hole section, Table C specifies minimum inventory that must be available to
charge the applicable hole section rate. COMPANY will not accept any claim or
submission for additional compensation on the grounds of CONTRACTOR’s failure or
inability to provide minimum inventory as per table tool count which includes primary
and backup.
c) If additional fish dressing, recovering and fishing equipment is required in order to
support the COMPANY’S drilling operation for that section, equipment (primary and

Tender Enquiry No. LTC/C/SDC/4920/20 Page 7 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

backup) will be provided with no incremental cost above the hole section fishing
package day rate.
d) CONTRACTOR shall supply equipment with manufacturer-recommended thread
protectors.
e) CONTRACTOR shall supply, free of charge, crossovers or adapters required to connect
CONTRACTOR EQUIPMENT and tools to running string at no additional cost.
f) CONTRACTOR shall provide baskets to transport and store fishing equipment at
WORKSITE inclusive in the package Rates.
g) COMPANY may request CONTRACTOR to store and maintain COMPANY’s Fishing and
Rental Tools and equipment required for the WORK at CONTRACTOR base/warehouse
in Qatar. There shall be no additional charges to COMPANY for CONTRACTOR to store
and maintain COMPANY-owned equipment or tools.
1.5.3 Personnel

This Attachment C, identifies the rates which shall be paid for CONTRACTOR PERSONNEL to
perform the WORK in accordance with the work requirements set out in Attachment B.
1.5.3.1 Services of CONTRACTOR PERSONNEL shall be availed on an “as-and-when-needed” basis.
Rates of Payment for CONTRACTOR PERSONNEL shall include:
a) All costs of employment of CONTRACTOR’s direct, indirect productive and non-
productive labor, home and field, supervision and management including all
associated costs, direct remuneration, payroll related expenses, including salaries,
National Insurance contributions, payroll taxes, redundancy, welfare funds, sick-pay,
bonus and incentive payments, statutory and annual holidays, health plans and the
like, and all costs of crew changes, other direct and indirect costs and expenses;
b) All normal working hours, overtime, and any weekend, holiday or shift work wages,
whether day or night;
c) Attendance at all meetings, as required, and all associated costs;
d) All CONTRACTOR’S travel subsistence and associated costs including hotel
accommodation, air travel, taxi, car hire, meals and the like (except those specifically
identified as being provided by COMPANY under this CONTRACT);
e) Provision of personal protective clothing and protective equipment necessary for safe
performance of the WORK;
f) All necessary costs and arrangements in connection with the issuance of work permits,
visas, transportation, accommodation, etc. for its personnel engaged for the WORK
and all associated costs.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 8 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

1.5.3.2 Daily or Monthly Rates of Payment for CONTRACTOR PERSONNEL working offshore WORK
SITE, shall apply from the day of departure from COMPANY’S BASE or Doha Heliport for
offshore WORK, and end on the day of return to same.
1.5.3.3 Rates of Payment for CONTRACTOR PERSONNEL working at Onshore WORK SITE, shall apply
from time and date of arrival at WORK-SITE, until time and date of departure from WORK-
SITE.
1.5.3.4 CONTRACTOR shall not be reimbursed for its personnel at any time such personnel are not
available or are not in condition to perform the WORK. Monthly Rate, if any, shall be pro-
rated on daily basis, for partial months for which service is provided.
1.5.3.5 All of CONTRACTOR PERSONNEL originating from a location with more than a 4-hour time-
zone difference from WORK SITE shall have a schedule of WORK organized to have a
minimum of twelve (12) hours of rest time before commencing WORK at no additional cost
to COMPANY.
1.5.3.6 CONTRACTOR shall provide the necessary technical and engineering support to COMPANY
PERSONNEL in COMPANY’s office or CONTRACTOR’s facilities at no cost to COMPANY,
except where it is specifically identified as being paid by COMPANY, in Part 2– Rates of
Payment.
1.5.3.7 CONTRACTOR PERSONNEL Rates shall include all costs associated with its personnel travel
between their points of “origin” and the COMPANY’s BASE/Doha Heliport, for offshore
WORK and COMPANY onshore WORK SITE for onshore WORK.
1.5.3.8 COMPANY will provide transportation between WORK SITE and Doha Heliport (or the BASE)
for CONTRACTOR PERSONNEL.
1.5.3.9 On days when personnel crew-change at the WORK SITE, only one personnel charge per
job position, shall be payable by COMPANY.
1.5.3.10 COMPANY will provide Safety Induction Training, which shall be mandatory for all
CONTRACTOR PERSONNEL working at COMPANY WORK SITES, however all associated costs
for CONTRACTOR PERSONNEL to attend this training course, including but not limited to
accommodation, transportation, per diem, meals, and other expenses, shall be provided
and paid by the CONTRACTOR.
1.5.3.11 All other mandatory training and certifications required for CONTRACTOR PERSONNEL to
work at COMPANY WORK SITEs shall be arranged and paid for by the CONTRACTOR.
1.5.3.12 COMPANY shall provide full room and board only at offshore WORKSITE for CONTRACTOR
PERSONNEL at no cost to CONTRACTOR.
1.5.3.13 Not Applicable

Tender Enquiry No. LTC/C/SDC/4920/20 Page 9 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

1.6 PAYMENT FOR CONTRACTOR MATERIALS


Not Applicable
1.7 PAYMENT FOR OTHER SERVICES
Not Applicable
1.8 MISSING ITEMS OF EQUIPMENT
Not Applicable
1.9 ITEMS NOT SPECIFIED IN THE CONTRACT
1.9.1 COMPANY may require CONTRACTOR to perform the WORK with third party item during the
term of the CONTRACT. Any requirement for such unspecified items may only be requested
when COMPANY issues a Call Off Order and/or Instructions to Proceed to CONTRACTOR for
such services. CONTRACTOR shall provide such other services or other third party items as
and when requested by COMPANY. COMPANY shall have the right but shall not be under an
obligation to utilize either of the alternative methods detailed in Articles 1.9.2 and 1.9.3 to
establish CONTRACTOR’s compensation for other services or other third party equipment,
materials, goods or services.
1.9.2 COMPANY may pay CONTRACTOR in accordance with CONTRACTOR’s Price Book, less the
discount specified in Attachment C, Part 4 for services not specified in the CONTRACT. In the
event that COMPANY exercises its right to utilize the services contained in CONTRACTOR’s
Price Book, any general terms and conditions that normally form part of the Price Book shall
not be applicable and the terms and conditions of this CONTRACT shall govern the
performance WORK.
1.9.3 COMPANY may pay CONTRACTOR on a reimbursable cost basis for subcontracting third party
items not specified in the CONTRACT. If instructed by COMPANY, CONTRACTOR shall obtain,
whenever practicable, a minimum of three (3) technically acceptable competitive tenders for
all subcontracted items. Prior to tendering for such items, the CONTRACTOR shall submit to
COMPANY the proposed list of tenderers including the justification for their selection and full
details of the tender evaluation plan specifically including details of all weightings which are
intended to be used in the evaluation and any special features of the evaluation. Mark up for
3rd party work over its net documented cost shall be paid as per Attachment C, Part 4.
1.10 DISCOUNTS
CONTRACTOR discounts offered for the WORK shall be listed in Attachment C, Part 4.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 10 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

1.11 NOTIFICATION PERIODS / MOBILISATION TIMELINES


To assist the CONTRACTOR in scheduling and planning its WORK, COMPANY shall make the
COMPANY’s drilling rig activity plan, available to the CONTRACTOR, on a regular basis.
The following notification periods shall be given by COMPANY for provision of GOODS, Service,
CONTRACTOR EQUIPMENT, and CONTRACTOR PERSONNEL to be provided under this
CONTRACT:
1.11.1 After receiving COMPANY’s INSTRUCTION TO PROCEED to supply the GOODS, CONTRACTOR
shall deliver GOODS to COMPANY BASE in accordance with the date of delivery included in the
ITP.
1.11.2 Notwithstanding Attachment C, Part 2 or otherwise agreed in writing, for the provision of
CONTRACTOR EQUIPMENT in accordance with the Table C in this Attachment C, COMPANY
shall notify CONTRACTOR in writing seven (7) days prior to the date the CONTRACTOR
EQUIPMENT is required to be delivered to the COMPANY BASE at Ras Laffan for offshore
WORK, or to the WORK SITE for onshore WORK.
In accordance with CONTRACT requirements, all CONTRACTOR EQUIPMENT shall be delivered
to COMPANY BASE or WORK SITE with complete and valid certification and documentation,
and be in condition to operate safely.
CONTRACTOR shall be required to demobilise the CONTRACTOR EQUIPMENT to its base after
it has performed fishing operation on any hole section as per the instruction of COMPANY for
servicing and maintenance. CONTRACTOR may be required to mobilise a replacement Hole
Section Fishing Packages of the same size, if required by the COMPANY to support ongoing
drilling and completion activities.
1.11.3 Notwithstanding Attachment C, Part 2 or otherwise agreed in writing, for the provision of
CONTRACTOR EQUIPMENT in accordance with the Table D and E in this Attachment C,
COMPANY shall notify CONTRACTOR in writing twenty four (24) hours prior to the date the
CONTRACTOR EQUIPMENT is required to be delivered to the COMPANY BASE at Ras Laffan for
offshore WORK, or to the WORK SITE for onshore WORK.
In accordance with CONTRACT requirements, all CONTRACTOR EQUIPMENT shall be delivered
to COMPANY BASE or WORK SITE with complete and valid certification and documentation,
and be in condition to operate safely.
1.11.4 Notwithstanding Attachment C, Part 2 or otherwise agreed in writing, for the provision of
CONTRACTOR PERSONNEL, COMPANY shall notify CONTRACTOR in writing twenty four (24)
hours prior to the date that CONTRACTOR PERSONNEL are required to depart from Doha
Heliport or from COMPANY BASE for offshore WORK, or twenty four (24) hours prior to the
date that PERSONNEL are required to be the WORK SITE for onshore WORK.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 11 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

1.12 REPONSIBILITY MATRIX


The table below outlines the division of responsibility and cost impact between CONTRACTOR and
COMPANY in the performance of the WORK.

ITEM DESCRIPTION PROVIDED BY AT THE COST OF


CONTRACTOR COMPANY CONTRACTOR COMPANY
1 TRANSPORTATION
Transportation of X X
CONTRACTOR EQUIPMENT,
products, supplies, between
CONTRACTORS base and
COMPANY BASE (Ras Laffan) /
Doha Heliport.
Transportation of X X
CONTRACTOR PERSONNEL
between CONTRACTOR base /
point of origin and COMPANY
BASE (Ras Laffan) / Doha
Heliport / COMPANY Doha
offices.
Handling EQUIPMENT required X X
at CONTRACTOR base.
Handling EQUIPMENT required X X
at COMPANY base
Transportation of X X
CONTRACTOR EQUIPMENT,
products, supplies, between
COMPANY BASE (Ras Laffan) /
Doha Heliport and WORKSITE
Transportation of X X
CONTRACTOR PESONNEL
between COMPANY BASE (Ras
Laffan) / Doha Heliport and
WORKSITE
Wharf facilities, handling X X
EQUIPMENT required in the
loading / offloading of Supply
Vessels
Diesel fuel for CONTRACTOR X X
EQUIPMENT at WORKSITE
Radio equipment X X
communication between

Tender Enquiry No. LTC/C/SDC/4920/20 Page 12 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

ITEM DESCRIPTION PROVIDED BY AT THE COST OF


CONTRACTOR COMPANY CONTRACTOR COMPANY
WORKSITE and CONTRACTOR's
office (for official use only and
authorize by COMPANY
Representatives on board)
Lubricants for CONTRACTOR X X
EQUIPMENT
2 DRILLING AND ASSOCIATED
SERVICES
Fishing and Rental EQUIPMENT X X
and services to support drilling,
testing, completion, workover
and abandonment of wells in
accordance with the
CONTRACT.
3 MAINTENANCE SERVICES
All repair to CONTRACTOR X X
EQUIPMENT.
Maintenance of all X X
CONTRACTOR EQUIPMENT in
accordance with the
CONTRACT.
Laboratory services onshore to X X
provide the necessary
capability for testing of
Products and or material as
and when required by
4 STORAGE AND OTHER
FACILITIES
Warehouse at BASE for X X
CONTRACTOR EQUIPMENT,
supplies and Products.
Open storage at for X X
CONTRACTOR
EQUIPMENT/products which is
adequate to meet
CONTRACTOR requirement.
5 HOUSING, CATERING AND
MEDICAL SERVICES
CONTRACTOR's office in Ras X X
Laffan
Accommodation for X X
CONTRACTOR PERSONNEL
onshore.
Tender Enquiry No. LTC/C/SDC/4920/20 Page 13 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

ITEM DESCRIPTION PROVIDED BY AT THE COST OF


CONTRACTOR COMPANY CONTRACTOR COMPANY
Accommodation for X X
CONTRACTOR PERSONNEL
offshore
Catering and meal for X X
CONTRACTOR PERSONNEL
offshore.
Meal for CONTRACTOR X X
PERSONNEL onshore and while
travelling
First aid medical attention at X X
the WORKSITE for
CONTRACTOR PERSONNEL
Medical attention and other X X
requirements of CONTRACTOR
PERSONNEL onshore and while
travelling.
All arrangements and costs X X
associated with evacuation of
injured personnel from the
WORKSITE to BASE
Transportation from BASE / X X
Doha Heliport to Hospital or
elsewhere for injured
CONTRACTOR PERSONNEL
6 PERSONNEL
Additional PERSONNEL X X
required and furnished by
CONTRACTOR as APPROVED in
advance by CONTRACT
Administrator over and above
normal crew pursuant to Casual
labour for the maintenance of
CONTRACTOR EQUIPMENT,
materials and supplies at
WORKSITE
Casual labour for the X X
maintenance of
CONTRACTOR’s EQUIPMENT,
materials, and supplies at
BASE/ WORKSITE.
Casual labour for handling X X
CONTRACTOR EQUIPMENT,

Tender Enquiry No. LTC/C/SDC/4920/20 Page 14 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

ITEM DESCRIPTION PROVIDED BY AT THE COST OF


CONTRACTOR COMPANY CONTRACTOR COMPANY
materials and supplies
between warehouse and dock.
Travel time and any associated X X
personal expenses for
CONTRACTOR PERSONNEL
during normal crew change.
Travel time and any associated X X
personal expenses paid to
CONTRACTOR PERSONNEL in
excess when weather or failure
of provided transportation
prevents normal crew change.
Travel expenses for X X
CONTRACTOR PERSONNEL
between Point of Origin and
BASE OR Heliport.
Provision of special flight for X X
CONTRACTOR PERSONNEL
between BASE and the
WORKSITE as a failure of
CONTRACTOR PERSONNEL to
turn up during normal crew
change.
7 LICENCES AND PERMITS
All necessary consents, X X
permits, licenses and
certificates required for
movement of CONTRACTOR
EQUIPMENT/Products to and
from WORKSITE.
Passports, visas and work X X
permits and related
documentation required to
maintain CONTRACTOR
PERSONNEL in Qatar
Arrangement for the clearance
of CONTRACTOR EQUIPMENT
through Customs :-
- to and from WORKSITE X X
- to and from QATAR X X
8 SAFETY
Safety apparels such as clear X X
lens, safety glasses, safety
Tender Enquiry No. LTC/C/SDC/4920/20 Page 15 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

ITEM DESCRIPTION PROVIDED BY AT THE COST OF


CONTRACTOR COMPANY CONTRACTOR COMPANY
boots, coveralls etc. for each of
CONTRACTOR's and its sub-
contractors employees. The
lenses and frames of the safety
glasses must comply with the
American National Standard
(ANSI) Z87.1-1979
Safety course attended by X X
CONTRACTOR PERSONNEL
conducted by recognized body
for getting safety
certificate/passport.

1.13 SET UP PERIOD


CONTRACTOR’s facility in the State of Qatar shall be ready and fully capable of providing all
the support required for the WORK under the CONTRACT within one (1) year calculated from
the CONTRACT EFFECTIVE DATE. [Tender Note: Time specified here for setting up the facility
by CONTRACTOR is the maximum period allowed by COMPANY. Tenderer to specify the period
required for setting up the facility in the Technical Proposal, which shall become part of the
CONTRACT on award]

1.14 CONTRACT PRICE


The committed CONTRACT PRICE for the Primary Term based on the rates of payment shall
be 12,350,000 QAR (Twelve Million and Three Hundred Fifty Thousand Qatari Riyals).
However, CONTRACTOR shall only be paid for WORK Called Off, completed and accepted by
COMPANY.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 16 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

PART 2 - RATES OF PAYMENT

RATES OF PAYMENT – PERSONNEL AND EQUIPMENT


The Rates in Part 2 are all-inclusive and fixed for the duration of the WORK for the Primary Term of
CONTRACT from the EFFECTIVE DATE.
2.1 PERSONNEL Rates
Table A – Personnel (ONSHORE)

Rate (QAR) Discount


Description Unit for > 1 month
ONSHORE
(%)
per day 4,550.00
1. Dedicated Doha Based Fishing and
Rental Service Co-ordinator per month 113,750.00 5%
2. Doha Based Fishing and Rental Service One At the Cost of
Co-ordinator CONTRACTOR
3. Doha Based Quality Representative One At the Cost of
CONTRACTOR
4. Doha Based HSE Representative One At the Cost of
CONTRACTOR

Notes:
As per Attachment B, CONTRACTOR shall provide a Fishing and Rental Tools Services Coordinator
to support the WORK. However, in the event COMPANY wants services of Dedicated Doha Based
Fishing and Rental Service Co-ordinator, it will be availed on call off basis.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 17 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Table B – Call out Personnel Rates (OFFSHORE)

Unit Rate Discount


Description Unit for > 1 month
(QAR)
(%)

1. Fishing Supervisor per day 5,805.00


per month 140,950.00 5%
per day 5,805.00
2. Fishing Engineer
per month 140,950.00 5%
per day 2,751.00
3. Welder (OPTIONAL)
per month 81,081.00 5%
per day 2,751.00
4. Assistant/Helper
per month 81,081.00 5%

5. Controlled Pre and Post Heating Engineer per day 2,751.00


per month 81,081.00 5%

6. Controlled Pre and Post Heating Operator per day 2,751.00


per month 81,081.00 5%
per day P.O.R(Price on
7. Electric Wireline Engineer (OPTIONAL) Request)
per month P.O.R P.O.R
per day P.O.R
8. Electric Wireline Operator (OPTIONAL)
per month P.O.R P.O.R
per day 2,751.00
9. Hot Tapping Engineer
per month 5%
81,081.00
per day 2,751.00
10. Hot Tapping Operator
per month 81,081.00 5%

11. Cold Cutting Engineer per day 2,751.00


per month 81,081.00 5%
per day 2,751.00
12. Cold Cutting Operator
per month 81,081.00 5%
per day 2,751.00
13. Cold Cutting Technician
per month 81,081.00 5%

Tender Enquiry No. LTC/C/SDC/4920/20 Page 18 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

2.2 EQUIPMENT RATE


For the duration of the primary term of CONTRACT, it is expected that CONTRACTOR will have Fishing
and Rental EQUIPMENT as described in packages below available in Qatar. This EQUIPMENT shall be
available exclusively to COMPANY unless otherwise agreed in writing by COMPANY.
1. Package shall be inclusive of all necessary hoses, piping, freeze jacket, insulation, tarps,
thermocouples, valves, vent systems, transport baskets etc. to execute the job. Scaffolding will
be provided by the Rig Contractor as necessary.
2. CONTRACTOR rates includes all costs associated with execution of Job Programs, including but
not limited to necessary drawings/procedures, EQUIPMENT preparation inspection, post-job
evaluation/performance reports.
3. The above charges shall be inclusive of all associated services, cleaning, redress, and
consumables.
4. CONTRACTOR shall quote lump sum price per Hole Section and also quote for all the individual
items as listed in Table C, Call-Out Additional Fishing Tools items in Table D, and Consumable
Spare Parts in Table E. CONTRACTOR rates for optional Call-Out Rental Tools shall be listed in
Table F.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 19 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Table C Call-Out Fishing Equipment

Per Unit Lost in


Standby Operating
Hole / Damaged
CONTRACTOR EQUIPMENT Rate Rate
Count UOM Beyond Repair Rate
(QAR/month) (QAR/day) (QAR)
A. 24” Hole Section Fishing Package
Package (Contains all
74,064.00 15,355.00
items a) through s)
below)
a) 24” Bit Cone Mill 2 each
174,414.00
b) 8” OD Fishing Lubricated each
2
Bumper Sub 130,471.00
c) 8” Fishing Jars 2 each 187,293.00
d) 8” Jar Accelerators 2 each 188,727.00
e) 12-3/4” FS Overshot 2 each 81,001.00
f) 11-1/4” Grapple Sets 2 each 11,411.00
g) 11-3/4” FS Overshot 2 each 90,363.00
h) 11-3/4” Overshot each
2
Extension 34,594.00
i) 11-3/4” Wall Hook Lip each
2
Guide 60,453.00
j) 22” OD Oversized Guide 2 each 105,931.00
k) Grapples/Mill Control 2 each
(All applicable sizes)
11,411.00
Sale of Grapple if used
l) 8” Circulating Sub 2 each
41,794.00
m) 8” Safety Joint 2 each
60,843.00
n) 13-3/8” Drive Sub 2 each
38,962.00
o) 13-3/8” X-Over Sub 2 each
38,962.00
p) 16” Was hover Pipe 2 each
82,652.00
q) 16” Burn Shoe 2 each
89,369.00
r) Reverse Circulating Junk 2 each
Basket 137,621.00
s) 9 5/8” Junk Sub 2 each
38,918.00
Discount on Standby Rate For > 1 Month (%) 0

Tender Enquiry No. LTC/C/SDC/4920/20 Page 20 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating
Hole / Damaged
CONTRACTOR EQUIPMENT Rate Rate
Count UOM Beyond Repair Rate
(QAR/month) (QAR/day) (QAR)
B. 17-1/2” Hole Section Package
Fishing Package (Contains
72,064.00 15,355.00
all items a) through r s)
below)
a) 17-1/2” Bit Cone Mill 2 each 144,404.00
b) 9-5/8” Junk Sub 2 each 38,918.00
c) 8” OD Fishing Lubricated 2 each
Bumper Sub 130,471.00
d) 8” Fishing Jars 2 each 187,293.00
e) 8” Jar Accelerators 2 each 188,727.00
f) 11-3/4” FS Overshot 2 each 90,363.00
g) 11-3/4” Overshot Extension 2 each 34,594.00
h) 11-3/4” Wall Hook Lip 2 each
Guide 60,453.00
i) 15” OD Oversized Guide 2 each 85,931.00

j) Grapples/Mill Control 2 each 11,411.00


(All applicable sizes)
Sale of Grapple if used
k) 8” Circulating Sub 2 each 41,794.00
l) 8” Safety Joint 2 each 60,843.00
m) 13-3/8” Drive Sub 2 each 60,843.00
n) 13-3/8” X-Over Sub 2 each 38,962.00
o) 16” Washover Pipe 2 each 38,962.00
p) 16” Burn Shoe 2 each 82,652.00
q) Taper Tap for 2” thru 4-3/4” 2 each 45,932.00
Catch
r) Reverse Circulating Junk 2 each 137,621.00
Basket
2 each
s) Junk Sub

Discount on Standby Rate For > 1 Month (%) 0

Tender Enquiry No. LTC/C/SDC/4920/20 Page 21 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating
Hole / Damaged
CONTRACTOR EQUIPMENT Rate Rate
Count UOM Beyond Repair Rate
(QAR/month) (QAR/day) (QAR)
C. 12-1/4” Hole Section Package
Fishing Package (Contains
50,040.00 15,355.00
all items a) through t u)
below)
a) 12-1/4” Bit Cone Mill 2 each 114,200.00
b) 9-5/8” Junk Sub 2 each 38,918.00
c) 8” OD Fishing Lubricated 2 each
Bumper Sub 130,471.00
d) 8” Fishing Jars 2 each 187,293.00
e) 8” Jar Accelerators 2 each 188,727.00
f) 11-3/4” FS Overshot 2 each 90,363.00
g) 11-3/4” Overshot Extension 2 each 34,594.00
h) 11-3/4” Wall Hook Lip 2 each
Guide 60,453.00
i) Grapples/Mill Control 2 each 11,411.00
(All applicable sizes) Sale of
Grapple if used
j) 8” Circulating Sub 2 each 11,411.00
k) 8” Safety Joint 2 each 41,794.00
l) 6-1/2” Safety Joint 2 each 60,843.00
m) 11-3/4” Drive Sub 2 each 60,843.00
n) 11-3/4” X-Over Sub 2 each 38,962.00
o) 11-3/4” Washover Pipe 2 each 38,962.00
p) 11-3/4” Burn Shoe 2 each 82,652.00
q) Taper Tap for 2” thru 4-3/4” each 45,932.00
Catch 2
r) Die Collar for 4-3/4” thru 5” 2 each
Catch 36,865.00
s) Die Collar for 6-1/4” thru 6- 2 each
3/4” Catch 38,865.00
t) Reverse Circulating Junk 2 each
Basket 137,621.00
u) Junk Sub 2 each

Discount on Standby Rate For > 1 Month (%) 0

Tender Enquiry No. LTC/C/SDC/4920/20 Page 22 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating
Hole / Damaged
CONTRACTOR EQUIPMENT Rate Rate
Count UOM Beyond Repair Rate
(QAR/month) (QAR/day) (QAR)
D. 8-1/2” Hole Section Package
Fishing Package (Contains
45,817.00 12,875.00
all items a) through q r)
below)
a) 8-1/2” Bit Cone Mill 2 each 62,244.00
b) 7” Junk Sub 2 each 23,509.00
c) 6-1/2” OD Fishing 2 each
Lubricated Bumper Sub 157,163.00
d) 6-1/2” Fishing Jars 2 each 158,467.00
e) 6-1/2” Jar Accelerators 2 each 67,086.00
f) 8-1/8” FS Overshot 2 each 48,734.00
g) 8-1/8” Overshot Extension 2 each 27,768.00
h) 8-1/8” Wall Hook Lip Guide 2 each 26,863.00
i) Grapples/Mill Control 2 each
(All applicable sizes) Sale of
Grapple if used 7,007.00
j) 5-3/4” Overshot 2 each 48,733.00
k) 5-3/4” Overshot Extension 2 each 31,698.00
l) 5-3/4” Wall Hook Lip Guide 2 each 44,553.00
m) 6-1/2” Circulating Sub 2 each 30,787.00
n) 6-1/2” Safety Joint 2 each 28,212.00
o) 7” Wire Rope Spear 2 each 18,673.00
p) 8-1/2” Soft Blade Stabilizer 2 each
59,610.00
q) Reverse Circulating Junk 2 each
Basket 105,454.00
r) Junk Sub 2 each

Discount on Standby Rate For > 1 Month (%) 0


E. 6” Hole Section Fishing Package
Package
30,720.00 14,148.00
(Contains all items a)
through p q) below
Tender Enquiry No. LTC/C/SDC/4920/20 Page 23 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating
Hole / Damaged
CONTRACTOR EQUIPMENT Rate Rate
Count UOM Beyond Repair Rate
(QAR/month) (QAR/day) (QAR)
a) 6” Bit Cone Mill 2 each 46,800.00
b) 5” Junk Sub 2 each 23,673.00
c) 4-1/2” OD Fishing 2 each
Lubricated Bumper Sub 53,380.00
d) 4-1/2” Fishing Jars 2 each 94,136.00
e) 4-1/2” Jar Accelerators 2 each 65,740.00
f) 5-7/8” FS Overshot 2 each 65,505.00
g) 5-7/8” Overshot Extension 2 each 115,884.00
h) 5-7/8” Wall Hook Lip Guide 2 each 48,960.00
i) Grapples/Mill Control 2 each
(All applicable sizes)
Sale of Grapple if used 6,507.00
j) 4-3/4” FS Overshot 2 each 53,553.00
k) 4-3/4” Overshot Extension 2 each 34,833.00
l) 4-3/4” Wall Hook Lip Guide 2 each 48,960.00
m) 4-1/2” Circulating Sub 2 each 33,832.00
n) 4-1/2” Safety Joint 2 each 31,003.00
o) 5” Wire Rope Spear 2 each 20,520.00
p) Reverse Circulating Junk 2 each
Basket 65,484.00
q) Junk Sub 2 each

Discount on Standby Rate For > 1 Month (%) 5


F. 5-1/2” Tubing Fishing Package
Package (Contains all
29,400.00 13,832.00
items a) through w)
below)
a) 4-1/32” Releasing Spear 2 each 13,512.00
b) 3-1/8” Spear Extension 2 each 13,924.00
c) 6-1/4” Spear Stop Sub 2 each 5,284.00

Tender Enquiry No. LTC/C/SDC/4920/20 Page 24 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating
Hole / Damaged
CONTRACTOR EQUIPMENT Rate Rate
Count UOM Beyond Repair Rate
(QAR/month) (QAR/day) (QAR)
d) 5-1/2” Spear Pack Off 2 each 7,113.00
e) 4-3/4” Taper Mill 2 each 27,273.00
f) 4-3/4” String Mill 2 each 28,548.00
g) 4-3/4” Stabilizer 2 each 29,505.00
h) 4-3/4” Junk Mill 2 each 19,552.00
i) 6-1/4” Pilot Mill 2 each 39,144.00
j) 3-5/8” Multistring Cutter 2 each 29,420.00
k) 4-3/4” Lubricated Bumper 2 each
Sub 61,444.00
l) 4-3/4” Fishing Jars 2 each 94,136.00
m) 4-3/4” Fishing Accelerators 2 each
73,720.00
n) 5-3/4” x 4-3/4” Dress Mill 2 each
61,200.00
o) 8-5/8” Junk Mill 2 each
50,272.00
p) 8-1/8” SH Overshot 2 each
50,276.00
q) 8-1/8” Overshot 2 each
Extension 30,513.60
2 each 6,507.00
r) Grapples / Mill Control
(All applicable sizes)
Sale of Grapple if used
2 each
s) 6-1/2” Fishing Jar
158,467.00
2 each
t) 6-1/2” Accelerator
67,086.00
u) 6-1/2” Lubricated 2 each
Bumper Sub 157,163.00
v) Reverse Circulating Junk 2 each
Basket 45,380.00
w) Upto 4 ¾” Junk Sub 2 each
13,152.00

Discount on Standby Rate For > 1 Month (%) 5


Tender Enquiry No. LTC/C/SDC/4920/20 Page 25 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating
Hole / Damaged
CONTRACTOR EQUIPMENT Rate Rate
Count UOM Beyond Repair Rate
(QAR/month) (QAR/day) (QAR)
G. 5” Tubing Fishing Package Package
(Contains all items a) 21,688.00 13,792.00
through q o) below)
a) 3-5/8” Releasing Spear 2 each 13,512.00
b) 3-1/8” Spear Extension 2 each 13,924.80
c) 5-3/4” Spear Stop Sub 2 each 5,284.80
d) 5” Spear Pack Off 2 each 7,113.60
e) 5-3/4” x 4-1/8” Dress Off 2 each
Mill 61,200.00
f) 4-1/8” Taper Mill 2 each 27,273.60
g) 4-1/8” String Mill 2 each 28,548.00
h) 4-1/8” Junk Mill 2 each 19,552.00
i) 5-3/4” Pilot Mill 2 each 39,144.00
j) 5-3/4” Bladed Junk Mill 2 each 19,552.00
k) 3-5/8” Multistring Cutter 2 each 29,420.00
l) Grapples / Mill Control 2 each 6,507.00
(All applicable sizes)
Sale of Grapple if used
m) 4-3/4” Fishing Jar 2 each 94,136.00
n) 4-3/4” Accelerator 2 each
65,740.00
o) 4-3/4” Lubricated Bumper 2 each
Sub 53,380.00
p) Reverse Circulating Junk 2 each
Basket 45,380.00
q) Upto 4 ¾” Junk Sub 2 each 13,152.00
Discount on Standby Rate For > 1 Month (%) 5
H. 4-1/2” Tubing Fishing Package
Package
20,688.00 13,792.00
(Contains all items a)
through u) below)
a) 3-1/8” Releasing Spear 2 each 13,512.00
b) 3-1/8” Spear Extension 2 each 13,924.00
Tender Enquiry No. LTC/C/SDC/4920/20 Page 26 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating
Hole / Damaged
CONTRACTOR EQUIPMENT Rate Rate
Count UOM Beyond Repair Rate
(QAR/month) (QAR/day) (QAR)
c) 5-1/2” Spear Stop Sub 2 each 5,284.00
d) 4-1/2” Spear Pack-Off 2 each 7,113.00
e) Grapples / Mill Control 2 each
(All applicable sizes) 6,507.00
Sale of Grapple if used
f) 4-3/4” Safety Joint 2 each 31,003.00
g) 5-1/4” x 3-7/8” Dress Off 2 each
61,200.00
Mill
h) 3-7/8” Taper Mill 2 each 27,273.00
i) 3-7/8” String Mill 2 each 28,548.00
j) 3-7/8” Stabilizer 2 each 19,552.00
k) 3-7/8” Junk Mill 2 each 19,552.00
l) 5-3/4” Bladed Junk Mill 2 each 19,552.00
m) 5-1/4” Pilot Mill 2 each 39,144.00
n) 4-3/4” Fishing Jar 2 each 94,136.00
o) 4-3/4” Accelerator 2 each 73,720.00
p) 4-3/4” Lubricated Bumper 2 each
61,444.00
Sub
q) 5-3/4” FS Overshot 2 each 65,505.00
r) Bit Sub – 3-1/2” IF x 3-1/2” 2 each
19,552.00
REG
s) 3-5/8” Multistring Cutter 2 each 29,420.00
t) Reverse Circulating Junk 2 each
45,380.00
Basket
u) Upto 4 ¾” Junk Sub 2 each 13,152.00

Discount on Standby Rate For > 1 Month (%) 5


The rates quoted in Table C are inclusive of all items required to fulfil the technical specification as
per Attachment B.2. Count 2 for each items mentioned above=1 Primary + 1 Back-up equipment.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 27 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Table D – Call-out Additional Fishing Tools

Per Unit Lost in


Standby Rate Operating Hole / Damaged
Rate Beyond RepairRate
CONTRACTOR
Count UOM QAR per
EQUIPMENT QAR QAR
Month QAR
per per Day
Day
A. Fishing Tools and Accessories
1. Milling Tools
a) 24” Bit Cone Mill 1 EA 344.00 3,800.00 2,352.00 96,800.00
b) 17-1/2” Junk Mill 1 EA 200.00 4,200.00 2,752.00 55,200.00
c) 12-1/4” Bit Cone Mill 1 EA 160.00 3,500.00 1,952.00 50,000.00
d) 8-1/2” Junk Mill 1 EA 96.00 1,800.00 1,552.00 38,000.00
e) Other similar tools
(To be quoted by Tenderer)
A1) Other tools not specified - - Refer Price Refer Price Refer Price
Refer Price Book
to be listed in Price Book Book Book Book
A2) Other tools not specified - - Refer Price Refer Price Refer Price
Refer Price Book
to be listed in Price Book Book Book Book

2. Junk Baskets
a) 9-5/8” Boot Type 1 EA 84.00 2,100.00 488.00 20,800.00
b) 7” Boot Type 1 EA 48.00 1,200.00 300.00 14,352.00
c) Finger Type 1 EA 120.00 1,800.00 2,740.00 13,552.00
d) Reverse Circulating
1 EA 96.00 2,400.00 1,408.00 18,352.00
Type
e)Other similar tools (To
be quoted by Tenderer)
A1) Other tools not specified - - Refer Price Refer Price Refer Price
Refer Price Book
to be listed in Price Book Book Book Book
A2) Other tools not specified - - Refer Price Refer Price Refer Price
Refer Price Book
to be listed in Price Book Book Book Book
3. Fishing Jars and
Accelerators
a) 8” OD Fishing
148.00 3,500.00 1,680.00 103,948.00
Lubricated Bumper Sub 1 EA
b) 8” OD Fishing Jars 1 EA 332.00 4,300.00 1,680.00 104,744.00
c) 8” OD Jar Accelerators
1 EA 348.00 4,300.00 1,828.00 44,956.00

d)6-1/2” OD Fishing
136.00 3,400.00 604.00 95,948.00
Lubricated Bumper Sub 1 EA
e) 6-1/2” OD Fishing Jar 1 EA 248.00 5,800.00 1,320.00 96,744.00

Tender Enquiry No. LTC/C/SDC/4920/20 Page 28 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating Hole / Damaged
Rate Rate Beyond Repair
CONTRACTOR
Count UOM Rate
EQUIPMENT
QAR
QAR QAR
per QAR
per Day per Day
Month
f) 6-1/2” OD Jar
1 EA 240.00 6,300.00 1,680.00 40,956.00
Accelerator
g) Other similar tools
(To be quoted by
Tenderer)
A1) Other tools not - -
Refer Price Refer Price Refer Price
specified to be listed in Book Book Book
Refer Price Book
Price Book
4. Overshot and Grapples
a) 12-3/4” FS Overshot 1 EA 220.00 2,700.00 1,612.00 44,956.00
b) 11-1/4” Grapple Sets 1 EA 20.00 500.00 7,007.00 7,007.00
c) 11-3/4” FS Overshot 1 EA 84.00 2,100.00 84.00 50,152.00
d) 11-3/4” Overshot
1 EA 88.00 2,200.00 488.00 19,200.00
Extension
e) 11-3/4” Wall Hook
1 EA 176.00 1,712.00 576.00 33,552.00
Lip Extension
f) 22” OD Oversized
1 EA 112.00 2,000.00 520.00 58,792.00
Guide
g) 15” OD Oversized
1 EA 64.00 1,700.00 508.00 34,792.00
Guide
h) Basket Grapples and
1 EA 20.00 500.00 7,007.00 7,007.00
Mill Control
i) 8-1/8” FS Overshot 1 EA 88.00 2,200.00 772.00 29,752.00
j) 8-1/8” Overshot
1 EA 68.00 1,700.00 420.00 16,400.00
Extension
k) 8-1/8” Wall Hook Lip
1 EA 20.00 500.00 420.00 26,400.00
Guide
l) Spiral Grapples,
1 EA 68.00 1,700.00 7,007.00 7,007.00
Controls, Packers
m) 5-3/4” FS Overshot 1 EA 32.00 800.00 264.00 19,352.00
n) 5-3/4” Overshot
1 EA 32.00 800.00 264.00 16,400.00
Extension
o) 8-1/8” Oversized
1 EA 68.00 1,700.00 420.00 16,400.00
Guide
p) Basket Grapples and
1 EA 20.00 500.00 7,007.00 7,007.00
Mill Control

Tender Enquiry No. LTC/C/SDC/4920/20 Page 29 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Rate Operating Hole / Damaged
Rate Beyond Repair
CONTRACTOR
Count UOM Rate
EQUIPMENT
QAR
QAR QAR
per QAR
per per Day
Month
Day
q) Other similar items (to
be quoted by the Tenderer)
A1) Other tools not specified to be - - Refer Price Refer Price
Refer Price Book Refer Price Book
listed in Price Book Book Book
5. Circulating Subs with
redress kits
a) 8” Circulating Sub 1 EA 196.00 3,800.00 412.00 23,196.00
b) 6-1/2” Circulating Sub 168.00 3,648.00 320.00 18,796.00
1 EA
c) 5” Circulating Sub 1 EA 140.00 3,500.00 300.00 12,712.00
d) 3-1/2” Circulating Sub 100.00 2,500.00 264.00 10,796.00
1 EA
e) Other similar items (to
be quoted by the Tenderer)
A1) Other tools not specified to - - Refer Price Refer Price
Refer Price Book Refer Price Book
be listed in Price Book Book Book
6. Knuckle Joints 1 EA
a) For up to 17-1/2” hole
section and/or up to 13- 1 EA 316.00 4,800.00 640.00 P.O.R
3/8” casing
b) For up to 12-1/4” hole section
and/or up to 9- 1 EA 316.00 4,800.00 640.00 P.O.R
5/8” casing
c) For up to 8-1/2” hole
section and/or up to 7” 1 EA 316.00 4,800.00 640.00 P.O.R
casing
d) For up to 6” hole section
316.00 4,800.00 640.00 P.O.R
and/or up to 5-1/2” tubing 1 EA
e) Other similar items (to be
quoted by the Tenderer)
A1) Other tools not specified to be - - Refer Price Refer Price
Refer Price Book Refer Price Book
listed in Price Book Book Book
7. Bent Subs 1 EA
a) For up to 17-1/2” hole
section and/or up to 13- 1 EA
3/8” 316.00 4,800.00 640.00 P.O.R
casing

Tender Enquiry No. LTC/C/SDC/4920/20 Page 30 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost


Standby Operating in Hole /
Rate Rate Damaged
CONTRACTOR
Count UOM Beyond
EQUIPMENT
Repair Rate
QAR
QAR QAR
per QAR
per Day per Day
Month
b) For up to 12-1/4” hole section
and/or up to 9-5/8” casing 1 EA 316.00 4,800.00 640.00 P.O.R

c) For up to 8-1/2” hole section


and/or up to 7” casing 1 EA 316.00 4,800.00 640.00 P.O.R

d) For up to 6” hole section


and/or up to 5-1/2” tubing 1 EA 316.00 4,800.00 640.00 P.O.R

e) Other similar items


(to be quoted by the
Tenderer)
A1) Other tools not specified to - - Refer Price Refer Price Refer Price
Refer Price Book
be listed in Price Book Book Book Book
8. Safety Joints
a) 8” Safety Joint 1 EA 220.00 3,100.00 880.00 33,768.00
b) 6-1/2” Safety Joint 1 EA 180.00 2,100.00 640.00 17,224.00
c) Other similar items (to be
quoted by the Tenderer)
A1) Other tools not specified to - - Refer Price Refer Price Refer Price
Refer Price Book
be listed in Price Book Book Book Book
9. Spears
a) 18-5/8” Casing
1 EA 8,200.00 164,000.00 24,000.00 P.O.R
Spears
b) 13-5/8” Casing
1 EA 7,380.00 147,600.00 21,600.00 P.O.R
Spears
c) 13-3/8” Casing
1 EA 6,642.00 132,840.00 19,440.00 P.O.R
Spears
d) 9-5/8” Casing Spears 1 EA 6,642.00 132,840.00 19,440.00 P.O.R
e) 7” Casing Spears 1 EA 5,977.00 119,556.00 17,496.00 P.O.R
f) 5” Casing Spears 1 EA 5,977.00 119,556.00 17,496.00 P.O.R
g) Tubing Spears 1 EA 5,977.00 119,556.00 17,496.00 P.O.R
h) Drill Pipe Spears 1 EA 5,977.00 119,556.00 17,496.00 P.O.R
i) Packer Retrieval
1 EA 7,380.00 147,600.00 21,600.00 P.O.R
Spears
j) 7” Wire Rope Spear 1 EA 520.00 5,000.00 1,520.00 22,800.00

Tender Enquiry No. LTC/C/SDC/4920/20 Page 31 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating Hole / Damaged
Rate Rate Beyond Repair
CONTRACTOR
Count UOM Rate
EQUIPMENT
QAR
QAR QAR
per QAR
per Day per Day
Month
k) Accessories including
Extensions, Spear Stop, 1 EA 520.00 5,000.00 1,520.00 22,800.00
Pack-off
l) Other similar items (to
be quoted by the
Tenderer)
i) Other tools not specified Refer Price Refer Price Refer Price
Refer Price Book
to be listed in Price Book Book Book Book
ii) Other tools not specified Refer Price Refer Price Refer Price
Refer Price Book
to be listed in Price Book Book Book Book
10. Washover Equipment
a) 13-3/8” Drive Sub 1 EA 292.00 1,428.00 960.00 21,624.00
b) 13-3/8” X-over sub 1 EA 176.00 3,112.00 600.00 21,624.00
c) 16” Wash pipe 1 EA 300.00 2,748.00 1,160.00 45,872.00
d) 13-3/8” Burn Shoe 1 EA 300.00 3,100.00 1,160.00 37,624.00
e) 11-3/4” Drive Sub 1 EA 300.00 2,700.00 1,160.00 21,624.00
f) 11-3/4” X-over sub 1 EA 140.00 1,100.00 640.00 21,624.00
g) 11-3/4” Wash pipe 1 EA 300.00 1,900.00 1,160.00 37,600.00
h) 11-3/4” Burn Shoe 1 EA 300.00 3,500.00 1,160.00 41,032.00
i)Other similar items (to be
quoted by the Tenderer)
i) Other tools not specified to be Refer Price Refer Price Refer Price
Refer Price Book
listed in Price Book Book Book Book
ii) Other tools not specified to be Refer Price Refer Price Refer Price
Refer Price Book
listed in Price Book Book Book Book
11. Casing Cutters – for:
a) External Mechanical
1 EA P.O.R P.O.R P.O.R P.O.R
(All Sizes)
b) External Hydraulic
1 EA P.O.R P.O.R P.O.R P.O.R
(All Sizes)
c) Releasable Washover
External Tubing 1 EA P.O.R P.O.R P.O.R P.O.R
Cutter (All Sizes)
d) Internal Mechanical 1 EA P.O.R P.O.R P.O.R P.O.R
(All Sizes)
e) Hydraulic Multi- String
Internal Cutter (All Sizes)
i. 13-3/8” 1 EA 1,116.00 27,900.00 17,280.00 P.O.R

Tender Enquiry No. LTC/C/SDC/4920/20 Page 32 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating Hole / Damaged
Rate Rate Beyond Repair
CONTRACTOR
Count UOM Rate
EQUIPMENT
QAR
QAR QAR
per QAR
per Day per Day
Month
ii. 13-5/8” 1 EA 1,116.00 27,900.00 17,280.00 P.O.R
iii. 9-5/8” 1 EA 1,002.00 25,050.00 17,760.00 P.O.R
iv. 7” 1 EA 816.00 20,400.00 13,200.00 P.O.R
f) Clam Shell Cutter for 18-
5/8” casing (All Sizes) 1 EA P.O.R P.O.R P.O.R P.O.R

12. Taper Taps


a) For 2” thru 4-3/4” OD
1 EA 312.00 4,600.00 4,400.00 24,960.00
Catch
b) Other similar items Refer Price Refer Price Refer Price Book
Refer Price Book Book
(to be quoted by the
Book
Tenderer)
13. Die Collars
a) 8-3/8” OD For 4-3/4”
1 EA 312.00 4,600.00 4,400.00 24,960.00
thru 5” OD Catch
b) 8-3/8” OD For 6-1/4” 1 EA 312.00 4,600.00 4,400.00 24,960.00
thru 6-3/4 OD Catch
c) Other similar items (to be
quoted by the Tenderer)
i) Other tools not specified to Refer Price Refer Price Refer Price
Refer Price Book
be listed in Price Book Book Book Book
ii) Other tools not specified to Refer Price Refer Price Refer Price
Refer Price Book
be listed in Price Book Book Book Book
14. Casing Rollers 1 EA
a) For up to 13-3/8” casing 1 EA P.O.R P.O.R P.O.R P.O.R
b) For up to 9-5/8” casing 1 EA P.O.R P.O.R P.O.R P.O.R
c) For up to 7” casing 1 EA P.O.R P.O.R P.O.R P.O.R
d) For up to 5-1/2” tubing 1 EA P.O.R P.O.R P.O.R P.O.R
e) Other similar items (to be
quoted by the
Tenderer)
A1) Other tools not specified to Refer Price Refer Price Refer Price
Refer Price Book
be listed in Price Book Book Book Book
15. Casing Swages 1 EA
a) For up to 13-3/8” casing 1 EA P.O.R P.O.R P.O.R P.O.R
b) For up to 9-5/8” casing 1 EA P.O.R P.O.R P.O.R P.O.R
c) For up to 7” casing 1 EA P.O.R P.O.R P.O.R P.O.R
d) For up to 5-1/2” tubing 1 EA P.O.R P.O.R P.O.R P.O.R
Tender Enquiry No. LTC/C/SDC/4920/20 Page 33 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating Hole / Damaged
Rate Rate Beyond Repair
CONTRACTOR
Count UOM Rate
EQUIPMENT
QAR
QAR QAR
per QAR
per Day per Day
Month
e) Other similar items (to
be quoted by the
Tenderer)
A1) Other tools not
Refer Price Refer Price Refer Price
specified to be listed in Book Book Book
Refer Price Book
Price Book
16. Casing Patches for:
a) Up to 18-5/8” casing
i. External Mechanical 1 EA P.O.R P.O.R P.O.R P.O.R
ii. Internal Hydraulic 1 EA P.O.R P.O.R P.O.R P.O.R
iii. Internal Mechanical 1 EA P.O.R P.O.R P.O.R P.O.R
b) Up to 13-3/8” casing
i. External Mechanical 1 EA P.O.R P.O.R P.O.R P.O.R
ii. Internal Hydraulic 1 EA P.O.R P.O.R P.O.R P.O.R
iii. Internal Mechanical 1 EA P.O.R P.O.R P.O.R P.O.R
c) Up to 9-5/8” casing
i. External Mechanical 1 EA P.O.R P.O.R P.O.R P.O.R
ii. Internal Hydraulic 1 EA P.O.R P.O.R P.O.R P.O.R
iii. Internal Mechanical 1 EA P.O.R P.O.R P.O.R P.O.R
d) Up to 7” casing
i. External Mechanical 1 EA P.O.R P.O.R P.O.R P.O.R
ii. Internal Hydraulic 1 EA P.O.R P.O.R P.O.R P.O.R
iii. Internal Mechanical 1 EA P.O.R P.O.R P.O.R P.O.R
e) Up to 5-1/2” tubing
i. External Mechanical 1 EA P.O.R P.O.R P.O.R P.O.R
ii. Internal Hydraulic 1 EA P.O.R P.O.R P.O.R P.O.R
iii. Internal Mechanical 1 EA P.O.R P.O.R P.O.R P.O.R
17. Pipe Recovery
Equipment
a) Free point 1 EA P.O.R P.O.R P.O.R P.O.R
b) String Shot Back-off 1 EA P.O.R P.O.R P.O.R P.O.R
c) Jet Cutter 1 EA P.O.R P.O.R P.O.R P.O.R
d) Chemical Cutter 1 EA P.O.R P.O.R P.O.R P.O.R
e) Wireline Unit 1 EA P.O.R P.O.R P.O.R P.O.R
18. A 9-5/8” Cased Hole
Whip stock Systems
a) Hydraulic One Trip
1 EA 5,346.00 80,190.00 510,000.00 173,922.00
Systems
Tender Enquiry No. LTC/C/SDC/4920/20 Page 34 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating Hole / Damaged
Rate Rate Beyond Repair
CONTRACTOR
Count UOM Rate
EQUIPMENT
QAR
QAR QAR
per QAR
per Day per Day
Month
b) Mechanical One Trip
1 EA 5,346.00 80,190.00 510,000.00 173,922.00
Systems
c) Mechanical Two Trip
1 EA 5,346.00 80,190.00 510,000.00 173,922.00
Systems
d) Tenderer to quote for
all packers, mills,
orienting gyro, and
accessories
I. Other tools not
Refer Price Refer Price Refer Price
specified to be listed in Book Book Book
Refer Price Book
Price Book
II. Other tools not
Refer Price Refer Price Refer Price
specified to be listed in Refer Price Book
Book Book Book
Price Book
18. B 7” Cased Hole
Whip stock Systems
a) Hydraulic One Trip
1 EA 2,724.00 34,800.00 390,000.00 129,942.00
Systems
b) Mechanical One Trip
1 EA 2,724.00 34,800.00 390,000.00 129,942.00
Systems
c) Mechanical Two Trip
1 EA 2,724.00 34,800.00 390,000.00 129,942.00
Systems
d) Tenderer to quote for
all packers, mills,
orienting gyro, and
accessories
I. Other tools not
specified to be Refer Price Refer Price Refer Price
Refer Price Book
listed in Price Book Book Book
Book
II. Other tools not
Refer Price Refer Price Refer Price
specified to be listed in Book Book Book
Refer Price Book
Price Book
18. C 13-3/8” Cased Hole
Whipstock Systems
a) Hydraulic One Trip 1 EA 6,018.00 98,190.00 900,000.00 233,922.00
Systems

Tender Enquiry No. LTC/C/SDC/4920/20 Page 35 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL
b) Mechanical One Trip 1 EA 6,018.00 98,190.00 900,000.00 233,922.00
Systems
c) Mechanical Two Trip 1 EA 6,018.00 98,190.00 900,000.00 233,922.00
Systems
d) Tenderer to quote for
all packers, mills, 1 EA
orienting gyro, and
accessories
I. Other tools not
specified to be listed Refer Price Refer Price Refer Price
Refer Price Book
in Price Book Book Book Book

II. Other tools not


specified to be listed Refer Price Refer Price Refer Price
Refer Price Book
in Price Book Book Book Book

19. Open Hole Whip stock


1 EA
Systems
a) For up to 17-1/2” hole
section
1 EA 7,221.60 117,828.00 1,080,000.00 280,706.40
b) For up to 12-1/4” hole
section
1 EA 6,415.20 96,228.00 612,000.00 208,706.40
c) For up to 8-1/2” 1 EA 3,268.80 41,760.00 468,000.00 155,930.40
d) For up to 6” hole section 1 EA 2,724.00 34,800.00 390,000.00 129,942.00
e) Other similar items (to
be quoted by the
Tenderer)
A1) Other tools not
Refer Price Refer Price Refer Price
specified to be listed in Refer Price Book
Book Book Book
Price Book
20. Section Mill
1 EA
Systems
a) For up to 17-1/2”
hole section and/or
1 EA 7,700.00 137,500.00 1,107,590.00 P.O.R
up to 13-3/8”
casing
b) For up to 12-1/4”
hole section and/or 1 EA 5,500.00 137,500.00 667,590.00 P.O.R
up to 9-5/8” casing
c) For up to 8-1/2”
hole section and/or 1 EA 3,300.00 93,500.00 557,590.00 P.O.R
up to 7” casing
d) For up to 6” hole
section and/or up 1 EA 3,000.00 80,500.00 455,320.00 P.O.R
to 5-1/2” tubing

Tender Enquiry No. LTC/C/SDC/4920/20 Page 36 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL
e) Other similar items
(to be quoted by
the Tenderer)
A1) Other tools not
Refer Price Refer Price Refer Price
specified to be listed in Refer Price Book
Book Book Book
Price Book
21. Impression Blocks 1 EA
a) For up to 24” hole
section and/or up 1 EA P.O.R P.O.R P.O.R P.O.R
to 18-5/8” casing

Tender Enquiry No. LTC/C/SDC/4920/20 Page 37 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating Hole / Damaged
Rate Rate Beyond Repair
CONTRACTOR
Count UOM Rate
EQUIPMENT
QAR
QAR QAR
per QAR
per Day per Day
Month
b) For up to 17-1/2” hole
section and/or up to 13-3/8” 520.00 12,200.00 5,160.00 46,392.00
1 EA
casing
c) For up to 12-1/4”
hole section and/or up to 9- 1 EA 448.00 8,704.00 4,200.00 37,592.00
5/8” casing
d) For up to 8-1/2” hole
section and/or up to 7” 1 EA 360.00 7,904.00 3,624.00 25,424.00
casing
e) For up to 6” hole section
300.00 6,804.00 2,624.00 22,424.00
and/or up to 5-1/2” tubing 1 EA
f) Other similar items
(to be quoted by the
Tenderer)
A1) Other tools not
Refer Price Refer Price Refer Price
specified to be listed in Price Refer Price Book
Book Book Book
Book
22. Ditch Magnets 1 EA
a) For up to 24” hole section
500.00 12,500.00 2,560.00 63,560.00
and/or up to 18-5/8” casing 1 EA
b) For up to 17-1/2” hole
section and/or up to 13- 500.00 12,500.00 2,560.00 63,560.00
1 EA
3/8”casing
c) For up to 12-1/4” hole
section and/or up to 9-5/8” 1 EA 500.00 12,500.00 2,560.00 63,560.00
casing
d) For up to 8-1/2” hole
section and/or up to 7” 1 EA 500.00 12,500.00 2,560.00 63,560.00
casing
e) For up to 6” hole section
and/or up to 5-1/2” tubing 1 EA 500.00 12,500.00 2,560.00 63,560.00

f) Other similar items


(to be quoted by the
Tenderer)
A1) Other tools not
Refer Price Refer Price Refer Price
specified to be listed in Price Refer Price Book
Book Book Book
Book

Tender Enquiry No. LTC/C/SDC/4920/20 Page 38 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating Hole / Damaged
Rate Rate Beyond Repair
CONTRACTOR
Count UOM Rate
EQUIPMENT
QAR
QAR QAR
per QAR
per Day per Day
Month
23. JRC Collision Type
Severing Tools P.O.R P.O.R P.O.R P.O.R
(OPTIONAL)
a) Coiled Tubing Cutters 1 EA P.O.R P.O.R P.O.R P.O.R
b) Tubing Cutters 1 EA P.O.R P.O.R P.O.R P.O.R
c) Casing/Drill pipe Cutters P.O.R P.O.R P.O.R P.O.R
1 EA
d) Drill Collar Severing
1 EA P.O.R P.O.R P.O.R P.O.R
Tools
24.Downhole Magnets
P.O.R P.O.R P.O.R P.O.R
– include purchase price 1 EA
25. Correlation Gamma
Ray Logging 1 EA P.O.R P.O.R P.O.R P.O.R
(OPTIONAL)
26. Casing Caliper
Logging Services 1 EA P.O.R P.O.R P.O.R P.O.R
(OPTIONAL)
Specialized Equipment (SURFACE)
Controlled Heat Source for wellhead preheat and post heat including electric blanket
Add Additional 1
Equipment as Offered
1. 9-5/8” Wellhead pre Price will be
/ post heat including 1 EA 9,702.00 249,480.00 13,860.00 submitted upon
Technicians request (P.O.R)
2. 10 -3/4 ” Wellhead Price will be
pre / post heat 1 EA 11,319.00 291,060.00 16,170.00 submitted upon
including Technicians request (P.O.R)
3. 13-3/8" Wellhead Price will be
pre / post heat, 1 EA 13,791.00 354,618.00 19,701.00 submitted upon
including Technicians request (P.O.R)
4. 18-5/8" Wellhead Price will be
pre I post heat, 1 EA 22,915.50 535,680.00 32,736.00 submitted upon
including Technicians request (P.O.R)
5. Electrodes 1 EA Price will be
N/A N/A 154.00 submitted upon
request (P.O.R)
6. Hot -Check Test Price will be
1 EA
Apparatus 1,848.00 47,520.00 2,640.00 submitted upon
request (P.O.R)
Tender Enquiry No. LTC/C/SDC/4920/20 Page 39 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating Hole / Damaged
Rate Rate Beyond Repair
CONTRACTOR
Count UOM Rate
EQUIPMENT
QAR
QAR QAR
per QAR
per Day per Day
Month
7. Heat Treat Blanket Price will be
1 EA 739.20 19,008.00 1,056.00 submitted upon
(Rental)
request (P.O.R)
8. Set of Beveling
Band & Cutting
Price will be
Equipment (each
1 EA 2,772.00 71,280.00 3,960.00 submitted upon
with a different request (P.O.R)
size according to
conductor size
9. Tool Box complete
set of cutting
equipment oxy.&
Acet. Regulator,
chipping hemmers, Price will be
welding hoods, 1 EA 693.00 17,820.00 990.00 submitted upon
goggles, welding request (P.O.R)
gloves, measuring,
tapes, optical levels.
Set saucers.
Cutting; chic 1-2-3.
10. Rack of Oxygen & Price will be
1 EA 438.00 11,286.00 627.00 submitted upon
Acetylene
request (P.O.R)
11. Certified Welder
(AWS 6GR) 1 EA 4,126.00 123,795.00 4,126.00
Personnel
Hydraulic Torque Price will be
Wrench 1 EA 438.00 11,286.00 627.00 submitted upon
Equipment: request (P.O.R)
12. Bolt Torque up to 3 Price will be
1/8 including 1 EA 8,329.50 214,197.00 11,899.50 submitted upon
Technicians request (P.O.R)
Additional Price will be
Equipment Offered 1 EA N/A N/A N/A submitted upon
Cold Cutter : request (P.O.R)

Tender Enquiry No. LTC/C/SDC/4920/20 Page 40 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit Lost in


Standby Operating Hole / Damaged
Rate Rate Beyond Repair
CONTRACTOR
Count UOM Rate
EQUIPMENT
QAR
QAR QAR
per QAR
per Day per Day
Month
13. Cold cutting working
range 3" - 24" - 20
Price will be
rpm - wall thickness
1 EA 4,597.50 137,907.00 6,567.00 submitted upon
up to 100mm request (P.O.R)
including
Technicians.
14. Cold cutting working
range 24" - 36" - 13
Price will be
rpm - wall thickness
1 EA 6,445.50 165,726.00 9,207.00 submitted upon
up to 100mm request (P.O.R)
including
Technicians.
15. Habitat 4 x 4 x 2M Price will be
including accessories 1 EA 1,710.00 43,560.00 2,442.00 submitted upon
and Technicians request (P.O.R)

16. Shutdown/ Multi Price will be


Sensing Unit (6 1 EA 2,656.50 68,310.00 3,795.00 submitted upon
sensors) request (P.O.R)
17. ATEX certified AC Price will be
1 EA 808.50 20,790.00 1,155.00 submitted upon
unit 10 ton
request (P.O.R)
18. Welding Machine Price will be
1 EA 4,597.50 137,907.00 6,567.00 submitted upon
different sizes
request (P.O.R)

Notes:
Items which are meant to be consumed or left in the Well or which are supply items (e.g. Casing
Patches) , Lost In Hole rate shall be paid as DDP (Incoterm 2020) BASE, Sale price if called off by
COMPANY and used/consumed in the Well during operation.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 41 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Table E- Consumable Spare Parts

Description Spare Parts UOM Unit Rate (QAR)


1. Casing Spear grapple for 18-5/8” EA 39,192.00
2. Casing Spear grapple for 13-5/8” EA 14,524.00
3. Casing Spear grapple for 13-3/8” EA 10,752.00
4. Casing Spear grapple for 9-5/8” EA 14,240.00
5. Casing Spear grapple for 7” EA 18,532.00
6. Internal Hydraulic Casing cutter 13-5/8” EA 57,920.00
7. Internal Hydraulic Casing cutter 9-5/8” EA 49,120.00
8. Internal Hydraulic Casing cutter 7” EA 37,080.00
9. Inconel Packer Mill 6” OD 3-1/2” R (Pin) x 3-1/8” PRT (Pin) EA 21,632.00
10. Shoe Mill 6” OD 4 -3/4”ID c/w Extension & Drive Sub EA 13,800.00
11. Shoe Mill Carbide Dress LUMPSUM 15,800.00
12. Mill redress charge LUMPSUM 17,500.00

TOOLS, EQUIPMENT, AND CONSUMABLES AVAILABILITY

For all of the tools, equipment, and consumables listed throughout Table C-E:
a) CONTRACTOR shall at all times be responsible for and will ensure that it have enough primary
equipment and backup equipment in Qatar to support the number of COMPANY rigs in operation
at any given time.
b) CONTRACTOR shall support the COMPANY'S drilling program with all equipment and resources
necessary to provide adequate stock and cycle time to replenish purchased components, spares,
consumables and rental items pulled from CONTRACTOR'S inventory.
c) CONTRACTOR shall incorporate enough time in the restocking cycle schedule to permit customs
clearance, equipment preparations, quality checks, etc.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 42 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

For specific items listed below, CONTRACTOR agrees to stock the items at CONTRACTOR’s in-country
facility so as to be available to COMPANY at all times during the term of this CONTRACT. Payment for
the below items as be applicable only upon utilization at the WORK SITE.

Description Spare Parts Requirements

1. Casing spears for 18-5/8”, 13-5/8”, 13-3/8”, 9-


5/8”, 7”, and 5” casing strings. 2 ea Sizes

2. Internal hydraulic casing cutters for 7”, 9-5/8”,


and 13-5/8" casing 2 ea Sizes

3. One-trip whipstock assemblies for 13-5/8”, 9-


5/8” and 7” casing strings 2 ea Sizes

Tender Enquiry No. LTC/C/SDC/4920/20 Page 43 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

PART 3 - ADDITIONAL SERVICES


The services or EQUIPMENT outlined below are not required to meet minimum expectations for this
CONTRACT, but maybe of additional value to the COMPANY in reducing the operating cost or
improving site safety. COMPANY may elect to call off these services or EQUIPMENT in place of or in
addition to the packages described in Attachment B.
Table F- Call-Out Rental Tools (optional)

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
A. Tubular and Handling Tools
1. 3-1/2” Tubing,
12.95ppf, L80, Range
2 with PH6 coupling
(per foot charge –
Per 27.00 810.00 27.00 P.O.R
Include a list of all 1
Foot
other tubing sizes,
weights, grades, and
connections below)
Other similar sizes
a) ………… P.O.R P.O.R P.O.R P.O.R
b) P.O.R P.O.R P.O.R P.O.R
2. 3-1/2” Fiberglass
Tubing with PH6
coupling (per foot
charge – Include a
Per
list of all other P.O.R P.O.R P.O.R P.O.R
1 Foot
fiberglass tubing
sizes, weights,
grades, and
connections below)
Other similar sizes P.O.R P.O.R P.O.R P.O.R
a) ………… P.O.R P.O.R P.O.R P.O.R
b) P.O.R P.O.R P.O.R P.O.R

Tender Enquiry No. LTC/C/SDC/4920/20 Page 44 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Cou UOM Operating Hole /
nt Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
3. 3-1/2” Tubing Slip- Type
Elevators (Include a list
of all other types of 3-
450.00 13,500.00 450.00 P.O.R
1/2” elevators and 1 EA
corresponding ton
ratings below)
Tenderer to quote
other similar
elevators of 3 ½”
sizes
a) P.O.R P.O.R P.O.R P.O.R
b) P.O.R P.O.R P.O.R P.O.R
4. 3-1/2” Tubing Slips
(Include a list of all
other types of 3-1/2”
1 EA 72.00 2,160.00 72.00
slips and corresponding
ton
ratings below) P.O.R
Tenderer to quote
other similar slips of
3 ½” sizes
a) P.O.R P.O.R P.O.R P.O.R
b) P.O.R P.O.R P.O.R P.O.R
5. 3-1/2” Manual Tubing
Tongs (Include a list of
all other types of 3-1/2”
tongs and 1 EA 264.00 7,920.00 264.00
corresponding ton
ratings below)
P.O.R
Tenderer to quote other
similar tongs of
3 ½” sizes
a) P.O.R P.O.R P.O.R P.O.R

Tender Enquiry No. LTC/C/SDC/4920/20 Page 45 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
b) … P.O.R P.O.R P.O.R P.O.R
6. Lift Subs for 3-1/2”
PH6 Tubing (Include
a list of all other
types of 3-1/2” lift 1 EA 48.00 1,440.00 48.00
subs and
corresponding
connections below) P.O.R
Tenderer to quote
other similar lift subs
of 3 ½” size
a) P.O.R P.O.R P.O.R P.O.R
b) P.O.R P.O.R P.O.R P.O.R
7. Drill String Full Openin
Safety Valves (FOSV)
for:
a) 3-1/2” PH6 1 EA 422.00 10,560.00 422.00 P.O.R
b) 3-1/2” IF 1 EA 360.00 9,000.00 360.00 P.O.R
c) 4-1/2” IF 1 EA 393.00 9,840.00 393.00 P.O.R
d) All other types of 1
FOSV’s and
P.O.R P.O.R P.O.R P.O.R
corresponding
connections
8. Inside BOP’s for:
a) 3-1/2” PH6 1 EA 422.00 10,560.00 422.00 P.O.R
b) 3-1/2” IF 1 EA 360.00 9,000.00 360.00 P.O.R
c) 4-1/2” IF 1 EA 384.00 9,600.00 384.00 P.O.R
d) 5-1/2” FH 1 EA 312.00 7,800.00 312.00 P.O.R
e) 6-5/8” FH 1 EA 432.00 10,800.00 432.00 P.O.R
f) All other types of
Inside BOPs and 1
P.O.R P.O.R P.O.R P.O.R
corresponding
connections
9. Drop-in Check Valves
for :
Tender Enquiry No. LTC/C/SDC/4920/20 Page 46 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
a) 3-1/2” IF 1 EA 360.00 9,000.00 360.00 P.O.R
b) 4-1/2” IF 1 EA 384.00 9,600.00 384.00 P.O.R
c) All other types of
DICV’s and
P.O.R P.O.R P.O.R P.O.R
corresponding 1
connections
10. Drill String Float
Valves (DSFV) for:
a) 3-1/2 IF 1 EA 249.00 6,240.00 249.00 P.O.R
b) 4-1/2” IF 1 EA 249.00 6,240.00 249.00 P.O.R
c) 6-5/8” Regular 1 EA 312.00 7,800.00 312.00 P.O.R
d) Tenderer to quote for
all other DSFV’s &
corresponding
connections below
i) P.O.R P.O.R P.O.R P.O.R
ii) P.O.R P.O.R P.O.R P.O.R
11. Crossover Subs for 3-
1/2” PH6 (Include a
list of all other types
of XO’s and
corresponding
connections below)
a) EA P.O.R P.O.R P.O.R P.O.R
b) EA P.O.R P.O.R P.O.R P.O.R
12. Pup Joints for 3-1/2”
PH6
a) 5 ft 1 EA 57.00 1,440.00 57.00 P.O.R
b) 10 ft 1 EA 86.00 2,160.00 86.00 P.O.R
c) 15 ft 1 EA 115.00 2,880.00 115.00 P.O.R
d) Tenderer to quote for 1
all other pup joints &
corresponding
connections below
Tenderer to quote
Tender Enquiry No. LTC/C/SDC/4920/20 Page 47 of 63 (Revision 1) Attachment C
Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
a) … P.O.R P.O.R P.O.R P.O.R
b) … P.O.R P.O.R P.O.R P.O.R
13. Pump-in Sub’s with
1502 Weco thread
half for:
a) 3-1/2” PH6 1 EA 358.00 10,764.00 358.00 P.O.R
b) 3-1/2” IF 1 EA 248.00 7,452.00 248.00 P.O.R
c) 4-1/2” IF 1 EA 303.00 9,108.00 303.00 P.O.R
d) Tenderer to include a
list of all other types of
Pump-in Sub’s and
corresponding
connections below)
i)…… P.O.R P.O.R P.O.R P.O.R
ii)….. P.O.R P.O.R P.O.R P.O.R
14. Tubular Drifts for :
a) Up to 3-1/2” OD 1 EA 44.00 1,324.00 44.00 P.O.R
b) From 4” to 5-1/2” OD 1 EA 55.00 1,656.00 55.00 P.O.R
c) From 6-5/8” to 7-5/8” 1 EA
55.00 1,656.00 55.00 P.O.R
OD
d) From 8-5/8” to 10-3/4” 1 EA
55.00 1,656.00 55.00 P.O.R
OD
e) Tenderer to include a
list of all other types of
drifts and
corresponding
connections below
i) ….. P.O.R P.O.R P.O.R P.O.R
ii) ….. P.O.R P.O.R P.O.R P.O.R

Tender Enquiry No. LTC/C/SDC/4920/20 Page 48 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
15. 2-7/8” Drill Pipe, 10.4
ppf, Grade S, IF
Range II (Per foot
charge)
Per
Tenderer to include a 1 34.00 497.00 34.00
foot
list of all other 2-7/8”
DP, weights, grades,
and connections
below)
P.O.R
i) … P.O.R P.O.R P.O.R P.O.R
ii) … P.O.R P.O.R P.O.R P.O.R
16. 3-1/2” Drill Pipe, 13.3
ppf, Grade E, Range
II, NC38 (Per foot
charge)
Per
Tenderer to include a 29.00 595.00 29.00 P.O.R
1 foot
list of all other 3-1/2”
DP, weights, grades,
and connections
below)
i) …… P.O.R P.O.R P.O.R P.O.R
ii) …... P.O.R P.O.R P.O.R P.O.R
17. 3-1/2” Heavyweight
Drill Pipe, 29 ppf,
Range II, NC38 (Per
foot charge)
Per
Tenderer to include a 1 45.00 1,353.60 45.00 P.O.R
foot
list of all other 3-1/2”
HWDP, weights,
grades, and
connections below
i) ….. P.O.R P.O.R P.O.R P.O.R
ii) …... P.O.R P.O.R P.O.R P.O.R

Tender Enquiry No. LTC/C/SDC/4920/20 Page 49 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
18. 4” Drill Pipe, 14.0
ppf, Grade G, Range
II, DPDS40 (Per foot
charge) Per
31.00 926.00 31.00 P.O.R
Tenderer to include a 1 foot
list of all other 5” DP,
weights, grades, and
connections below
i) ……. P.O.R P.O.R P.O.R P.O.R
ii) ……. P.O.R P.O.R P.O.R P.O.R
19. 5” Drill Pipe, 19.5
ppf, Grade E, Range
II, NC50 (Per foot
charge) – Per
1 32.00 749.00 32.00 P.O.R
Tenderer to include a foot
list of all other 5” DP,
weights, grades, and
connections below
i) ………. P.O.R P.O.R P.O.R P.O.R
ii) ………. P.O.R P.O.R P.O.R P.O.R
20. 5” Heavyweight Drill
Pipe, 50 ppf, Range
II, NC50 (Per foot
charge)
Per
Tenderer to include a 33.00 2,030.00 33.00 P.O.R
1 foot
list of all other 5”
and 6-5/8” HWDP,
weights, grades, and
connections below
i) ….. P.O.R P.O.R P.O.R P.O.R
ii) …... P.O.R P.O.R P.O.R P.O.R
21. 5” Enhanced
Performance Drill
Pipe for:

Tender Enquiry No. LTC/C/SDC/4920/20 Page 50 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
Per
a) 6-5/8” x 4.0”, 86 ppf 1 29.00 864.00 29.00 P.O.R
foot
Per
b) 6-5/8” x 5.3”, 44 ppf 1 29.00 864.00 29.00 P.O.R
foot
Per
c) 5-1/2” x 4.5”, 33 ppf 1 29.00 864.00 29.00 P.O.R
foot
Per
d) 5” x 2.8”, 50 ppf 1 29.00 864.00 29.00 P.O.R
foot
Per
e) 5” x 4”, 29 ppf 1 29.00 864.00 29.00 P.O.R
foot
Per
f) 3-1/2” x 2.25”, 22 ppf 1 29.00 864.00 29.00 P.O.R
foot
g) 3-1/2” x 2.5”, 18.9 ppf
(Per foot charge)
Tenderer to include a Per
29.00 864.00 29.00 P.O.R
list of all other DP, 1 foot
weights, grades, and
connections below
i) P.O.R P.O.R P.O.R P.O.R
ii) P.O.R P.O.R P.O.R P.O.R
22. 2-7/8” Rotary Hand
1 EA 66.00 1,987.00 66.00 P.O.R
Slip
23. 2-7/8” 150 Ton
1 EA 359.00 10,764.00 359.00 P.O.R
Elevators
24. 5-1/2” Drill Pipe, 21.9
ppf, Grade G, Range
II, 5-1/2” FH (Per foot
charge) Per
1 31.20 936.00 31.20 P.O.R
Tenderer to include a foot
list of all other 5” DP,
weights, grades, and
connections below
i) P.O.R P.O.R P.O.R P.O.R
ii) P.O.R P.O.R P.O.R P.O.R
25. 4” Rotary Hand Slip 1 EA P.O.R P.O.R P.O.R P.O.R

Tender Enquiry No. LTC/C/SDC/4920/20 Page 51 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
26. 4” 250 Ton Elevators 1 EA 359.0 10,764.00 358.80 P.O.R
27. 5-1/2” Rotary Hand
1 EA 66.00 1,987.00 66.00 P.O.R
Slip
28. 5-1/2” 250 Ton
1 EA 386.00 11,592.00 386.00 P.O.R
Elevators
29. 6-5/8” Drill Pipe, 27.7
ppf, Grade G, Range
II, 6-5/8” FH(Per foot
charge)
Per
Tenderer to include a 45.00 1,354.00 45.00 P.O.R
1 foot
list of all other 6-5/8”
DP, weights, grades,
and connections
below
i) P.O.R P.O.R P.O.R P.O.R
ii) P.O.R P.O.R P.O.R P.O.R
30. 6-5/8” Rotary Hand
1 EA 188.00 5,640.00 188.00 P.O.R
Slip
31. 6-5/8” 350 Ton
1 EA 740.00 22,200.00 740.00 P.O.R
Elevators
32. 9-1/2” OD x 3” ID
Drill Collars, 6-5/8” Per
1 167.20 5,016.00 167.20 P.O.R
Regular (Per joint joint
charge)
33. 8” OD x 2-13/16” ID
Drill Collars, 6-5/8” Per
149.60 4,488.00 149.60 P.O.R
Regular (Per joint 1 joint
charge)
34. 6-1/2” OD x 2-3/4” ID
Per
Drill Collars, 4-1/2” 1 132.00 3,960.00 132.00 P.O.R
joint
XH (Per joint charge)
35. 4-3/4” OD x 2-1/4” ID
Drill Collars, 3-1/2” IF 1 Per 112.00 3,360.00 112.00 P.O.R
(per joint charge) joint

Tender Enquiry No. LTC/C/SDC/4920/20 Page 52 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
36. Add Additional
Equipment as
Required
i) P.O.R P.O.R P.O.R P.O.R
37. Limar Grub Screw
Connector- 2" OD
1 EA 200.00 3,600.00 520.00 23,424.00
CTU-2-3/8" PAC DSI
PIN
38. Limar Grub Screw
Connector- 2" OD
1 EA 200.00 3,600.00 520.00 23,424.00
CTU-2-3/8" PAC DSI
PIN
39. GRUB SCREW
CONNECTOR -2" OD
CTU PREPARATION 1 EA 200.00 3,600.00 520.00 23,424.00
TOOL W/ 2-3/8" PAC
BOX CONN
40. 40. 4.00"OD-LIMAR-
SERIES 2 FLO-
RELEASE
1 EA 1,424.00 32,000.00 3,088.00 41,112.00
OVERSHOOT -2-
3/8" PAC DSI BOX
CONNECTION
41. Limar Non rotating
Stabilizer- sleeves 1 EA 740.00 22,200.00 740.00 740.00
5.75" OD
42. 5.750" OD Non-
Rotating Stabilizer 1 EA 740.00 22,200.00 740.00 740.00
Sleeve
43. 5-1/2" BOWL 1 EA 200.00 3,600.00 520.00 23,424.00
44. 5-1/2" SLIP ASSY FOR
BOWL ( FITTED WITH 1 EA 200.00 3,600.00 520.00 23,424.00
2 7/8 INSERT)
45. 3 1/2 ID C PLATE 1 EA 200.00 3,600.00 520.00 23,424.00

Tender Enquiry No. LTC/C/SDC/4920/20 Page 53 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
46. 2-7/8" OD; "Carsac"
Thru Torque Connect
1 EA 200.00 3,600.00 520.00 23,424.00
2 3/8" PAC DSI BOX X
PIN
47. SAFETY CLAMP WITH
1 EA 200.00 3,600.00 520.00 23,424.00
SPANNER
48. Ported Sub with 1-
9/16" Sucker Rod x 2-
1 EA 224.00 3,600.00 624.00 14,624.00
3/8" PAC DSI Box
Connection OAL: 20"
49. Ported Sub with 1-
9/16" Sucker Rod x 2-
1 EA 224.00 3,600.00 624.00 14,624.00
3/8" PAC DSI Box
Connection OAL: 20"
50. SUB, CROSSOVER -
(2-7/8 CONN) -;
2.875 OD W/ 2- 1 EA 200.00 3,600.00 520.00 23,424.00
3/8 PAC PIN X 2-3/8
PAC-DSI BOX
51. 2-3/8" PAC DSI BOX X
2-3/8" PAC PIN
CONNECSTIONS-
1 EA 200.00 3,600.00 520.00 23,424.00
CROSSOVER
ADAPTER 2.875" OD,
1.375" 8" STS.
52. SUB, CROSSOVER -
(2-7/8 CONN) -;
2.875 OD W/ 2- 1 EA 200.00 3,600.00 520.00 23,424.00
3/8 PAC-DSI PIN X 2-
3/8 PAC BOX
53. ADAPTER,
CROSSOVER - 2 3/8
1 EA 200.00 3,600.00 520.00 23,424.00
PAC DSI PIN x 2 3/8
PAC BOX

Tender Enquiry No. LTC/C/SDC/4920/20 Page 54 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
54. FINDER, ADJUSTABLE
WIRELINE - 4 1/2 1 EA 448.00 9,200.00 816.00 29,744.00
NOM OD;
55. Grab Arms - 3 prong -
3.5" OD - 1020-3500- 1 EA 448.00 9,200.00 816.00 29,744.00
02-3-M27-R0
56. Limar Slimline
Cutting Overshot -
3.375" OD, 3.125" - 1 EA 1,424.00 32,000.00 3,088.00 41,112.00
12 SA box
Connection
57. LIMAR Crossover
Adapter 3.375" OD-
1 EA 1,424.00 32,000.00 3,088.00 41,112.00
1"ID, 8" OAL [LOT17-
212-10813-01-1]
58. Limar
ContinousContinuous
Pack Off Sub - 3.5" 1 EA 1,424.00 32,000.00 3,088.00 41,112.00
OD , 2.813" - 12 SA
Box x Pin connection
B. Downhole Tools and Accessories
1. Stabilizers for :
a) 36” OD (welded 1 EA
782.00 23,460.00 814.00 177,192.00
blade)
b) 24” to 22” OD
1 EA 598.00 17,940.00 760.00 123,584.00
(welded blade)
c) 17-1/2” to 16” OD
1 EA 414.00 12,420.00 520.00 104,208.00
(integral blade)
d) 14” to 12” OD
1 EA 322.00 9,660.00 336.00 67,696.00
(integral blade)
e) 8-1/2” to 7” OD
1 EA 230.00 6,900.00 230.00 43,696.00
(integral blade)
f) 6” to 5” OD
1 EA 202.00 6,072.00 202.00 30,896.00
(integral blade)

Tender Enquiry No. LTC/C/SDC/4920/20 Page 55 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
g) Tenderer to include
list of all other
stabilizers below
i) P.O.R P.O.R P.O.R P.O.R
ii) P.O.R P.O.R P.O.R P.O.R
2. Roller Reamers for :
a) 17-1/2” to 16” OD 1 EA P.O.R P.O.R P.O.R P.O.R
b) 14” to 12” OD 1 EA P.O.R P.O.R P.O.R P.O.R
c) 8-1/2” to 7” OD 1 EA P.O.R P.O.R P.O.R P.O.R
d) 6” to 5” OD 1 EA P.O.R P.O.R P.O.R P.O.R
e) Tenderer to include
list of all other
roller reamers
below
i) P.O.R P.O.R P.O.R P.O.R
ii) P.O.R P.O.R P.O.R P.O.R
3. Double-Acting
Hydraulic Drilling Jars
for:
a) 9-1/2” OD 1 EA 4,856.00 112,912.00 4,856.00 1,617,192.00
b) 8” OD 1 EA 3,776.00 94,400.00 3,776.00 1,147,584.00
c) 6-1/2” OD 1 EA 3,552.00 88,800.00 3,552.00 904,208.00
d) 4-3/4” OD 1 EA
2,656.00 66,400.00 2,656.00 659,696.00
e) Tenderer to include
list of all other
surface and
downhole jars
below
i) P.O.R P.O.R P.O.R P.O.R
ii) P.O.R P.O.R P.O.R P.O.R
4. Double-Acting
Hydraulic Jar
Accelerators for:
a) 9-1/2” OD 1 EA 5,128.00 128,200.00 5,128.00 1,617,192.00

Tender Enquiry No. LTC/C/SDC/4920/20 Page 56 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
b) 8” OD 1 EA 4,216.00 105,400.00 4,216.00 1,147,584.00
c) 6-1/2” OD 1 EA 3,872.00 96,800.00 3,872.00 904,208.00
d) 4-3/4” OD 1 EA 2,656.00 66,400.00 2,656.00 659,696.00
e) Tenderer to include list
of all other
accelerators below
i) P.O.R P.O.R P.O.R P.O.R
ii) P.O.R P.O.R P.O.R P.O.R
5. Non-Rotating Drill
Pipe & Casing
Protectors for:
a) 5-1/2” DP 1 EA P.O.R P.O.R P.O.R P.O.R
b) 5” DP 1 EA P.O.R P.O.R P.O.R P.O.R
c) 3-1/2” DP 1 EA P.O.R P.O.R P.O.R P.O.R
d) Tenderer to include list
of all other DP
protectors below
i) P.O.R P.O.R P.O.R P.O.R
ii) P.O.R P.O.R P.O.R P.O.R
6. Casing Scrapers
(rotating and non- 1
rotating) for:
a) 7” casing 1 EA 540.00 11,364.00 3,588.00 125,544.00
b) 5” casing 1 EA 216.00 7,128.00 1,764.00 101,544.00
c) Tenderer to include
list of all other
casing scrapers
below
i) P.O.R P.O.R P.O.R P.O.R
ii) P.O.R P.O.R P.O.R P.O.R
7. Tenderer to add
Additional
Equipment as
Required

Tender Enquiry No. LTC/C/SDC/4920/20 Page 57 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
i) P.O.R P.O.R P.O.R P.O.R
ii) P.O.R P.O.R P.O.R P.O.R
C. Through Tubing (TT) Equipment

1. 2” CT Connector
External Slip 1” to 2 1 EA 200.00 3,600.00 520.00 23,424.00
3/8” CT
2. 2.875” CT Connector
External Slip 2 7/8” 1 EA 200.00 3,600.00 520.00 22,224.00
to 3 1/2” CT
3. 2.875” Motor Head
Assembly CW DFCV,
1 EA 2,688.00 62,800.00 6,304.00 51,200.00
Circ Sub &
Disconnect
4. 2.875” Thru Tubing
Accelerator (Dual 1 EA 2,000.00 45,000.00 23,664.00 74,304.00
Acting)
5. 2.875” Thru Tubing
Jar (Oil Jar, Dual 1 EA 2,000.00 45,000.00 23,504.00 74,304.00
Acting)
6. 2.875” HD
1 EA 672.00 14,800.00 2,336.00 22,624.00
Disconnect
7. Flow Release
Overshot c/w 4-1/8”
Oversized Guide to EA 1,424.00 32,000.00 3,088.00 41,112.00
1
catch 0.875” to
3.125”EFN
8. Bowen S150
Overshot c/w 5-1/2”
1 EA 512.00 11,600.00 1,696.00 38,624.00
OD Oversized Guide
to catch xxxx”

Tender Enquiry No. LTC/C/SDC/4920/20 Page 58 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
9. GS Flow Release
Pulling Tool For 3" GS
EA 1,424.00 30,400.00 4,688.00 49,504.00
Fishneck , (Inclusive 1
of one Grapple set)
10. 3.375” Through
1 EA 2,272.00 58,800.00 43,040.00 611,200.00
Tubing Motor
11. 5.75” Mill/Shoe
EA 1,504.00 37,600.00 55,024.00 130,304.00
(Tungsten Carbide) 1
12. 2.875” Overshot
Extension (as 1 EA 448.00 9,200.00 816.00 29,744.00
Required)
13. 3.375” Continuous
Cutting Coil Overshot
For 2” OD CT ( EA 752.00 11,600.00 896.00 56,936.00
1
Inclusive of one
Grapple Set)
14. 5.5” Stabilizer/
1 EA 672.00 14,800.00 2,688.00 25,024.00
Bladed
15. 2.875” Lift Sub 1 EA 176.00 4,200.00 176.00 19,104.00
16. 2.875” Safety Clamp 1 EA 120.00 2,600.00 120.00 9,504.00
17. 2.875”Pull/PT Sub 1 EA 176.00 4,200.00 176.00 19,104.00
18. Landing Plate 1 EA 40.00 1,000.00 40.00 5,504.00
19. 3.5” Wire Grab
Assembly 03.50" OD
1 EA 448.00 9,200.00 816.00 29,744.00
W/ 2-3/8" PAC DSI
Box
20. 2.88” Weight Bar,
2.88" OD, 1.38" ID,
1 EA 672.00 14,800.00 1,136.00 6,624.00
5.00' LG, W/ 2-3/8"
PAC
21. 3.5”DSI Box X PIN 1 EA 224.00 3,600.00 624.00 14,624.00
22. 3.5”Venturi Junk
1 EA 1,320.00 25,360.00 6,304.00 37,184.00
Basket

Tender Enquiry No. LTC/C/SDC/4920/20 Page 59 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

Per Unit
Lost in
Count UOM Operating Hole /
Standby Rate Damaged
EQUIPMENT
Rate Beyond
Repair
rate
(QAR/day) (QAR/month) (QAR/day) QAR
23. 3.5” Through High
Power/Hi Temp 1 EA 480.00 7,600.00 4,280.00 34,544.00
Magnet
24. 3.5” Lead Impression
1 EA 256.00 4,400.00 6,680.00 22,624.00
Block (LIB)
25. 3.5” Jetting Nozzle 1 EA 176.00 3,600.00 1,880.00 14,624.00
26. 2.875” Swivel sub 1 EA 176.00 3,600.00 280.00 14,624.00
27. 5 ½” Rotary Hand
Slip (5.5” to 2.875” 1 EA 120.00 2,600.00 120.00 9,504.00
Inserts)
28. Venturi Jet Junk
Basket with one
extension 1 EA 1,600.00 33,360.00 9,024.00 45,424.00
(HYDRAULIC JUNK
RETRIEVAL TOOL)
29. 5” Venturi Jet Junk
Basket Fingers
(HYDRAULIC JUNK 1 EA 1,600.00 33,360.00 9,024.00 45,424.00
RETRIEVAL TOOL
CATCHER FINGERS)
30. 5” Carbide Dressed
Scallop Bottom 1 EA 600.00 10,000.00 5,136.00 41,080.00
Burning Shoe
31. 5” Venturi Jet Junk
1 EA 672.00 14,800.00 1,568.00 22,192.00
Basket - Extension
Notes:
a) Tenderer to specify the mobilisation timelines required to mobilise the above equipment/tool
category from the date of issue of ITP.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 60 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

PART 4 - PRICE BOOK AND THIRD PARTY GOODS, EQUIPMENT AND SERVICES
4.1 PRICE BOOK
4.1.1 For additional GOODS, CONTRACTOR EQUIPMENT, services, materials and CONTRACTOR
PERSONNEL which are not listed elsewhere in Attachment C Pricing Tables but are available in
CONTRACTOR’s Price Book and are required in relation to WORK, it shall be requested by
means of ITPs. Upon delivery or mobilisation of such additional items and acceptance,
COMPANY shall compensate the CONTRACTOR as per the rates specified in CONTRACTOR’s
Price Book less the applicable Price Book Discounts

Price Book Name Reference Number or Date


MENA Price Book 2020 Rev2 MENA Price Book 2020 Rev2

4.1.2 All price book items delivery terms shall be DDP COMPANY BASE (INCOTERMS 2020) unless
agreed otherwise is writing by both PARTIES.
4.1.3 The following percentage discounts shall apply to Price Book line items during the term of the
CONTRACT:

1st Optional Extension 2nd Optional Extension


Item Primary Term
Term (1 Year) Term (1 Year)

Discount off Price Book line items for


WORK (%):

CONTRACTOR EQUIPMENT Rental


Rates 6% 7% 8%

Equipment Service Rates 6% 7% 8%

GOODS 6% 7% 8%

PERSONNEL 6% 7% 8%

It is the expectation of the COMPANY that the % discounts will increase for each subsequent
year.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 61 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

4.2 THIRD PARTY EQUIPMENT AND SERVICES


COMPANY shall reimburse the CONTRACTOR for provision of miscellaneous other materials
and services provided by a third party at actual net documented cost plus a percentage mark
up as detailed in Table below provided that such additional materials and services are:
(i) required solely for the performance of the WORK and which are not included in Attachment
C - Compensation and Payment,
(ii) are provided by a third party,
(iii) are requested by COMPANY in writing via a Call Off Order or ITP, and
(iv) are provided at demonstrably competitive rates.
Item Third Party Price Mark-up (%)
1 0 QAR to 37,000 QAR +5%
2 37,001 QAR to 182,000 QAR +3%
3 >182,000 QAR +2%

No additional percentage mark-up shall apply on any third party GOODS, equipment,
materials and/or services utilised by COMPANY on CONTRACTOR's provided equipment and
services as part of this CONTRACT and the above percentage mark- up shall include all the
administrative and ancillary cost incurred by the CONTRACTOR.

Tender Enquiry No. LTC/C/SDC/4920/20 Page 62 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

PART 5 - PRICE ADJUSTMENT FOR OPTIONAL CONTRACT EXTENSIONS


The following percentage adjustments (±) shall individually apply to the rates listed in Attachment C,
Part 2 and 3 for any additional WORK after completion of the Primary Term of this CONTRACT.

Item Term PERSONNEL EQUIPMENT/GOODS

1 1st Year of the Optional CONTRACT Term ±0% ±0%

2 2nd Year of the Optional CONTRACT Term ±0% ±0%

Notes:
1. The price adjustments for each year will be calculated from the base rate (i.e. initial rate) and
not on cumulative basis.
2. In the above table, specifically indicate, + or

Tender Enquiry No. LTC/C/SDC/4920/20 Page 63 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
Classification: Confidential

CONFIDENTIAL

PART 6 – VOLUME DISCOUNTS


6.0 VOLUME DISCOUNT BASED ON INVOICED VALUE DURING TERM OF CONTRACT FROM
CONTRACT COMMENCEMENT DATE.
A. CONTRACTOR shall apply a Volume Discount percentage based on CONTRACTOR’s Gross
Revenue under this CONTRACT, in accordance with this Section.
B. The Volume Discount shall be applied on an incremental basis; hence each percentage
shall be applied to the amount within that band.
C. Calculation example assuming a Gross Revenue of QAR 480,000 during a year, the volume
discount will be:
Band (QAR) Amount in Band Discount Applied Value of Discount in QAR
0 to 300,000 300,000 3% 9,000
300,001 to 400,000 100,000 6% 6,000
400,001 to 1 000,000 80,000 8% 6,400
480,000 21,400

D. The Gross Revenue shall be defined as the sum of all charges invoiced to COMPANY by
CONTRACTOR.
E. The Volume Discount shall be calculated for each anniversary year, at the end of every
year during the Term of the CONTRACT and shall be reimbursed to COMPANY by issue of
a credit note.
F. The credit note for each year during the Term shall be issued for COMPANY’s approval
within fourteen (14) days of the end of the year in question.
G. The applicable Volume Discount percentages shall be as follows:

Cumulative Value, QAR Volume Discount (%)


0-1,000,000 0
1,000,001-2,500,000 0
2,500,001-5,000,000 1.5%
Above 5,000,000 2.0%

Tender Enquiry No. LTC/C/SDC/4920/20 Page 64 of 63 (Revision 1) Attachment C


Provision of Fishing and Drilling Tools Rental Services Compensation and Payment
.

4 LIST OF EXCEPTIONS

4 LIST OF EXCEPTIONS
Page 71 All Rights Reserved
Confidential and Proprietary
Reproduction by Permission
CONTRACTOR EXCEPTIONS TO QATAR TATWEEN

CONTRACT FOR PROVISION OF FISHING & DRILLING TOOLS AND RENTAL SERVICES

Contractor: Wellbore Integrity Solutions

Reference Relevant Text of the Article Tenderer’s Proposed Change Marked up from Original Language Has Tenderer specified
Page & Price
Article Implication for
Withdrawal of
Qualification
CONTRACTOR represents, acknowledges,
9.1(c) Tenderer requests to delete the entire clause 9.1.c. Not quantifiable
warrants and guarantees that:
CONTRACTOR represents, acknowledges, warrants and guarantees
c) all GOODS, services, equipment or materials that :
shall be fit for the intended purpose and use c) all GOODS, services, equipment or materials shall be fit for the
specified in, or reasonably to be inferred from, intended purpose and use specified in, or reasonably to be
this CONTRACT inferred from, this CONTRACT
CONTRACTOR shall be liable for and indemnify CONTRACTOR COMPANY shall be liable for and indemnify and
10.4(c) Not quantifiable
and save harmless COMPANY against all claims save harmless CONTRACTOR COMPANY against all claims relating
relating to loss or damage of property of to loss or damage of property of COMPANY caused by
COMPANY caused by CONTRACTOR up to a CONTRACTOR up to a maximum of US$1,000,000 (One Million U.S.
maximum of US$1,000,000 (One Million U.S. Dollars) per occurrence unless caused by the GROSS NEGLIGENCE
Dollars) per occurrence unless caused by the or WILFUL MISCONDUCT of CONTRACTOR, in which case
GROSS NEGLIGENCE or WILFUL MISCONDUCT CONTRACTOR shall be liable for its GROSS NEGLIGENCE or WILFUL
of CONTRACTOR, in which case CONTRACTOR MISCONDUCT.
shall be liable for its GROSS NEGLIGENCE or
WILFUL MISCONDUCT.
Reference Relevant Text of the Article Tenderer’s Proposed Change Marked up from Original Language Has Tenderer specified
Page & Price
Article Implication for
Withdrawal of
Qualification
If the equipment is declared lost by COMPANY
10.9(b)(ii) If the equipment is declared lost by COMPANY under Article 10.9 Not quantifiable
under Article 10.9 (a) (ii) above or damaged
(a) ii) above or damaged beyond repair, COMPANY shall reimburse
beyond repair, COMPANY shall reimburse
CONTRACTOR as per the Damaged beyond repair prices / Lost in
CONTRACTOR the lesser of: the original cost of
hole included in the remuneration table (Section no. 3 of
the equipment depreciated at the rate of
Commercial Proposal) the lesser of: the original cost of the
twenty per cent (20%) per year using the
equipment depreciated at the rate of twenty percent (20%) per
straight line method calculated from the date
year using the straight line method calculated from the date of
of first use of such equipment, whether under
first use of such equipment, whether under this CONTRACT or
this CONTRACT or anywhere else before or
anywhere else before or from the date that the equipment was
from the date that the equipment was rebuilt
rebuilt to an as-new condition, as documented in the
to an as-new condition, as documented in the
CONTRACTOR’s maintenance records (whichever is later); from
CONTRACTOR’s maintenance records
the date of commencement of contract or last refurbishment date
(whichever is later); provided that, for the
whichever is later; provided that, for the avoidance of doubt, no
avoidance of doubt, no depreciation shall be
depreciation shall be computed on the CONTRACTOR
computed on the CONTRACTOR consumables
consumables and explosives and provided further, that the
and explosives and provided further, that the
resulting depreciation shall not exceed a maximum of sixty fifty
resulting depreciation shall not exceed a
per cent (60%) (50%) of the original cost of the equipment;
maximum of sixty per cent (60%) of the
damaged beyond repair / lost in hole prices included in the
original cost of the equipment;
remuneration table.
any associated rental charges shall terminate when the
any associated rental charges shall terminate
equipment is no longer able to perform its required function.
when the equipment is no longer able to
perform its required function.
CONTRACTOR shall provide an irrevocable
12.1 Contractor requests removal of Article 12 (Bank Guarantee) in Not quantifiable
bank guarantee,for 10% of the estimated
its entirety and offers a parent company guarantee to secure its
Annual CONTRACT PRICE payable on first
performance hereunder. Alternatively, Contractor requests the
demand of COMPANY,
following modification to article 12.1:
Reference Relevant Text of the Article Tenderer’s Proposed Change Marked up from Original Language Has Tenderer specified
Page & Price
Article Implication for
Withdrawal of
Qualification
CONTRACTOR shall provide an irrevocable bank guarantee, for
10 5% of the estimated annual CONTRACT PRICE payable on
first demand of COMPANY
The amount payable, as liquidated damages, The amount payable, as liquidated damages, for delays identified
13.2 Not quantifiable
for delays identified in Article 13.1 shall be: in Article 13.1 shall be:
(a) QAR 73,000 (Qatari Riyals Seventy-Three (a) QAR 73,000 (Qatari Riyals Seventy Three Thousand only) ( QAR
Thousand only) per day of delay, prorated on a 2000 (Qatari Riyal Two Thousand only) per day of delay, prorated
twenty four (24) hour/day basis. on a twenty four (24) hour/day basis.
(b) limited to a cumulative amount of 10% of (b) limited to a cumulative amount of 10% of the Annual
the CONTRACT PRICE. CONTRACT PRICE. The amount of liquidated damage for delays
shall be the sole remedy applicable and no other liabilities shall
apply for this clause.
CONTRACTOR, pursuant to its warranty of CONTRACTOR, pursuant to its warranty of good title set forth in
19.1 Not quantifiable
good title set forth in Article 6, shall obtain Article 6, shall obtain releases of all liens, claims and
releases of all liens, claims and encumbrances, encumbrances, in form and substance acceptable to COMPANY.
in form and substance acceptable to COMPANY may withhold final payment hereunder until
COMPANY. COMPANY may withhold final CONTRACTOR provides such releases to COMPANY. Nothing
payment hereunder until CONTRACTOR herein shall be interpreted as prohibiting CONTRACTOR from filing
provides such releases to COMPANY. a lien on COMPANY when COMPANY is in breach of its payment
obligations hereunder.
The laws of the State of Qatar shall apply to The laws of the State of Qatar England shall apply to this
33 Not quantifiable
this CONTRACT and to the rights and CONTRACT and to the rights and obligations of the PARTIES.
obligations of the PARTIES.
The PARTIES shall endeavor by consultation The PARTIES shall endeavour by consultation and negotiation
and negotiation amicably to resolve in good amicably to resolve in good faith any dispute arising out of or in
faith any dispute arising out of or in connection with the validity, performance, interpretation or
connection with the validity, performance, termination of this CONTRACT, any and all consequences thereof.
interpretation or termination of this Each such dispute shall be duly notified by the claiming PARTY to
CONTRACT, any and all consequences thereof. the other PARTY.
Reference Relevant Text of the Article Tenderer’s Proposed Change Marked up from Original Language Has Tenderer specified
Page & Price
Article Implication for
Withdrawal of
Qualification
Each such dispute shall be duly notified by the
Lacking amicable resolution, the PARTIES shall submit to final and
claiming PARTY to the other PARTY.
binding arbitration before three arbitrators pursuant to the rules
Lacking amicable resolution, the PARTIES shall of the London Court of International Arbitration International
submit to final and binding arbitration before Chamber of Commerce. The seat of arbitration shall be in Doha,
three arbitrators pursuant to the rules of the State of Qatar London, England and the language of arbitration
International Chamber of Commerce. The seat shall be English
of arbitration shall be in Doha, State of Qatar
and the language of arbitration shall be English

11.10 (c ) (c) General Third-Party Liability Insurance (c) General Third-Party Liability Insurance (applicable): covering Not quantifiable
(applicable): covering legal liability including legal liability including contractual liability for loss of or damage to
contractual liability for loss of or damage to any property or injury to any person (other than any person in the
any property or injury to any person (other employment of the CONTRACTOR or any of its subcontractors) or
than any person in the employment of the for loss or damage to any property which may arise out of or in
CONTRACTOR or any of its subcontractors) or any way connected with the execution of or performance of
for loss or damage to any property which may WORK or services under this CONTRACT. Such insurance shall
arise out of or in any way connected with the include cover against legal defence costs and shall have a limit of
execution of or performance of WORK or liability of not less than US$10,000,000 (Ten Million U.S. Dollars)
services under this CONTRACT. Such insurance US$ 5,000,000 (Five Million Dollars) in respect of one occurrence
shall include cover against legal defense costs or event or accident or a series of occurrences or accidents arising
and shall have a limit of liability of not less out of one event and unlimited in any one period of insurance.
than This insurance shall be invoked to the benefit of COMPANY up to
US$10,000,000 (Ten Million U.S. Dollars)in the above limit.
respect of one occurrence or event or accident
or a series of occurrences or accidents arising
out of one event and
unlimited in any one period of insurance. This
insurance shall be invoked to the benefit of
COMPANY up to the above limit.
Reference Relevant Text of the Article Tenderer’s Proposed Change Marked up from Original Language Has Tenderer specified
Page & Price
Article Implication for
Withdrawal of
Qualification
22.1 CONTRACTOR and its subcontractors shall keep accurate accounts and
CONTRACTOR and its subcontractors shall keep Not quantifiable
time records showing all costs and charges incurred in accordance with
accurate accounts and time records showing all
generally accepted accounting principles and procedures. COMPANY or
costs and charges incurred in accordance with
its authorized representatives or agents shall have the right to examine,
generally accepted accounting principles and
during customary business hours, all books, records, accounts,
procedures. COMPANY or its authorized
correspondence, instructions, specifications, plans, drawings, receipts
representatives or agents shall have the right to
and memoranda of CONTRACTOR and its subcontractors in so far as they
examine, during customary business hours, all
are pertinent to such costs, except the makeup of fixed rates and
books, records, accounts, correspondence,
profitability statements. CONTRACTOR shall be responsible for ensuring
instructions, specifications, plans, drawings,
that all of CONTRACTOR’s and its subcontractors’ documentation for
receipts and memoranda of CONTRACTOR and its
costs is preserved and made available at any time for audit, without any
subcontractors insofar as they are pertinent to such
additional compensation therefor, for four (4) years from the date of the
costs. CONTRACTOR shall be responsible for
SERVICE ACCEPTANCE CERTIFICATE or from the date of termination of
ensuring that all of CONTRACTOR’s and its
this CONTRACT, whichever occurs first.
subcontractors’ documentation for costs is
preserved and made available at any time for audit,
without any additional compensation therefor, for
four (4)years from the date of the SERVICE
ACCEPTANCE CERTIFICATE or from the date of
termination of this CONTRACT, whichever occurs
first.

New Clause Abnormal wear & tear charges shall apply for tools. For clarity Not quantifiable
10.3.e. sake, Abnormal wear & tear is defined as Abnormal damage
(meaning damage which could not reasonably be expected in
accordance with scope of work) which has resulted directly from
corrosion, erosion or abrasion caused by the nature of the well
effluent, which term shall include but not limited to drilling fluids.
Abnormal wear & tear charges shall be charged at latest price
book cost + 15 %.
.

5 PRICE BOOK

5 PRICE BOOK
Page 77 All Rights Reserved
Confidential and Proprietary
Reproduction by Permission
Wellbore Integrity Solutions

Fishing and Remedial


&
Well Intervention

MENA Price Book-2020


Regular Price List

IIMPACT TOOLS

1.1.0 JAR INTENSIFIER/ ACCELERATOR


1.2.0 HYDRAULIC FISHING JAR
1.3.0 FISHING BUMPER SUB
1.4.0 SURFACE JAR
1.5.0 HYDRA JAR DRILLING JAR
1.6.0 SHOCK SUB

MILLING TOOLS

2.1.0 ECONOMILLS/ CEMENT MILLS


2.2.0 JUNK MILLS
2.3.0 CONEBUSTER/ SUPER JUNK MILLS
2.4.0 BARRACUDA TYPE JUNK MILLS/ PILOT MILLS/ WINDOW MILLS
2.5.0 PILOT MILLS - Casing Dressing Mills.
2.6.0 BARRACUDA MILLS (Casing - Speed Mills)
2.7.0 TAPER MILLS - Long Type & Short (Low Torque) Type.
2.8.0 STRING MILLS/ WATERMELON MILLS
2.9.0 SKIRTED MILL (DEMOUNTABLE)
2.10.0 MILL SHOE/ HOLLOW MILL: Dressed with Tungsten Carbide.
2.11.0 PACKER MILLING TOOLS
2.12.0 PACKER MILLING TOOLS (SPECIAL DRESSING FOR INCONEL AND HIGH CHROME ALLOYS)
2.13.0 SEAL BORE EXTENSION SUBS
2.14.0 SLICK BORE CATCH ASSEMBLY
2.15.0 CATCH ASSEMBLIES (SINGLE OR DUAL)
2.16.0 BRIDGE PLUG MILLING TOOL
2.17.0 INTERNALLY DRESSED GUIDE POST MILL
2.18.0 WASHOVER SHOES: - Dressed with Tungsten Carbide. All Sizes are charged to largest dressed OD
2.19.0 JUNK BASKET SHOES: - Dressed with Tungsten Carbide. All Sizes are charged to largest dressed OD
2.20.0 KEY SEAT WIPER
2.21.0 STABILIZER - INTEGRAL BLADE (SOFT FACED)
2.22.0 STABILIZER - INTEGRAL BLADE (HARD FACED)

Fishing and Remedial Page 1 2020


INTERNAL EXTERNAL CATCH TOOLS

3.1.0 OVERSHOT RH: BOWEN SERIES 150


3.2.0 INDIVIDUAL PARTS FOR OVERSHOT RH: BOWEN SERIES 150
3.3.0 SHORT CATCH OVERSHOT RH: BOWEN SERIES 70
3.4.0 EXTRA GRAPPLE SETS FOR OVERSHOT RH: BOWEN SERIES 150 & 70
3.4.0 EXTENSION SUBS UPTO 48" LONG
3.5.0 OVERSIZE GUIDES
3.6.0 WALL HOOK GUIDES
3.7.0 SPEAR RH: To catch the following tubing, casing sizes.
3.8.0 SPEAR STOP RING SUBS AND STOP RINGS - For the following casing sizes.
3.9.0 SPEAR PACK OFF TOOLS - For the following casing sizes.
3.10.0 2M STANDARD SPEAR RH: To catch the following casing sizes.
3.11.0 2M ROTATING SPEAR RH: To catch the following casing sizes.
3.12.0 2M SPEAR GRAPPLES: To catch the following casing sizes.
3.13.0 HOLLOW PIN/ TAPER TAP FOR CASING/ WASHOVER PIPE
3.14.0 DIE COLLAR (RH)
3.14.0 TAPER TAP (RH)

GENERAL TOOLS

4.1.0 CIRCULATING SUBS (BURST DISC TYPE)


4.2.0 CIRCULATING SUBS (DROP BALL TYPE)
4.3.0 WASHOVER PIPE (Range 1, 2 and 3)
4.4.0 WASHOVER PIPE TOP SUBS - DRIVE SUBS
4.5.0 WASHOVER PIPE SAFETY TOP SUBS - DRIVE SUBS: Back off Type - Full Opening Type
4.6.0 LIFT PLUGS (Bail Type)
4.7.0 ELEVATOR (Side Door)
4.8.0 ELEVATOR (Single Joint)
4.9.0 CASING/ WASHOVER PIPE SLIPS
4.10.0 CASING/ WASHOVER SAFETY CLAMPS
4.11.0 DEBRIS SUBS
4.12.0 EXTERNAL PIPE CUTTER
4.13.0 BLEED OFF SUB/ ANCHOR SUB
4.14.0 SAFETY JOINT - Baash Ross/ Bowen Types
4.15.0 SAFETY JOINT - J-Slot Type
4.16.0 ROPE SPEAR (Single or Double)
4.17.0 HYDRAULIC ACTUATED KNUCKLE JOINT
4.18.0 CASING STRIPPING PLATES
4.19.0 SPIDER
4.20.0 API ROTARY SUBS

Fishing and Remedial Page 2 2020


4.21.0 JUNK SUB - BOOT BASKET SUB
4.22.0 BLOW OUT SUB (Burst Disk Type) - For use with Hydraulic Junk Retrieval Tool
4.23.0 FISHING MAGNET (With Standard Guide)
4.24.0 DITCH MAGNET
4.25.0 NON-ROTATING STABILIZER
4.26.0 BULLNOSE SUBS/RESTRICTOR SUBS
4.27.0 OFFSHORE BASKETS
4.28.0 CASING SWEDGES
4.29.0 CASING ROLLERS
4.30.0 CASING SCRAPERS
4.31.0 CASING PATCHES
4.32.0 IMPRESSION BLOCKS
4.33.0 STANDARD MARINE SWIVEL
4.33.0 ADAPTOR/ LANDING PLATE FOR MARINE SWIVEL
4.34.0 CENTRALIZER (NON-ROTATING STEEL BLADES)
4.35.0 3 3/8" OD DRILLPIPE/ 3 3/8" OD DRILL COLLAR PLUS ANCILLARY EQUIPMENT
4.36.0 2 7/8" OD DRILL PIPE/ 3 1/8" DRILL COLLARS PLUS ANCILLARY EQUIPMENT
4.37.0 ANCILLARY EQUIPMENT
4.38.0 3 1/2" OD DRILL PIPE/ 4 1/8" DRILL COLLARS
4.39.0 ANCILLARY EQUIPMENT

WHIPSTOCK TOOLS
5.1.0 ECONOSTOCK (BOTTOM TRIP WHIPSTOCK) - TrackMaster
Whipstock System Single Trip
5.2.0 RETRIEVABLE PACKSTOCK/ANCHOR - TrackMaster
Whipstock System Single Trip
5.3.0 PERMANENT PACKSTOCK/ANCHOR - TrackMaster
Whipstock System Single Trip
5.4.0 Special applications whips, shallow exit and low dog leg
severity whips P.O.A.
5.5.0 PDC Milling Systems P.O.A.
5.6.0 TRACKMASTER MILL

SBE TOOLS
6.1.0 ROLLER REAMER, BORROX
6.2.0 UNDERREAMER
6.3.0 HOLE OPENER - FIXED CONES GTA-SDD TYPE
6.4.0 HOLE OPENER - FIXED CONES, GRANT TYPE
6.5.0 HOLE OPENER - FIXED CONES, SECURITY TYPE

Fishing and Remedial Page 3 2020


HYDRAULIC TOOLS
7.1.0 MULTI CYCLE BY-PASS VALVES
7.2.0 SECTION MILL
7.3.0 INTERNAL HYDRAULIC PIPE CUTTER
7.4.0 JUNK BASKET - Reverse Circulation Type
7.5.0 HYDRAULIC JUNK RETRIEVAL TOOL.
7.5.0a HYDRAULIC JUNK RETRIEVAL TOOL CATCHER FINGERS
7.6.0 HYDRAULIC CASING BACK-OFF TOOL

ABANDONMENT PACKAGES
8.1.0 JACK UPS
8.2.0 FLOATING RIGS, CONVENTIONAL MARINE SWIVEL/ EXPLOSIVE
8.3.0 FLOATING RIGS, 2M SINGLE TRIP SYSTEM/ EXPLOSIVE
8.4.0 FLOATING RIGS, 2M SINGLE TRIP SYSTEM
8.5.0 FLOATING RIGS, 2M SINGLE TRIP SYSTEM/MOTOR/EXPLOSIVE

ROLLER REAMERS
9.1.0 ROLLER REAMERS - GRANT MODEL 2020 - 3 POINT
9.2.0 ROLLER REAMERS - GRANT MODEL 2020 - 6 POINT
9.3.0 BORROX A.P. SEALED BEARING ROLLER REAMER (3 Point String or Near
Bit)
9.4.0 SEALED BEARING CUTTER ASSEMBLIES (Per Set of 3)

LEFT HAND TOOLS


10.1.0 HEAVY WEIGHT DRILL PIPE - LEFT HAND
10.2.0 DRILL COLLAR - LEFT HAND
10.3.0 KELLY - LEFT HAND PLUS ANCILLARY EQUIPMENT
10.4.0 REVERSING TOOLS - Right Hand Torque in - Left Hand Torque out
10.5.0 JAR - LEFT HAND
10.6.0 FISHING BUMPER SUB - LEFT HAND
10.7.0 JAR INTENSIFIER (ACCELERATOR) - LEFT HAND
10.8.0 OVERSHOT - LEFT HAND
10.9.0 SAFETY JOINT - LEFT HAND
10.10.0 DIE COLLAR - LEFT HAND
10.11.0 SPEAR - LEFT HAND
10.12.0 TAPER TAP - LEFT HAND
10.13.0 CROSSOVER SUB - LEFT HAND

TT TOOLS
11.1.0 Coil Connectors - Internal Dimple/External Dimple
11.2.0 Coil Connectors - Internal Crimp/Roll On
11.3.0 Dual Flapper Check Valves
11.4.0 Disconnects - Basic Hydraulic/Mechanical, Re-sellable
11.5.0 Heavy Duty Hydraulic Disconnects

Fishing and Remedial Page 4 2020


11.6.0 Flow Activated Disconnects
11.7.0 Flow Activated Disconnects with Time Delay
11.8.0 Dual Circulating Valve
11.9.0 Drop Ball Circulating Valve
11.10.0 Motor Head Assemblies
11.11.0 Crossovers - Rotary, Pump-in-Sub
11.12.0 Crossovers - Premium Connections
11.13.0 Weight/Extension Bar
11.14.0 Weight Bar - Tungsten Filled
11.15.0 Adjustable Back Pressure Valve
11.16.0 Annular Circulating Valve - Ball Activated
11.17.0 Multi-Function Circulating Valve
11.18.0 Multi-Function Circulating Valve - Flow Activated
11.19.0 Choke Subs
11.20.0 Ported/Drain Subs
11.21.0 Spiral Jetting Bars - Drilled
11.22.0 Spiral Jetting Bars - Insert Nozzles
11.23.0 Jetting/Displacement Nozzles - Drilled
11.24.0 Jetting/Displacement Nozzles - Insert Nozzles
11.25.0 Combination Nozzle - Jetting/Reverse Circulation
11.26.0 Rotary Jetting Tools
11.27.0 Tubing End/Nipple Locator - Mechanical
11.28.0 Tubing End/Nipple Locator - Hydro-Mechanical
11.29.0 Knuckle Joint - Full Rotation Sealed
11.30.0 Knuckle Joints - Torque Thru Sealed
11.31.0 Knuckle Joints - Double Torque Thru Sealed
11.32.0 Knuckle Joints - Hydraulic Kickover
11.33.0 Indexing Tool - Hydraulic
11.34.0 Stabilisers - Fluted/Bladed
11.35.0 Stabilisers - Sleeve/Non-Rotating
11.36.0 Bow Spring Centralisers - Mechanical
11.37.0 Bow Spring Centralisers - Hydraulic
11.38.0 Oil Jars - Fishing (Up Only)
11.39.0 Gas Accelerators - Fishing (Up Only)
11.40.0 Oil Jars - Dual Acting
11.41.0 Accelerators - Dual Acting
11.42.0 Mechanical Jars - Dual Acting
11.43.0 Impact Tool - Single Acting Impact Hammers
11.44.0 Impact Tool - Single Acting Impact Hammer Accelerator
11.45.0 Impact Tool - Dual Acting Impact Hammers
11.46.0 Impact Tool - Dual Acting Impact Hammer Accelerator
11.47.0 Bumper Subs - Fishing
11.48.0 Bumper Subs - Lubricated

Fishing and Remedial Page 5 2020


11.49.0 Down Hole Motors - Standard Workover
11.50.0 Down Hole Motors - High Performance
11.51.0 Down Hole Motors - High Temperature
11.52.0 Down Hole Motors - Slow Speed
11.53.0 Down Hole Motors - Whipstock Applications
11.54.0 Underreamer - Crushed Carbide Dressed Blades
11.55.0 Underreamer - Insert Dressed Blades
11.56.0 Underreamer - Diamond Dressed Blades
11.57.0 Underreamer - As High Expansion Anchor
11.58.0 Underreamer As High Expansion Centralizer
11.59.0 Tungsten Carbide - Flat, Concave, Round Nose, Junk Mills
11.60.0 Tungsten Carbide - Blade, Tapered, Pilot, Water Melon,
Skirted, Junk Mills
11.61.0 Insert Dressed - Stage Mills
11.62.0 Insert Dressed - “T” Series
11.63.0 “Diamond Enhanced Carbide” Dressed - Stage Mills
11.64.0 “Diamond Enhanced Carbide” Dressed - “T” Series
11.65.0 Diamond Dressed - Parabolic, Speed, Concave, Round Nose,
Junk Mills
11.66.0 Shoes - Tungsten Carbide Dressed, Hollow Mill
11.67.0 Shoes - Insert Dressed
11.68.0 Shoes - “Diamond Enhanced Carbide” Dressed
11.69.0 Shoes - Diamond Dressed
11.70.0 Dressed Guides
11.71.0 Washpipe
11.72.0 Shoes - Venturi Jet Junk Basket
11.73.0 Hydraulic Cutter
11.74.0 Hydraulic Anchor Sub
11.75.0 Underreamer - As High Expansion Anchor
11.76.0 Underreamer - As High Expansion Centralizer
11.77.0 Bleed-Off Sub
11.78.0 Swivel Subs
11.79.0 Cut Compensator
11.80.0 Accessories - No Go, Bullnose, Profile Subs
11.81.0 Junk/Boot Basket
11.82.0 Venturi Jet Junk Basket
11.83.0 Venturi Jet Junk Basket - Extension
11.84.0 Venturi Jet Junk Basket - Carbide Dressed Shoes
11.85.0 Big Bore Finger Catcher Subs
11.86.0 Venturi Jet Junk Basket Big Bore Pulling Tools -
Internal/External Type
11.87.0 Hydrostatic/Turbo Bailers
11.88.0 Magnetic Chip Catcher Subs

Fishing and Remedial Page 6 2020


11.89.0 Overshots - Bowen Series (Inclusive of One Grapple Set)
11.90.0 Overshots - Kelo, Mouse Trap, Dog Type, Socket, C-Type
(Inclusive of One Grapple Set)
11.91.0 Overshots - Continuous (Inclusive of One Grapple Set)
11.92.0 Overshots - High Pressure Packoff
11.93.0 Overshot Guides - Hook Wall, Special
11.94.0 Dressed Guides
11.95.0 Overshots - Hydraulic Release Pulling Tool for External Fish
neck (Inc. of One Grapple Set)
11.96.0 Overshots - Hydraulic Release for Slick OD (Inclusive of One
Grapple Set)
11.97.0 Overshots - Coiled Tubing Cutting (Inclusive of One Grapple
Set)
11.98.0 Overshots - Box Tap
11.99.0 Spears - Bowen ITCO (Inclusive of One Grapple Set)
11.100.0 Spears - Mechanical Release - GS Style (Inclusive of One
Grapple Set)
11.101.0 Spears - Hydraulic Release Slick Catch (Inclusive of One
Grapple Set)
11.102.0 Spears - Hydraulic Release GS Style (Inclusive of One Grapple
Set)
11.103.0 Spears - Hydraulic Release Disconnect Retrieval Tool
(Inclusive of One Grapple Set)
11.104.0 Taps - Taper
11.105.0 Spears - Wireline - Internal, External, Multi-Prong,Corkscrew
11.106.0 Hydraulic Pushing/Pulling Tool
11.107.0 Hydraulic Shifting Tools
11.108.0 Dual Hydraulic Shifting Tools
11.109.0 Lift Subs - Lift/Pressure Test
11.110.0 Safety Clamps
1.111.0 Test Subs - Pull/Pressure Test
1.112.0 Landing Plates
11.113.0 Tong Units

RATES DEFINITIONS
Operating Day = Rate per day while tool is below rotary table
Run Charge = Singular rate charged when tool is used. Additional run charges apply
after each re-run
or in the case of milling tools only after redress
Operation Rate = Singular rate charged per defined operation. e.g. per Whipstock set or
per

Fishing and Remedial Page 7 2020


1.1.0 JAR INTENSIFIER/ ACCELERATOR
Item Size Operating Standby Redress Service Sale of Packing LIH/DBR
Day Rate Day Rate Charge* Set**
1.1.2 Connection up to 2 7 8" US$ 502 US$ 122 US$ 622 US$ 781 US$ <30.207
1.1.3 Connection up to 3 1/2" US$ 548 US$ 140 US$ 622 US$ 1,008 US$ 80,988
1.1.4 Connection up to 4 1/2" US$ 630 US$ 156 US$ 622 US$ 1,112 US$ 133.698
1.1.5 Connection up to 6 5/8" US$ 868 US$ 226 US$ 622 US$ 1,975 US$ 228,168
wellhead abandoned.
Standby rate = Rate charged on rental period days where none of the above charges are
applicable.
In the case of Operation rates and run charges, these singular rates constitute a one day
deduction from the standby rental period.

IMPACT TOOLS

1.2.0 HYDRAULIC FISHING JAR


Item Size Operating Standby Redress Service Sale of LIH/DBR
Day Rate Day Rate Charge* Packing
Set**
1.2.2 Connection up to 2 7/8" US$ 472 US$ 122 US$ 622 US$ 668 US$ 70,512

1.2.3 Connection up to 3 1/2" US$ 536 US$ 140 US$ 622 US$ 746 US$ 103,197

1.2.4 Connection up to 4 1/2" US$ 616 US$ 156 US$ 622 US$ 904 US$ 133,728

1.2.5 Connection up to 6 5/8" US$ 816 US$ 212 US$ 622 US$ 934 US$ 181,512

1.3.0 FISHING BUMPER SUB


Item Size Operating Standby Redress Service Sale of LIH/DBR
Day Rate Day Rate Charge* Packing Set**
1.3.2 Connection up to 2 7/8" US$ 152 US$ 46 US$ 391 US$ 178 US$ 18,813
1.3.3 Connection up to 3 1/2" US$ 166 US$ 52 US$ 391 US$ 224 US$ 25,602
1.3.1 Connection up to 4 1/2" US$ 228 US$ 66 US$ 391 US$ 316 US$ 12,717
1.3.5 Connection up to 6 5/8" US$ 318 US$ 92 US$ 391 US$ 662 US$ 51,309

Fishing and Remedial Page 8 2020


1.4.0 SURFACE JAR
Size Operating Day Rate Standby Day Rate Redress Service LIH/DBR
Charge*
1.4.0 All Sizes US$ US$ 228 US$ US$ 127,368
892 622

* Redress Service Charge - only applies to used tools.


** Sale of Packing Sets - only applies to used tools. High temperature Packing sets: Price upon request

IIMPACT TOOLS
Mills dressed with special WIS Tungsten Carbide

2.1.0 ECONOMILLS/ CEMENT MILLS


Item Size Standby Day Rate Run Charge* LIH/DBR
2.1.1 Up to 4 1/8" OD US$ 12 US$ 870 US$ 11,790

2.1.2 Up to 5 3/8" OD US$ 12 US$ 994 US$ 12,552

2.1.3 Up to 6 3/8" OD US$ 18 US$ 1,168 US$ 13,368

2.1.4 Up to 7 3/8" OD US$ 20 US$ 1,346 US$ 16,620

2.1.5 Up to 8 7/8" OD US$ 24 US$ 1,620 US$ 16,914

2.1.6 Up to 11" OD US$ 40 US$ 3,358 US$ 35,370

2.1.7 Up to 12 1/4" OD US$ 50 US$ 3,736 US$ 36,990

2.2.0 JUNK MILLS


Item Size Standby Day Rate Run Charge* LIH/DBR
2.2.1 Up to 5 7/8" OD US$ 24 US$ 1,638 US$ 13,242

2.2.2 Up to 6" OD US$ 28 US$ 1,910 US$ 13,242


2.2.3 Up to 8 1/2" OD US$ 36 US$ 2,802 US$ 24,642

2.2.4 Up to 12 1/4" OD US$ 70 US$ 5,064 US$ 41,244


2.2.5 Up to 15" OD US$ 76 US$ 5,842 US$ 49,482
2.2.6 Up to 17 1/2" OD US$ 120 US$ 8,412 US$ 56,352
2.2.7 Up to 26" OD US$ 194 US$ 14,174 US$ 98,964

Fishing and Remedial Page 9 2020


2.3.0 CONEBUSTER/ SUPER JUNK MILLS
Item Size Standby Day Run Charge* LIH/DBR
Rate
2.3.1 Up to 5 7/8" OD US$ 28 US$ 1,964 US$ 18,000
2.3.2 Up to 6" OD US$ 32 US$ 2,288 US$ 18,000
2.3.3 Up to 8 1/2" OD US$ 46 US$ 3,362 US$ 30,468
2.3.4 Up to 12 1/4" OD US$ 86 US$ 6,074 US$ 46,452
2.3.5 Up to 15" OD US$ 92 US$ 7,010 US$ 70,566
2.3.6 Up to 17 1/2" OD US$ 140 US$ 10,092 US$ 70,566
2.3.7 Up to 26" OD US$ 230 US$ 17,010 US$ 127,500

1) * Operational (Run) Charge - only applies to used


tools.
2) Mills lost in hole or damaged beyond repair will be charged
rental to date of loss or damage plus LIH/DBR.

2.4.0 Barracuda Type Junk Mills/ Pilot Mills / Window Mills


Item Size Standby Day Run Charge* LIH/DBR
Rate
2.4.1 Up to 5 7/8" OD US$ 32 US$ 2,288 US$ 17,892
2.4.2 Up to 6" OD US$ 34 US$ 2,670 US$ 21,150
2.4.3 Up to 8 1/2" OD US$ 56 US$ 3,924 US$ 36,606
2.4.4 Up to 12 1/4" OD US$ 98 US$ 7,088 US$ 49,506
2.4.5 Up to 15" OD US$ 108 US$ 8,178 US$ 98,796
2.4.6 Up to 17 1/2" OD US$ 166 US$ 11,776 US$ 102,402

2.5.0 PILOT MILLS - Casing Dressing Mills.

Item Size Standby Day Rate Run Charge* LIH/DBR


2.5.1 Up to 5 3/4" OD US$ 32 US$ 2,688 US$ 17,874

2.5.2 Up to 6" OD US$ 36 US$ 2,864 US$ 19,242

2.5.3 Up to 8 1/2" OD US$ 52 US$ 3,892 US$ 26,880

Fishing and Remedial Page 10 2020


2.5.4 Up to 12 1/4" OD US$ 64 US$ 4,772 US$ 35,400

2.5.5 Up to 15" OD US$ 90 US$ 6,772 US$ 47,226

2.5.6 Up to 17 1/2" OD US$ 120 US$ 8,760 US$ 65,016

2.5.7 Up to 20" OD US$ 138 US$ 10,014 US$ 77,244

2.5.8 Up to 30" OD US$ 154 US$ 11,450 US$ 92,682

Mills dressed with special WIS Tungsten Carbide Inserts.


2.6.0 BARRACUDA MILLS (Casing - Speed Mills)

For the following Tubing and Casing sizes Standby Day Run Charge* LIH/DBR
Rate
2.6.1 Up to 4 1/2" OD US$ 56 US$ 6,700 US$ 43,230

2.6.2 Up to 5 1/2" OD US$ 64 US$ 8,416 US$ 43,230

2.6.3 Up to 7 7/8" OD US$ 76 US$ 11,678 US$ 63,036

2.6.4 Up to 10 13/16" OD US$ 120 US$ 15,374 US$ 77,184

2.6.5 Up to 13 3/8" OD US$ 162 US$ 18,058 US$ 91,356

2.6.6 Up to 20" OD US$ 194 US$ 22,326 US$ 183,042

- Barracuda Mills (Casing-Speed Mills) and Window Mills are dressed with special WIS
Tungsten Carbide Inserts.
- RUN CHARGE is charge for one mill run of 400 feet or less.

- Charge per foot milled in excess of 400 feet in one mill run is
0.2% of run charge

1) * Operational (Run) Charge - only applies to used


tools
2) Mills lost in hole or damaged beyond repair will be charged rental to date of loss or damage plus
LIH/DBR
3) Mills made and dressed to specific Customer requirements will be charged at Operational (Run) rate, used or
unused.

All mills dressed with special WIS Tungsten Carbide.

Fishing and Remedial Page 11 2020


2.7.0 TAPER MILLS - Long Type & Short (Low Torque) Type.
Item Size Standby Day Run Charge* LIH/DBR
Rate
2.7.1 Up to 5 3/4" OD US$ 30 US$ 2,336 US$ 22,314
2.7.2 Up to 6" OD US$ 36 US$ 2,728 US$ 22,314
2.7.3 Up to 8 1/2" OD US$ 46 US$ 3,310 US$ 39,726
2.7.4 Up to 12 1/4" OD US$ 74 US$ 5,568 US$ 52,440
2.7.5 Up to 15" OD US$ 92 US$ 6,854 US$ 74,604
2.7.6 Up to 17 1/2" OD US$ 122 US$ 9,108 US$ 74,604
2.7.7 Up to 28" OD US$ 204 US$ 15,266 US$ 134,256

2.8.0 STRING MILLS/ WATERMELON MILLS


Item Size Standby Day Run Charge* LIH/DBR
Rate
2.8.1 Up to 5 3/4" OD US$ 30 US$ 2,336 US$ 26,436
2.8.2 Up to 6" OD US$ 36 US$ 2,728 US$ 31,728
2.8.3 Up to 8 1/2" OD US$ 46 US$ 3,310 US$ 32,910
2.8.4 Up to 12 1/4" OD US$ 74 US$ 5,568 US$ 55,710
2.8.5 Up to 15" OD US$ 92 US$ 6,854 US$ 66,288
2.8.6 Up to 17 1/2" OD US$ 122 US$ 9,108 US$ 74,604
2.8.7 Up to 28" OD US$ 204 US$ 15,266 US$ 134,256

2.9.0 SKIRTED MILL (DEMOUNTABLE) Consisting of Drive Sub, Extension Washover Shoe and Internal Mill.

Item Size Standby Day Run Charge* LIH/DBR


Rate
2.9.1 Up to 6" OD US$ 74 US$ 3,926 US$ 40,194
2.9.2 Up to 8 1/2" OD US$ 120 US$ 6,350 US$ 69,534
2.9.3 Up to 12 1/4" OD US$ 170 US$ 10,884 US$ 107,394

1) * Operational (Run) Charge - only applies to


used tools.
2) *+ Run Charge - includes redress costs of Washover
shoe & internal mill.
3) Mills lost in hole or damaged beyond repair will be charged rental to date of
loss or damage plus LIH/DBR
4) Mills made and dressed to specific Customer requirements will be charged at Operational
(Run) rate, used or unused.

Fishing and Remedial Page 12 2020


2.10.0 MILL SHOE/ HOLLOW MILL: Dressed with Tungsten Carbide.
Item Size Run Standby Day LIH/DBR*
Charge Rate
2.10.1 Up to 4 13/16" OD of Overshot US$ 1,536 US$ 20 US$ 13,194

2.10.2 Up to 6 1/2" OD of Overshot US$ 2,044 US$ 28 US$ 16,020

2.10.3 Up to 8 7/8" OD of Overshot US$ 2,864 US$ 36 US$ 20,142

2.10.4 Up to 10 3/4" OD of Overshot US$ 3,476 US$ 46 US$ 24,744

2.10.5 Up to 11 3/4" OD of Overshot US$ 3,884 US$ 52 US$ 28,872

2.10.6 Up to 13 3/4" OD of Overshot US$ 4,908 US$ 64 US$ 40,002

2.11.0 PACKER MILLING TOOLS For Baker/Otis/Halliburton and Camco type packers
Item Casing ID Operating DAY Standby
Millhead Bottom Mill LIH/DBR Tool
Diameter Day Rate Day Rate
Run Run Charge plus Catcher
Charge only
2.11.1 Up to 4 1/2" US$ 2,022 US$ 182 US$ 2,434 US$ 800 US$ 67,350
Liner
2.11.2 Up to 5 1/2" US$ 2,244 US$ 200 US$ 2,576 US$ 886 US$ 82,068
Liner
2.11.3 Up to 7 5/8" US$ 2,604 US$ 228 US$ 3,004 US$ 976 US$ 99,396
Casing
2.11.4 Up to 9 5/8" US$ 3,924 US$ 316 US$ 4,088 US$ 1,076 US$ 121,422
Casing
2.11.5 Up to 13 3/8" US$ 4,896 US$ 408 US$ 5,012 US$ 1,076 US$ 153,264
Casing
2.12.0 PACKER MILLING TOOLS (SPECIAL DRESSING FOR INCONEL AND HIGH CHROME ALLOYS)
For Baker, Otis/ Halliburton and Camco type packers.
Inside Casing Size Operating Rate Standby Rate [run charge Run Charge [LIH/ DBR Tool
DAY DAY MILLHEAD BOTTOM MILL plus Catcher
only
2.12.1 Up to 4 1/2" US$ 2,428 US$ 218 US$ 4,380 US$ 800 US$ 121,236
Liner
2.12.2 Up to 5 1/2" US$ 2,696 US$ 242 US$ 4,640 US$ 886 US$ 147,732
Liner
2.12.3 Up to 7 5/8" US$ 3,126 US$ 272 US$ 5,408 US 976 US$ 178,908
Casing
2.12.4 Up to 9 5/8" US$ 4,708 US$ 378 US$ 7,356 US$ 1,076 US$ 218,562
Casing
2.12.5 Up to 13 3/8" US$ 5,874 US$ 490 US$ 9,022 US$ 1,076 US$ 275,874
Casing

Fishing and Remedial Page 13 2020


Packer Milling Tool complete assembly components: When ordering Packer Milling
Tools, please specify:
2 x Junk Boot Subs 1 x Bottom Mill 1) Size and weight of casing.
1 x Spacer Sub 1 x Complete Redress Kit 1 x Pilot 1 x Stabilizer 2)Make of packer, model
Millhead 1 x Catch Assembly assembly number and size.
3) If there is a seal bore
extension below packer, state
length.
4)Length, OD and weight of
mill out extension.
5)Packer Material Spec.
(Chrome, Inconel)

2.13.0 SEAL BORE EXTENSION SUBS


Item Size Operating DAY Standby DAY LIH/DBR
Rate Rate
2.13.1 2 3/8" Reg Conn up to 9.50 ft long US$ 122 US$ 18 US$
2.13.2 2 7/8" Reg Conn up to 9.50 ft long US$ 164 US$ 24 US$

2.14.0 SLICK BORE CATCH ASSEMBLY


Item Size Operating Rate Standby Rate LIH/DBR
DAY DAY
2.14.1 Up to 4" ID Catch US$ 5,316 US$ 144 US$
2.14.2 Up to 5" ID Catch US$ 5,562 US$ 178 US$

2.15.0 CATCH ASSEMBLIES (SINGLE OR DUAL)


Item Size Operating DAY Standby DAY LIH/DBR
Rate Rate
2.15.1 2 3/8" Reg Conn US$ 342 US$ 74 US$
2.15.2 2 7/8" Reg Conn US$ 386 US$ 92 US$

Fishing and Remedial Page 14 2020


2.16.0 BRIDGE PLUG MILLING TOOL
For Baker, Johnstone and Halliburton type, bridge plugs and cement retainers.

Inside Casing Size Operating Standby Day Run Charge Shoe LIH/DBR
Day Rate Rate
2.16.1 7- 7 5/8" Casing US$ 3,778 US$ 404 US$ US$ 29,196
2.16.2 9 5/8" Casing US$ 5,152 US$ 550 US$ US$ 49,668
2.16.3 13 3/8" Casing US$ 7,212 US$ 772 US$ US$ 91,038

Bridge Plug and Cement Retainer Milling Tool - complete assembly consists of:

1 x Junk Boot Sub


1 x Complete Redress Kit
When ordering please specify, weight and size of casing and type/ model of Bridge Plug Cement Retainer.

2.17.0 INTERNALLY DRESSED GUIDE POST MILL

For redressing and removing Junk from Subsea Guide Posts

Item Size Operating Day Standby Day Run LIH/DBR


Rate Rate Charge
2.17.1 9 1/2" OD x 5 15/32" ID US$ 1,580 US$ 118 US$ 3,476 P.O.A.

2.18.0 WASHOVER SHOES: - Dressed with Tungsten Carbide. All Sizes are charged to largest dressed OD
Price per Joint
Item Size Standby Rate DAY Run Charge LIH/DBR
2.18.1 Up to 3 15/16" OD US$ 20 US$ 1,228 US$ 12,180
2.18.2 Up to 4 15/16" OD US$ 24 US$ 1,308 US$ 12,180
2.18.3 Up to 5 15/16" OD US$ 28 US$ 1,558 US$ 12,180
2.18.4 Up to 6 15/16" OD US$ 28 US$ 1,638 US$ 16,152
2.18.5 Up to 7 15/16" OD US$ 30 US$ 1,936 US$ 18,108
2.18.6 Up to 8 15/16" OD US$ 40 US$ 2,428 US$ 18,588
2.18.7 Up to 9 15/16" OD US$ 40 US$ 2,562 US$ 21,324
2.18.8 Up to 10 15/16" OD US$ 46 US$ 2,784 US$ 22,620
2.18.9 Up to 11 15/16" OD US$ 52 US$ 3,218 US$ 24,000

Fishing and Remedial Page 15 2020


2.18.10 Up to 12 15/16" OD US$ 64 US$ 3,796 US$ 23,100
2.18.11 Up to 13 15/16" OD US$ 66 US$ 4,090 US$ 28,794
2.18.12 Up to 14 15/16" OD US$ 74 US$ 4,674 US$ '0.5 10
2.18.13 Up to 15 15/16" OD US$ 92 US$ 5,608 US$ 32,166
2.18.14 Up to 16 15/16" OD US$ 94 US$ 5,960 US$ 48,072
2.18.15 Up to 17 15/16" OD US$ 140 US$ 6,814 US$ 48,972
2.18.16 Up to 18 15/16" OD US$ 156 US$ 8,116 US$ 49,776
2.18.17 Up to 19 15/16" OD US$ 190 US$ 9,178 US$ 51,570
2.18.18 Up to 24 1/4" OD US$ 212 US$ 10,360 US$ 58,806
2.18.19 Up to 26 15/16" OD US$ 244 US$ 15,058 US$ 66,042

2.19.0 JUNK BASKET SHOES: - Dressed with Tungsten Carbide. All Sizes are
charged to largest dressed OD

2.19.1 Prices are the same as the corresponding Washover Shoe. Refer
Section 6.5
2.19.2 Shoes lost in Hole or damaged beyond repair will be charged rental to date
of loss or damage plus LIH/DBR
Refer Section 6.5
2.19.3 Washover shoes made and dressed to Customer requirements will be charged at
Operational (RUN CHARGE) rate, used or
unused.

2.20.0 KEY SEAT WIPER


Item Body OD : Sleeve OD Operating Day Standby Day Run LIH/DBR
Rate Rate Charge
2.20.1 Up to 6 1/2" : Up to 8 1/2" US$ 52 US$ 52 US$ 3,542 US$
OD 87,372
2.20.2 Up to 8" : Up to 12 1/4" OD US$ 66 US$ 66 US$ 4,634 US$
127,452

2.21.0 STABILIZER - INTEGRAL BLADE (SOFT FACED) To be run inside casing during milling or
Washover operations
Item Connection Size Operating Day Rate Standby Day Rate LIH/DBR
2.21.1 Up to 3 1/2" US$ 162 US$ 56 US$ 19,806
2.21.2 Up to 4 1/2" US$ 234 US$ 74 US$ 23,220
2.21.3 Up to 6 5/8" US$ 356 US$ 82 US$ 31,284
2.21.4 Up to 7 5/8" US$ 370 US$ 94 US$ 51,150

Fishing and Remedial Page 16 2020


2.22.0 STABILIZER INTEGRAL BLADE (HARD FACED)
Dressed with Technodur
Item Connection Size Operating Day Rate Standby Day Rate LIH/DBR
2.22.1 Up to 3 1/2" US$ 496 US$ 82 US$ 23,670
2.22.2 Up to 4 1/2" US$ 658 US$ 104 US$ 27,822
2.22.3 Up to 6 5/8" US$ 948 US$ 112 US$ 37,806
2.22.4 Up to 7 5/8" US$ 968 US$ 136 US$ 57,666

IINTERNAL EXTERNAL CATCH TOOLS

3.1.0 OVERSHOT RH: BOWEN SERIES 150


Item Size Operating DAY Standby DAY TOOL* LIH/DBR
Rate Rate
3.1.1 Up to 4 13/16" OD US$ 272 US$ 46 US$ 10,509
3.1.2 Up to 5 3/4" OD US$ 372 US$ 58 US$ 13,827
3.1.3 Up to 7 7/8" OD US$ 472 US$ 74 US$ 18,693
3.1.4 Up to 8 7/8" OD US$ 488 US$ 76 US$ 22,194
3.1.5 Up to 9 5/8" OD US$ 516 US$ 82 US$ 24,825
3.1.6 Up to 10 3/4" OD US$ 602 US$ 118 US$ 28,458
3.1.7 Up to 11 3/4" OD US$ 688 US$ 134 US$ 31.779
3.1.8 Up to 12 3/4" OD US$ 948 US$ 196 US$ 40,434
3.1.9 Up to 13 3/4" OD US$ 1,308 US$ 230 US$ 64,350

Item PART Charge per Part


3.2.1 Bowl Only 50% of Standby Charge for corresponding overshot size.
3.2.2 Top Sub Only 35% of Standby Charge for corresponding overshot size.
3.2.3 Lip Guide Only 15% of Standby Charge for corresponding overshot size.
3.2.4 Slim Hole Add 50% to Operating Charge for corresponding overshot size.
Overshots
3.2.5 Overshot 50% of Standby Charge for corresponding overshot size.
Crossovers

Fishing and Remedial Page 17 2020


3.3.0 SHORT CATCH OVERSHOT RH: BOWEN SERIES 70
Item Size Operating Standby Day Rate LIH/DBR*
Day Rate
3.3.1 Up to 5 3/4" OD US$ 484 US$ 76 US$ 12,831
3.3.2 Up to 8 1/2" OD US$ 632 US$ 104 US$ 20,583
3.3.3 Up to 11 1/4" OD US$ 892 US$ 172 US$ 35,925
Overshots are furnished with one Grapple set.

Overshots are furnished with one Grapple set.

*All grapple sets are sold if used at current National Oilwell price list plus 15%
3.4.0 EXTRA GRAPPLE SETS FOR OVERSHOT RH: BOWEN SERIES 150 & 70
3.4.1 WITH TOOL - Will be charged at 20% of Standby Charge for corresponding overshot size.
3.4.2 GRAPPLE SET ONLY - Will be charged at 50% of Standby Charge for corresponding overshot size.
3.4.3 TUNGSTEN DRESSED MILL CONTROLS - Run charge = 60% of the corresponding mill shoe in table 3.5.0

3.4.0 EXTENSION SUBS UPTO 48” LONG


Item Size Operating Day Standby Day Rate LIH/DBR*
Rate
3.4.1 Up to 5 7/8" OD US$ 164 US$ 28 US$ 6,666
3.4.2 Up to 8 7/8" OD US$ 228 US$ 36 US$ 11,547
3.4.3 Up to 9 7/8" OD US$ 256 US$ 46 US$ 13,851
3.4.4 Up to 10 3/4" OD US$ 348 US$ 52 US$ 19,497
3.4.5 Up to 11 3/4" OD US$ 372 US$ 66 US$ 23,031
3.4.6 Up to 12 3/4" OD US$ 428 US$ 74 US$ 27,090
3.4.7 Up to 13 3/4" OD US$ 532 US$ 112 P.O.A.
3.4.8 * Add 25% for each additional 12" length to LIH/DBR Value

3.5.0 OVERSIZE GUIDES


Item Size Operating Day Rate Standby Day Rate LIH/DBR
3.5.1 Up to 6 1/2" US$ 50 US$ 12 US$ 2,997
OD
3.5.2 Up to 8 1/2" US$ 70 US$ 18 US$ 4,464
OD
3.5.3 Up to 11 1/2" US$ 126 US$ 24 US$ 8,088
OD
3.5.4 Up to 15" OD US$ 216 US$ 32 US$ 14,817
3.5.5 Up to 17 1/2" US$ 288 US$ 46 US$ 21,267
OD
3.5.6 Up to 21" OD US$ 718 US$ 74 US$ 37,719
3.5.7 Over 21" OD US$ 800 US$ 104 US$ 45,312

Fishing and Remedial Page 18 2020


3.6.0 WALL HOOK GUIDES
Item Size Operating Day Rate Standby Day Rate LIH/DBR
3.6.1 Up to 5 3/4" OD US$ 158 US$ 28 US$ 9,237
3.6.2 Up to 8 1/2" OD US$ 294 US$ 40 US$ 15,654
3.6.3 Up to 9 5/8" OD US$ 338 US$ 50 US$ 18,381
3.6.4 Up to 10 3/4" OD US$ 362 US$ 52 US$ 21,882
3.6.5 Up to 11 3/4" OD US$ 426 US$ 66 US$ 27,276
3.6.6 Up to 12 3/4" OD US$ 538 US$ 82 US$ '2.982
3.6.7 Up to 13 3/4" OD US$ 656 US$ 112 US$ 38,748

3.7.0 SPEAR RH: To catch the following tubing, casing sizes.


Item Size Operating Standby Day Rate LIH/DBR*
Day Rate
3.7.1 Up to 2 3/8" US$ 158 US$ 28 US$ 12,183
3.7.2 Up to 2 7/8" US$ 186 US$ 30 US$ 13,611
3.7.3 Up to 3 1/2" US$ 242 US$ 34 US$ 14,688
3.7.4 Up to 4 1/2" US$ 294 US$ 50 US$ 18,693
3.7.5 Up to 5 1/2" US$ 358 US$ 70 US$ 30,036
3.7.6 Up to 8 5/8" US$ 410 US$ 76 US$ 39,405
3.7.7 Up to 9 5/8" Standard US$ 572 US$ 90 US$ 53,952
3.7.8 Up to 9 5/8" Heavy Duty US$ 572 US$ 90 US$ 67,971
3.7.9 Up to 10 3/4" US$ 622 US$ 118 US$ 67,971
3.7.10 Up to 13 3/8" US$ 784 US$ 140 US$ 67,971
3.7.11 Up to 16" US$ 982 US$ 156 US$ 67,971
3.7.12 Up to 20" US$ 1,308 US$ 212 US$ 67,971
3.7.13 Up to 30" US$ 1,806 US$ 332 US$ 13,137
3.7.14 Up to 36" US$ 2,526 US$ 464 US$ 43,437

* ALL GRAPPLES ARE SOLD IF USED AT CURRENT NATIONAL OILWELL PRICE LIST PLUS 15%
3.7.15 Spears with LH Helix are charged at the above prices plus 40%.
3.7.16 Extra grapples with spears are charged at 20% of the corresponding spear charge per day each.
3.7.17 Grapples only without spear will be charged at 50% of the corresponding spear charge per day each.

3.8.0 SPEAR STOP RING SUBS AND STOP RINGS - For the following casing sizes.

Item Size Operating Day Standby MANDREL LIH/DBR


Rate Day Rate
3.8.1 Up to 7 5/8" US$ 64 US$ 24 US$ 8,322
3.8.2 Up to 10 3/4" US$ 86 US$ 28 US$ 16,167
3.8.6 Up to 36" US$ 170 US$ 56 P.O.A.
* Refer to Abandonment of Well, Section 33.3 for individual stop ring sales prices.

Fishing and Remedial Page 19 2020


3.9.0 SPEAR PACK OFF TOOLS - For the following casing sizes.
Item Size Operating Standby Day Rate Tool
Day Rate LIH/DBR*
3.9.1 Up to 5 1/2" US$ 164 US$ 28 US$ 10,167
3.9.2 Up to 7" US$ 198 US$ 32 US$ 10,197
3.9.3 Up to 9 5/8" US$ 248 US$ 40 US$ 15,594
3.9.4 Up to 10 3/4" US$ 276 US$ 46 US$ 20,055
3.9.5 Up to 13 3/8" US$ 402 US$ 58 US$ 30,195
3.9.6 Up to 18 5/8" US$ 572 US$ 74 P.O.A.
3.9.7 Up to 20" US$ 718 US$ 90 P.O.A.
3.9.8 Up to 30" US$ 860 US$ 112 P.O.A.

* Refer to current National Oilwell replacement


price list, plus 10%, for individual pack-off cup
and thimble sales prices.

3.9.9 Extra Cups and Thimbles will be charged


at 20% of the corresponding Spear Pack-Off
standby charge per set, per day.

3.9.10 Cups and thimbles without Pack Off


Tools will be charged at 50% of the
corresponding tool charge per day

3.10.0 2M STANDARD SPEAR RH: To catch the following casing sizes.


Item Size Operating Standby Day Rate Tool
Day Rate LIH/DBR*
3.10.1 Up to 7 5/8" US$ 410 US$ 76 US$ 27,378
3.10.2 Up to 9 5/8" US$ 572 US$ 90 US$ 27,378
3.10.3 Up to 10 3/4" US$ 622 US$ 118 US$ 27,378
3.10.4 Up to 13 3/8" US$ 784 US$ 140 US$ 40,356
3.10.5 Up to 16" US$ 982 US$ 156 US$ 40,356
3.10.6 Up to 20" US$ 1,308 US$ 212 US$ 86,874
3.10.7 Up to 30" US$ 1,806 US$ 332 US$ 86,874
3.10.8 Up to 36" US$ 2,526 US$ 464 US$ 86,874

3.10.9 Extra grapples with spears are charged at 20% of the corresponding spear standby charge per day each.
3.10.10 Spears with LH Connections are charged at the above prices plus 40%.
3.10.11 Grapples only without spear will be charged at 50% of the corresponding spear charge per day

Fishing and Remedial Page 20 2020


3.11.0 2M ROTATING SPEAR RH: To catch the following casing sizes.
Item Size Operating Standby Day Rate Tool
Day Rate LIH/DBR
3.11.1 Up to 9 5/8" US$ 860 US$ 136 US$ 53,850
3.11.2 Up to 10 3/4" US$ 932 US$ 172 US$ 53,850
3.11.3 Up to 13 3/8" US$ 1,180 US$ 212 US$ 60,228
3.11.4 Up to 16" US$ 1,472 US$ 234 US$ 60,228
3.11.5 Up to 20" US$ 1,964 US$ 318 US$ 129,228
3.11.6 Up to 30" US$ 2,708 US$ 500 US$ 129,228
3.11.7 Up to 36" US$ 3,786 US$ 694 US$ 129,228

3.11.8 Extra grapples with spears are charged at 20% of the corresponding spear standby charge per day each.
3.11.9 Spears with LH Connections are charged at the above prices plus 40%.
3.11.10 Grapples only without spear will be charged at 50% of the corresponding spear charge per day

3.12.0 2M SPEAR GRAPPLES: To catch the following casing sizes.


Item Size Grapple Cost LIH/DBR
3.12.1 Series 9 - 9 5/8" (8 7/8" ID 43.50 lb/ft) US$ 21,456
3.12.2 Series 9 - 9 5/8" (47- 53.50 lb/ft) US$ 21,456
3.12.3 Series 9 - 10 3/4"(51.00 lb/ft) US$ 25,758
3.12.4 Series 9 - 10 3/4"(60.70 lb/ft) US$ 25,758
3.12.5 Series 13 - (12.750" ID) US$ 50,356
3.12.6 Series 13 - 13 3/8" (54.50 lb/ft) US$ 50,356
3.12.10 Series 13 - (15.125" ID) US$ 72,658
3.12.11 Series 13 - 16" (94.50 lb/ft) US$ 68,806
3.12.12 Series 13 - 16" (Shrouded Collet) US$ 68,022
3.12.13 Series 13 - (Carrier) US$ 52,272
3.12.14 Series 13 - 18 5/8" Segs. (87.50 lb/ft) US$ 51,688
3.12.15 Series 13 - 20" Sees. (133.50 lb/ft) US$ 51,688
3.12.16 Series 18 - 17 5/8" (Shrouded) US$ 99,108
3.12.17 Series 18 - 18 5/8" (87.50 lb/ft) US$ 88,390
3.12.18 Series 18 - 20" (94.00 lb/ft) US$ 88,390
3.12.19 Series 18 - 20" (133.00 lb/ft) US$ 88,390
3.12.20 Series 18 - (Shrouded Collet) US$ 98,092
3.12.21 Series 18 - (Carrier) US$ 58,878
3.12.22 Series 18 - 21 1/4" ID (Segments) US$ 74,836
3.12.23 Series 18 - 22 3/4" ID (Segments) US$ 74,836
3.12.24 Series 18 - 26 1/4" ID (Segments) US$ 78,022
3.12.25 Series 18 - 27" ID (Segments) US$ 78,022
3.12.26 Series 18 - 28" ID (Segments) US$ 78,022

Fishing and Remedial Page 21 2020


3.13.0 HOLLOW PIN/ TAPER TAP FOR CASING/ WASHOVER PIPE

Item Casing OD Operating Day Standby Day LIH/DBR


Rate Rate
3.13.1 Up to 5 3/4" OD US$ 860 US$ 92 P.O.A.

3.13.2 Up to 7 5/8" OD US$ 1,276 US$ 138 P.O.A.

3.13.3 Up to 10 3/4" OD US$ 1,808 US$ 200 P.O.A.

3.13.4 Up to 11 3/4" OD US$ 2,064 US$ 242 P.O.A.

3.13.5 Up to 13 3/8" OD US$ 2,666 US$ 294 P.O.A.

3.13.6 Up to 16" OD US$ 3,306 US$ 358 P.O.A.

3.14.0 DIE COLLAR (RH)


Item Casing OD Operating Day Rate Standby Day Rate LIH/DBR*
3.14.1 Connection up US$ 292 US$ 32 US$ 6,126
to 2 3/8"
3.14.2 Connection up US$ 362 US$ 34 US$ 7,569
to 2 7/8"
3.14.3 Connection up US$ 584 US$ 36 US$ 11,049
to 3 1/2"
3.14.4 Connection up US$ 720 US$ 46 US$ 15,795
to 4 1/2"
3.14.5 Connection up US$ 1,374 US$ 70 US$ 61,797
to 6 5/8"
*Tools damaged beyond repair will be sold at current LIH/DBR prices plus freight and other ancillary costs.

3.14.0 TAPER TAP (RH)

Item Casing OD Operating Day Rate Standby Day Rate LIH/DBR


3.14.1 Connection up to 2 US$ 242 US$ 32 US$ 5,904
3/8"
3.14.2 Connection up to 2 US$ 316 US$ 34 US$ 6,936
7/8"
3.14.3 Connection up to 3 US$ 486 US$ 36 US$ 8,418
1/2"
3.14.4 Connection up to 4 US$ 600 US$ 46 US$ 12,630
1/2"
3.14.5 Connection up to 6 US$ 1,146 US$ 70 US$ 19,326
5/8"

Fishing and Remedial Page 22 2020


3.15.0 PACK OFF RUBBER AND THIMBLES
Item Casing Operating Day Rate Operating Day Rate Cost when
OD with Tool Standalone USED
3.15.1 Up to 5 US$ 6 US$ 8 US$ 938
1/2"
3.15.2 Up to 7" US$ 6 US$ 9 US$ 951
3.15.3 Up to 9 US$ 7 US$ 11 US$ 1,548
5/8"
3.15.4 Up to US$ 7 US$ 12 US$ 2,497
10 3/4"
3.15.5 Up to US$ 11 US$ 16 US$ 4,191
13 3/8"
3.15.6 Up to US$ 12 US$ 17 US$ 6,105
18 5/8"
3.15.7 Up to US$ 12 US$ 18 US$ 6,526
20"
3.15.8 Up to US$ 15 US$ 22 US$ 7,789
30"

GENERAL TOOLS

4.1.0 BIT BREAKERS

Size Operating Day DAY Standby Day Rate LIH/DBR


Rate
4.1.1 Up to 4" OD US$ 12 US$ 12 US$ 868
4.1.2 Up to 5" OD US$ 14 US$ 14 US$ 868
4.1.3 Up to 6" OD US$ 16 US$ 16 US$ 868

4.2.0 CIRCULATING SUBS (BURST DISC TYPE)


Item Size Operating Day DAY Standby Day Redress Kits LIH/DBR
Rate Rate (If Used)
4.2.1 Up to 4 3/4" US$ 164 US$ 82 US$ 218 US$ 5,524
OD
4.2.2 Up to 6 1/2" US$ 194 US$ 94 US$ 276 US$ 6,170
OD
4.2.3 Up to 8" OD US$ 228 US$ 112 US$ 356 US$ 10,352
4.2.4 Up to 9 1/2" US$ 228 US$ 112 US$ 356 US$ 13,108
OD

Fishing and Remedial Page 23 2020


4.3.0 CIRCULATING SUBS (DROP BALL TYPE)
Item Size Operating Day DAY Standby Day Redress LIH/DBR
Rate Rate Kits (If
Used)
4.3. Up to 4 3 4" US$ 148 US$ 74 US$ 108 US$ 4,604
1 OD
4.3. Up to 6 1 2" US$ 174 US$ 88 US$ 138 US$ 5,142
2 OD
4.3. Up to 8" OD US$ 208 US$ 104 US$ 178 US$ 8,628
3
4.3. Up to 9 1/2" US$ 208 US$ 104 US$ 178 US$ 10,926
4 OD

4.4.0 WASHOVER PIPE (Range 1, 2 and 3)


Price per Joint
Item Size Operating Day Rate DAY Standby Day DAY LIH/DBR
Rate
4.4.1 Up to 5" OD US$ 168 US$ 88 US$ 5,518
4.4.2 Up to 5 1/2" OD US$ 104 US$ 58 US$ 4,216
4.4.3 Up to 5 3/4" OD US$ 122 US$ 74 US$ 4,490
4.4.4 Up to 7 5/8" OD US$ 156 US$ 88 US$ 5,196
4.4.5 Up to 8 1/8" OD US$ 184 US$ 104 US$ 13,688
4.4.6 Up to 10 3/4" OD US$ 208 US$ 118 US$ 6,566
4.4.7 Up to 11 34" OD US$ 226 US$ 126 US$ 6,466
4.4.8 Up to 16" US$ 306 US$ 172 US$ 13,468
4.4.9 Up to 24" US$ 1,610 US$ 610 US$ 30,242

Washover pipe transportable by Helicopter is available in 9.5 ft lengths.

4.4.10 Washover pipe crossover subs: 75% of above prices on largest OD size.

Fishing and Remedial Page 24 2020


4.5.0 WASHOVER PIPE TOP SUBS - DRIVE SUBS
Item Size Operating Day Rate DAY Standby Day DAY LIH/DBR
Rate
4.5.1 Up to 5" OD US$ 104 US$ 56 US$ 1,566
4.5.2 Up to 5 3/4" OD US$ 142 US$ 56 US$ 2,082
4.5.3 Up to 7 5/8" OD US$ 208 US$ 82 US$ 2,944
4.5.4 Up to 8 1/8" OD US$ 256 US$ 94 US$ 3,022

4.5.5 Up to 10 3/4" OD US$ 306 US$ 106 US$ 4,490


4.5.6 Up to 11 3/4" OD US$ 414 US$ 134 US$ 4,912
4.5.7 Up to 16" US$ 614 US$ 154 US$ 12,406
4.5.8 Up to 24" US$ 1,088 US$ 200 US$ 22,664

4.6.0 WASHOVER PIPE SAFETY TOP SUBS - DRIVE SUBS:Back off Type - Full Opening Type

Item Size Operating Day Rate Standby Day Rate LIH/DBR


4.6.1 Up to 5 3/4" OD US$ 208 US$ 52 US$ 10,838

4.6.2 Up to 7 5/8" OD US$ 414 US$ 104 US$ 20,571

4.6.3 Up to 10 3/4" OD US$ 614 US$ 154 US$ 43,890

4.6.4 Up to 11 3/4" OD US$ 818 US$ 212 US$ POA

ACCESSORIES FOR WASHOVER PIPE - Per unit per Day used or unused

4.7.0 LIFT PLUGS (Bail Type)


Price per Unit per Day

Item Size USED/UN-USED/DAY LIH/DBR

4.7.1 Up to 5 3/4" OD US$ 20 US$ 980

4.7.2 Up to X 1 8" OD US$ 32 US$ 1,546

4.7.3 Up to | | 3 4" OD US$ 40 US$ 2,238

4.7.4 Up to 1 6" OD US$ 82 US$ 7,134

4.7.5 Up to 24" OD US$ 126 US$ 9,844

Fishing and Remedial Page 25 2020


4.8.0 ELEVATOR (Side Door)
Price per Unit per Day
Item Size USED/UN-USED/DAY LIH/DBR
4.8.1 Up to 5 3/4" OD US$ 32 P.O.A.
4.8.2 Up to 8 1/8" OD US$ 46 P.O.A.
4.8.3 Up to 11 3/4" OD US$ 58 P.O.A.
4.8.3 Up to 16" OD US$ 70 P.O.A.

ACCESSORIES FOR WASHOVER PIPE - Per unit per Day used or unused

4.9.0 ELEVATOR (Single Joint)

Item Size USED/UN-USED/DAY LIH/DBR

4.9.1 Up to 5 3/4" OD US$ 28 US$ 5,360

4.9.2 Up to 8 1/8" OD US$ 30 US$ 5,360

4.9.3 Up to 11 3/4" OD US$ 44 US$ 9,200

4.9.4 Up to 16" OD US$ 54 US$ P.O.A.

4.10.0 CASING/ WASHOVER PIPE SLIPS


Item Size USED/UN-USED/DAY LIH/DBR
4.10.1 Up to 8 1/8" OD US$ 40 US$ 4,214
4.10.2 Up to 16" OD US$ 74 US$ 6,306

4.11.0 CASING/ WASHOVER SAFETY CLAMPS


Price per Unit per Day
Item Size USED/UN-USED/DAY LIH/DBR
4.11.1 Up to 8 1/8" OD US$ 40 US$ 5,000
4.11.2 Up to 16" OD US$ 74 US$ 8,014

Fishing and Remedial Page 26 2020


4.12.0 DEBRIS SUBS
_For insertion in Casing/ Liner to recover junk, in ongoing milling operations
Item TOOL OD Casing Size Operating Day Standby Day Run Charge LIH/DBR
Rate Rate
4.12.1 5 3/4" OD 7" Liner US$ 1,806 US$ 370 US$ 1,362 P.O.A.
4.12.2 8 1/8" OD 9 5/8" Casing US$ 2,178 US$ 418 US$ 1,362 P.O.A.

4.13.0 EXTERNAL PIPE CUTTER


Type Per Cut Per Standby Date Rate LIH/DBR
Casing
4.13.1 Mechanical Cutter US$ 1,718 US$ 94 US$
19,196
4.13.2 Special Washover Hydraulic Cutter US$ - US$ - US$ -

Plus, Repairs - refer current National Oilwell replacement list, plus 10%, for individual part prices.
4.13.3 If cutter is run and no cut is made a minimum of US$ 500 will be charged in addition to Standby
charge.

4.13.4 LIH/DBR Body prices include cutters

4.14.0 BLEED OFF SUB/ ANCHOR SUB

(For use with Coil Tubing services)

Item Size Per cut per Casing Standby Day Rate LIH/DBR
4.14.1 Used with 3 1/2" OD US$ 1,254 US$ 94 US$ P.O.A.
Tool
4.14.2 Used with 4" OD Tool US$ 1,308 US$ 126 US$ P.O.A.

Plus Repairs

4.15.0 SAFETY JOINT - Baash Ross/ Bowen Types


Item Size Per cut Standby Day Rate LIH/DBR
per
Casing
4.15.1 Connection up to 3 1/2" US$ 156 US$ 40 US$ 12,866
4.15.2 Connection up to 4 1/2" US$ 204 US$ 52 US$ 23,810
4.15.3 Connection up to 6 5/8" US$ 260 US$ 66 US$ 24,988
4.15.4 Connection up to 7 5/8" US$ 316 US$ 82 US$ 30,240

Fishing and Remedial Page 27 2020


4.16.0 SAFETY JOINT - J-Slot Type
Item Size Per cut per Casing Standby Day Rate LIH/DBR

4.16.1 Connection up to 3 1/2" US$ 178 US$ 70 US$ 10,190


4.16.2 Connection up to 4 1/2" US$ 230 US$ 90 US$ 12,318
4.16.3 Connection up to 6 5/8" US$ 430 US$ 106 US$ 17,216

4.17.0 ROPE SPEAR (Single or Double)


Item Size Operating Day Rate Standby Day Rate LIH/DBR
4.17.1 Connection up to 2 7/8" US$ 152 US$ 36 US$ 5,846

4.17.2 Connection up to 3 1/2" US$ 204 US$ 52 US$ 10,438

4.17.3 Connection up to 4 1/2" US$ 306 US$ 76 US$ 12,270

4.18.0 HYDRAULIC ACTUATED KNUCKLE JOINT


Item Size Operating Day Rate Standby Day Rate LIH/DBR
4.18.1 Under 5" OD US$ 780 US$ 444 US$ 14,424
4.18.2 Over 5" OD US$ 1,014 US$ 542 US$ 33,024

4.19.0 CASING STRIPPING PLATES


Item Size Operating Day Rate Standby Day Rate LIH/DBR
4.19.1 Up to 30" OD US$ 52 US$ 52 US$ P.O.A.

4.20.0 SPIDER Rotary Stand and Stripping Bowl


Item Size Operating Day Rate Standby Day LIH/DBR
Rate
4.20.1 APIi Taper Bowl and US$ 476 US$ 112 US$ P.O.A.
Stand
4.20.2 API Taper Spider only US$ 260 US$ 64 US$ P.O.A.
4.20.3 Rotary Stand only US$ 260 US$ 64 US$ P.O.A.

4.21.0 API ROTARYSUBS


Item Size Operating Day Rate Standby Day Rate LIH/DBR
4.21.1 Connection up to 2 3/8" US$ 20 US$ 20 US$ 1,676
4.21.2 Connection up to 2 7/8" US$ 24 US$ 24 US$ 1,794
4.21.3 Connection up to 3 1/2" US$ 28 US$ 28 US$ 1,952
4.21.4 Connection up to 4 1/2" US$ 28 US$ 28 US$ 2,270

Fishing and Remedial Page 28 2020


4.21.5 Connection up to 5 1/2" US$ 30 US$ 30 US$ 2,974
4.21.6 Connection up to 6 5/8" US$ 32 US$ 32 US$ 3,438
4.21.7 Connection up to 7 5/8" US$ 34 US$ 34 US$ 3,698
4.21.8 Connection up to 8 5/8" US$ 50 US$ 50 US$ 4,692
Crossovers with tubing connections, e.g. VAM, Hydril, Buttress. - Add 50% to the above prices

4.22.0 JUNK SUB - BOOT BASKET SUB


Item Size Operating Day Rate Standby Day LIH/DBR
Rate
4.22.1 Connection up to 2 7/8" US$ 104 US$ 18 US$ 2,680
4.22.2 Connection up to 3 1/2" US$ 126 US$ 24 US$ 2,932
4.22.3 Connection up to 4 1/2" US$ 138 US$ 32 US$ 4,466
4.22.4 Connection up to 6 5/8" US$ 164 US$ 50 US$ 7,742
4.22.5 Connection up to 7 5/8" US$ 218 US$ 66 US$ 10,584
4.22.6 For Baskets with Magnet Inserts - add 60% to Rental Prices. add 30% for sales prices

4.23.0 BLOW OUT SUB (Burst Disk Type) - For use with Hydraulic Junk Retrieval Tool
Item Size Operating Standby Redress LIH/DBR
Day Rate Day Rate Kit Sale
(if used)
4.23.1 Connection up to 3 1/2" US$ 164 US$ 82 US$ 218 US$ 5,524
4.23.2 Connection up to 4 1/2" US$ 194 US$ 94 US$ 276 US$ 6,170
4.23.3 Connection up to 6 5/8" US$ 228 US$ 112 US$ 356 US$ 10,352

* Includes additional Redress Kits


Note: No rental charges apply to Blow Out Subs when tool is used in conjunction with Hydraulic Junk Retrieval Tool.

4.24.0 FISHING MAGNET (With Standard Guide)


Item Size Operating Day Standby Day LIH/DBR
Rate Rate
4.24.1 Up to 6" US$ 208 US$ 60 US$ 6,354
4.24.2 Up to 8 1/2" US$ 332 US$ 76 US$ 12,584
4.24.3 Up to 12 1/4" US$ 654 US$ 106 US$ 29,185
4.24.4 Up to 17 1/2" US$ 1,224 US$ 144 US$ 41,391
4.24.5 Up to 22" US$ 2,450 US$ 182 P.O.A.

4.25.0 DITCH MAGNET


Item Size Operating Day Standby Day LIH/DBR
Rate Rate
4.25.1 All Sizes US$ 50 US$ 50 US$ 4,416

Fishing and Remedial Page 29 2020


4.26.0 NON ROTATING STABILIZER
Item Body OD Sleeve Operating Standby Day Sale of LIH/DBR
OD Day Rate Rate Sleeve*
4.26.1 Up to 4 3/4" Up to 6" US$ 36 US$ 36 * US$ 6,262
OD
4.26.2 Up to 6 1/4" Up to 8 US$ 56 US$ 56 * US$ 7,104
1/2" OD
4.26.3 Up to 8" Up to 12 US$ 74 US$ 74 US$ 9,348
1/4" OD

Sleeves can be modified to Customer requirements but will be considered as a sale.


* Refer Current Sales Prices for Sleeves.

** Body only
4.27.0 BULLNOSE SUBS/RESTRICTOR SUBS
Bullnose subs Jetted or Stabilized. Restrictor subs for Underreamers

Item Connection Blade Operating Day Standby LIH/DBR


OD Rate Day Rate
4.27.1 Up to 4 1/2" N/A US$ 46 US$ 46 US$ 2,616

4.27.2 Up to 6 5/8" N/A US$ 64 US$ 64 US$ 4,686


4.27.3 Up to 7 5/8" N/A US$ 74 US$ 74 US$ 5,272

4.27.4 Up to 6 5/8" Up to US$ 112 US$ 112 US$ 6,042


16" OD
4.27.5 Up to 7 5/8” Up to US$ 126 US$ 126 US$ 6,626
17-1/2"
OD

4.29.0 OFFSHORE BASKETS

Size Operating Standby DAY LIH/DBR


Day Rate Rate
4.29.1 Offshore Baskets up to 7' Long/ US$ - US$ 14 US$ 6,348
Tool and Grapple Boxes
4.29.2 Offshore Baskets over 7' Long to US$ - US$ 20 US$ 12,696
15' Long
4.29.3 Offshore Baskets over 15' Long US$ - US$ 28 US$ 15,870
to 21' Long
4.29.4 Offshore Baskets over 21' Long US$ - US$ 40 US$ 19,044
to 30' Long
4.29.5 Offshore Baskets over 30' Long US$ - P.O.A. P.O.A.

Fishing and Remedial Page 30 2020


4.31.0 CASING ROLLERS
Connection Casing Operating DAY Standby DAY LIH/DBR
Size Rate Rate
4.31.1 Up to 2 7/8" Up to 5 US$ 508 US$ 66 US$ 11,060
1/2" OD
4.31.2 Up to 3 1/2" Up to 7" US$ 614 US$ 76 US$ 16,948
OD
4.31.3 Up to 4 1/2" Up to 9 US$ 818 US$ 106 US$ 29,444
5/8" OD
4.31.4 Up to 6 5/8" Up to 13 US$ 1,228 US$ 138 US$ 49,922
3/8" OD
4.32.0 Connection Casing Operating DAY Standby DAY LIH/DBR
CASING Size Rate Rate
SCRAPERS
4.32.1 Up to 2 7/8" Up to 5 US$ 366 US$ 52 US$ 16,770
1/2" OD
4.32.2 Up to 3 1/2" Up to 7" US$ 410 US$ 66 US$ 21,316
OD
4.32.3 Up to 4 1/2" Up to 9 US$ 664 US$ 106 US$ 40,638
5/8" OD
4.32.4 Up to 6 5/8" Up to 13 US$ 920 US$ 144 US$ 45,634
3/8" OD

size
4.34.0 IMPRESSION BLOCKS
Operating Day Standby DAY LIH/DBR
Rate
4.34.1 Up to 6" US$ 494 US$ 32 US$ 2,777
4.34.2 Up to 8 1/2" US$ 572 US$ 50 US$ 2,448
4.34.3 Up to 12 1/4" US$ 738 US$ 66 US$ 4,856
4.34.4 Up to 17 1/2" US$ 1,124 US$ 92 US$ 8,132
4.34.5 Up to 20" US$ 1,360 US$ 112 P.O.A.
4.34.6 Up to 27" US$ 1,576 US$ 148 P.O.A.
*Lead lost in hole will be re-
charged to Customer

Fishing and Remedial Page 31 2020


4.35.0 STANDARD MARINE SWIVEL

Size Operating Day Standby DAY LIH/DBR


Rate
4.35.1 Connection up to 3 US$ 572 US$ 134 US$ 18,326
1/2"
4.35.2 Connection up to 4 US$ 718 US$ 178 US$ 31,156
1/2"
4.35.3 Connection up to 6 US$ 1,088 US$ 258 US$ 37,220
5/8"

4.36.0 ADAPTOR/ LANDING PLATE FOR MARINE SWIVEL


Size Operating Standb DAY LIH/DB
Day y Rate R
4.36.1 For OD above 14 3/4" US$ 90 US$ 18 US$ 3,49
8

4.37.0
CENTRALIZER (NON ROTATING STEEL BLADES)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
4.37.1 All sizes each, c/w steel US$ 144 US$ 30 P.O.A.
sleeves

*Refer replacement price list for individual mandrels and sleeve size sale praises
*These prices are applied if used with Whipstock operations

2 7/8”/ 3 3/8” DRILL PIPE, 3 1/8”/ 3 3/8” OD DRILL COLLARS AND ANCILLARY EQUIPMENT
4.38.0 3 3/8” OD DRILLPIPE/ 3 3/8” OD DRILL COLLAR PLUS ANCILLARY
EQUIPMENT
Size Operating Standby DAY LIH/DBR
Day Rate
4.38.1 2 7/8" OD Drill Pipe - 10.4 lb/ft US$ 12 US$ 12 US$
3 3/8" Pac DS Connections

4.38.2 Lift Plugs for 3 3/8" Pac DS Drill US$ 4 US$ 4 US$
Pipe 3 3/8" Pac DS Connections

4.38.3 3 3/8" OD Drill Collar - 24 lb/ft US$ 18 US$ 18 US$


3 3/8" Pac DS Connections

Fishing and Remedial Page 32 2020


4.38.4 Slip Type Elevator 3 3/8" Neck US$ 60 US$ 60 US$
40 Ton Rating c/w 2 7/8" Slip
Assembly
4.38.5 3 3/8" OD Single Joint Elevator US$ 28 US$ 28 US$
4.38.6 3 3/8" OD Drill Collar Elevator US$ 28 US$ 28 US$
4.38.7 3 3/8" OD Drill Collar Slips US$ 28 US$ 28 US$

4.39.0 2 7/8” OD DRILL PIPE/ 3 1/8” DRILL COLLARS PLUS ANCILLARY


EQUIPMENT
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
4.39.1 2 7/8" OD Drill Pipe - US$ 12 US$ 12 US$ 1,952
10.4 lb/ft 2 7/8" Pac DS
Connections
4.39.2 3 1/8" OD Drill Collar - US$ 16 US$ 16 US$ 3,444
24 lb/ft 2 7/8" Pac DS
Connections
4.39.3 Lift Plugs for 2 7/8" Pac US$ 4 US$ 4 US$ 516
DS Drill Pipe 2 7/8" Pac
DS Connections
4.39.4 Slip Type Elevator 40 US$ 60 US$ 60 US$ 9,218
Ton Rating c/w 2 7/8"
Slip Assembly
4.39.5 2 7/8" OD Single Joint US$ 28 US$ 28 US$ 5,816
Elevator
4.39.6 2 7/8" OD Drill Collar US$ 28 US$ 28 US$ 6,736
Elevator
4.39.7 3 1/8" OD Drill Collar US$ 28 US$ 28 US$ 4,880
Slips

4.40.0 ANCILLARY EQUIPMENT


Size Operating Day Standby DAY LIH/DBR
Rate
4.40.1 Baash Ross Safety US$ 28 US$ 28 US$ 5,004
Clamp 1 1/8"- 4
1/2"c/w Wrench
4.40.2 Set Type 'C' Tongs US$ 48 US$ 48 US$ 6,506
with latch jaws 2
3/8"- 3.688"
4.40.3 2 7/8" OD Drill Pipe US$ 28 US$ 28 US$ 4,880
Slips

Fishing and Remedial Page 33 2020


4.40.4 Hydril Kelly Guard - US$ 58 US$ 58 US$ P.O.A.
10,000 psi WP 3
1/2" If Conns, c/w
Wrench
4.40.5 Grey Inside BOP - US$ 30 US$ 30 US$ P.O.A.
5,000 psi WP 2
7/8" Pac DS Conns,
c/w Release tool

4.41.0 3 1/2” OD DRILL PIPE/ 4 1/8” DRILL COLLARS


Size Operatin DAY Standb DAY LIH/DB
g Rate y Rate R
4.41.1 3 1/2" OD WT Drill Pipe - US$ 28 US$ 28 P.O.A.
13.3 lb/ft Hydril WT31
Connections
4.41.2 4 1/8" OD Drill Collar - 35 US$ 40 US$ 40 P.O.A.
lb/ft Hydril WT31
Connections

4.42.0 ANCILLARY EQUIPMENT


Size Operatin DAY Standb DAY LIH/DB
g Rate y Rate R
4.42.1 Slip Type Elevator 100 US$ 60 US$ 60 US$ P.O.A
Ton Rating c/w 3 1/2" .
Slip Assy
4.42.2 3 1/2" OD Drill Pipe Slips US$ 28 US$ 28 US$ P.O.A
.
4.42.3 4 1/8" OD Drill Collar US$ 28 US$ 28 US$ P.O.A
Elevator .
4.42.4 Lift Plugs for WT31Drill US$ 4 US$ 4 US$ P.O.A
Pipe .
WT31Connections
4.42.5 Baash Ross Safety Clamp US$ 28 US$ 28 US$ P.O.A
1 1/8"- 4 1/2"c/w .
Wrench

4.43.0 HEAVY WEIGHT DRILL PIPE

Size Operatin DAY Standby DAY LIH/DB


g Rate Rate R

4.43.1 Connection up to 4 1/2” US$ 20 US$ 20 P.O.A

Fishing and Remedial Page 34 2020


WHIPSTOCK TOOLS

All mills dressed with special WIS Tungsten Carbide Cutting Inserts.

5.1.0 ECONOSTOCK (BOTTOM TRIP WHIPSTOCK) - TrackMaster Whipstock System Single Trip
For Casing Size Operating Rate Standby DAY [**anchor/whi
Rate p ONLY LIH/
DBR
5.1.1 Up to 5 1/2" US$ 54,520 US$ 434 P.O.A.
5.1.2 Up to 7” US$ 65,832 US$ 546 P.O.A.
5.1.3 Up to 7 5/8" US$ 77,296 US$ 562 P.O.A.
5.1.4 Up to 9 5/8" US$ 85,166 US$ 1,070 P.O.A.
5.1.5 Up to 13 3/8" US$ 133,702 US$ 1,194 P.O.A.
5.1.6 Up to 20" US$ 386,204 US$ 1,692 P.O.A.

5.2.0 RETRIEVABLE PACKSTOCK/ANCHOR - TrackMaster Whipstock System Single Trip


For Casing Size RATE ONLY LIH/ DBR
5.2.1 Up to 5 1/2" US$ 78,506 US$ 434 P.O.A.
5.2.2 Up to 7" US$ 92,000 US$ 546 P.O.A.
5.2.3 Up to 7 5/8" US$ 103,040 US$ 562 P.O.A.
5.2.4 Up to 9 5/8" US$ 124,710 US$ 1,070 P.O.A.
5.2.5 Up to 10 3/4" US$ 165,814 US$ 1,268 P.O.A.
5.2.6 Up to 13 3/8" US$ 222,436 US$ 1,570 P.O.A.

5.3.0 PERMANENT PACKSTOCK/ANCHOR - TrackMaster Whipstock System Single Trip


For Casing Size Operating Standby DAY [**packer/whip
Rate Rate ONLY LIH/ DBR
5.3.1 Up to 5 1/2" US$ 65,424 US$ 434 PO A
5.3.2 Up to 7" US$ 76,668 US$ 546 PO A
5.3.3 Up to 7 5/8 " US$ 85,868 US$ 562 PO A
5.3.4 Up to 9 5/ 8" US$ 103,926 US$ 1,070 PO A
5.3.5 Up to 10 3/4" US$ 138,178 US$ 1,268 PO A
5.3.6 Up to 13 3/8" US$ 185,364 US$ 1,570 PO A

* Operating Rate per Whipstock setting and is inclusive of run and redress charges for all mills
plus ancillary equipment.

Fishing and Remedial Page 35 2020


** LIH/DBR for Anchor/ Packer and Whipstock only, refer to section 2 for individual mill costs and
the replacement price list for ancillary equipment.
5.4.0 Special applications whips, shallow exit and low dog leg severity whips P.O.A.
5.5.0 PDC Milling Systems P.O.A

5.6.0 TRACKMASTER MILL


For Casing Size Standby DAY Run [tool LIH/DBR
Rate Charge
5.6.1 Up to 5 1/2" US$ 92 US$ 6,962 US$ 64,476
5.6.2 Up to 7 5/8" US$ 112 US$ 9,292 US$ 80,346
5.6.3 Up to 9 5/8" US$ 144 US$ 10,544 US$ 135,888
5.6.4 Up to 13 3/8" US$ 200 US$ 14,648 US$ 209,886
5.6.5 Up to 20" P.O.A P.O.A. P.O.A.

* Only charged if mill used with Whipstock operation

Rates are for conventional carbide insert mill. PDC Mill (GeoTrack and FastTrack) P.O.A.

Set Tools

6.1.0 ROLLER REAMERS, BORROX


Hole MINIMUM Operating Standby Cutters DBR/LIH
Size CHARGE Rate Rate
DAY DAY
6.1.1 5.875" US$ 2,063 US$ 338 US$ 188 US$ 28,730 US$ 64,641
-
6.250"
6.1.2 6.500" US$ 2,406 US$ 420 US$ 219 US$ 30,645 US$ 68,951
6.1.3 7.875" US$ 2,668 US$ 448 US$ 243 US$ 32,228 US$ 72,512
6.1.4 8.375" US$ 3,163 US$ 561 US$ 288 US$ 34,268 US$ 77,102
8.75"
6.1.5 9.875" US$ 3,644 US$ 626 US$ 331 US$ 46,371 US$ 104,335
-
9.875"
6.1.6 10.62 US$ 3,864 US$ 704 US$ 351 US$ 67,196 US$ 151,190
5"
6.1.7 US$ 4,194 US$ 753 US$ 381 US$ 95,696 US$ 215,315

Fishing and Remedial Page 36 2020


6.1.8 14.25" US$ 5,211 US$ 779 US$ 474 US$ 112,84 US$ 253,901
- 5
16.50"
6.1.9 17" - US$ 6,848 US$ 878 US$ 623 US$ 130,50 US$ 293,625
22" 0

HOLE OPENERS
6.4.0 HOLE OPENER - FIXED CONES GTA-SDD TYPE
Size
[Body [Cutter [Cutter [Cutter [body lih/dbr
Rental Sale Sale Sale
Per Day OBMT* SBMT** SBBT***
6.4.1 8 1/2" US$ 108 US$ 57,788 P.O.A. P.O.A. US$ 61,992
6.4.2 12 1/4" US$ 120 US$ 89,436 P.O.A. P.O.A. US$ 86,184
6.4.3 17 1/2" US$ 132 US$ 90,812 P.O.A. P.O.A. US$ 108,864
6.4.4 26" US$ 174 US$ 159,608 P.O.A. P.O.A. US$ 176,904
6.4.5 36" US$ 222 US$ 187,124 P.O.A. P.O.A. US$ 190,512
* Open Bearing Milled Tooth
Sealed Bearing Milled Tooth
Sealed Bearing Button Type

6.5.0 HOLE OPENER - FIXED CONES, GRANT TYPE


For Security, Grant Type - for the Hole sizes
Size
Body Cutter Sale Cutter Sale Cutter Sale [body lih/dbr
Rental Per OBMT* SBMT** SBBT***
Day
6.5.1 8 1/2" US$ 120 US$ 58,968 US$ 39,312 N/A US$ 95,256
6.5.2 12 1/4" US$ 186 US$ 95,256 US$ 42,336 US$ 64,260 US$ 154,22
4
6.5.3 17 1/2" US$ 246 US$ 149,68 US$ 60,480 US$ 105,84 US$ 207,14
8 0 4
6.5.4 26" US$ 258 US$ 263,08 US$ 120,96 US$ 122,47 US$ 262,10
8 0 2 4
6.5.5 36" US$ 276 US$ 308,44 US$ 129,36 US$ 214,70 US$ 328,10
8 0 4 4

Fishing and Remedial Page 37 2020


6.6.0 HOLE OPENER - FIXED CONES, SECURITY TYPE

Size [Body Rental Per Day cutter Sale Cutter Sale Cutter [body
441M 441H Sale MG lih/dbr
- SB
6.6.1 17 US$ 702 US$ 84,108 US$ 84,108 N/A US$
1/2" 193,692
6.6.2 26" US$ 966 N/A N/A US$ US$
133,356 367,212
6.6.3 36" US$ 1,140 N/A N/A US$ US$
176,976 376,284
* Includes Cutter Usage, a percentage of wear will be added to Rental up
to 100% of Sale Price.
Cutters will be sold if Damaged Beyond
Repair.

Fishing and Remedial Page 38 2020


IHYDRAULIC TOOLS

7.1.0 MULTI CYCLE BY-PASS VALVES


Size Operating Day Rate Standby Day [redress KITS [lih/ dbr
Rate (If Used)
7.1.1 5" OD US$ 750 US$ 144 US$ 508 US$ 58,062
7.1.2 6 3/4" OD US$ 954 US$ 194 US$ 532 US$ 86,766
7.1.3 8" OD US$ 954 US$ 194 US$ 532 US$ 104,742

7.2 SECTION MILL


Dressed With Special WIS Tungsten Carbide Cutting Inserts.
TOOL OD Operating Standby Run Charge Run Charge [body
Csg SIZE Rate Rate CUTTERS SLEEVE lih/ dbr
DAY DAY
7.2.1 Up to 4 Up to 5 US$ 1,102 US$ 120 US$ 5,396 US$ 7,320 US$ 63,486
V" V"

7.2.2 Up to 5 Up to 7 US$ 1,472 US$ 156 US$ 5,396 US$ 7,320 US$ 63,486
V" 5/8"
7.2.3 Up to 8 Up to 9 US$ 1,964 US$ 212 US$ 7,202 US$ 10,254 US$ 86,112
W" 5/8"
7.2.4 Up to 9 Up to 10 US$ 2,236 US$ 242 US$ 8,294 US$ 10,626 US$ 91,368
W" %"
7.2.5 Up to 11 Up to 16" US$ 2,700 US$ 292 US$ 13,310 US$ 12,708 US$ 111,462
%"
7.2.6 Up to 16 Up to 20" US$ 8,098 US$ 870 P.O.A. P.O.A. P.O.A.
V"

* Parts damaged beyond repair: -

- Sale as per manufacture's current price list plus 15%, plus freight and ancillary costs.

Fishing and Remedial Page 39 2020


7.3.0 INTERNAL HYDRAULIC PIPE CUTTER
All knives dressed with special WIS Crushed Tungsten Carbide.
_Single or multiple cuts, charged by the following tubing or casing sizes_
Slze
[per cut per CASING Standby DAY [cutters sold [body lih/dbr
Rate lih/dbr
7.3.1 Up to 5 US$ 1,308 US$ 92 US$ 7,318 US$ 36,786
1/2"
7.3.2 Up to 7 " US$ 1,456 US$ 120 US$ 9,270 US$ 50,880
7.3.3 Up to 7 US$ 1,744 US$ 120 US$ 11,584 US$ 50,880
5/8"
7.3.4 Up to 9 US$ 1,890 US$ 156 US$ 16,480 US$ 120,546
5/8"
7.3.5 Up to 11 US$ 2,044 US$ 156 US$ 19,440 US$ 120,546
3/4"
7.3.6 Up to 13 US$ 2,130 US$ 198 US$ 20,916 US$ 185,796
3/8"
7.3.7 Up to 16" US$ 2,626 US$ 198 US$ 29,314 US$ 185,796
7.3.8 Up to 24" US$ 2,914 US$ 198 US$ 47,268 US$ 185,796
7.3.9 Up to 30" US$ 3,372 US$ 198 US$ 47,268 US$ 185,796
7.3.10 Up to 40" US$ 3,066 US$ 198 US$ 54,180 US$ 185,796

- 7.3.11 To cut over 1 3/8" - 1 1/2" Wall Thickness add 30% to above cut prices

- 7.3.12 To cut over 1 1/2" Wall Thickness add 50% to above cut prices

JUNK BASKET Reverse Circulation Type


Size
Operating Rate Standby Rate LIH/DBR
DAY DAY
7.4.1 Up to 4 3/4" OD US$ 416 US$ 56 US$ 38,151
7.4.2 Up to 6 1/4" OD US$ 540 US$ 74 US$ 40,638
7.4.3 Up to 8 1/2" OD US$ 630 US$ 90 US$ 41,094
7.4.4 Up to 12 1/4" OD US$ 860 US$ 118 US$ 87,285
7.4.5 Up to 17 1/2" OD US$ 1,000 US$ 134 US$ 140,097

7.4.6 Plus redress of Washover shoe if used, refer to Section 6.5.0 for corresponding size Washover Shoes

Fishing and Remedial Page 40 2020


7.5.0 HYDRAULIC JUNK RETRIEVAL TOOL._
Hole Tool [charge per run Standby DAY* LIH/DBR
Size OD Rate
7.5.1 Up to 5 3 4" US$ 7,190 US$ 152 US$ 45,138
6"
7.5.2 Up to 8 8 1 8" US$ 9,356 US$ 194 US$ (.0, 456
1 2"
7.5.3 Up to 113 US$ 12,88 US$ 234 US$ 85,938
12 1 4" 4" 0
7.5.4 Up to 16 1 2" US$ 16,74 US$ 374 US$ 68,954
1- 1 2" 8
Charge per Run, includes sale of expendable items. e.g. 'O' Ring seals, blow out discs.
* Includes additional Redress Kits
HYDRAULIC JUNK RETRIEVAL TOOL. - Each Redress Kits
consists of:-
Top Sub 'O' Ring, Outer and Inner Barrel 'O' Rings, Piston OD and ID 'O' Rings, Aluminium Hand,
Burst Disk Set and
4 x Anti-Rotation Pins

7.5.0a HYDRAULIC JUNK RETRIEVAL TOOL


CATCHER FINGERS
Tool OD [price
7.5.1a 5 US$ 3,474
3/4"
7.5.2 a 8 US$ 4,328
1/8"
7.5.3a 11 US$ 6,396
3/4"
7.5.4a 16 US$ 7,500
1/2"

7.6.0 HYDRAULIC CASING BACK-OFF TOOL


Tool OD Casing Sizes [operation Standby Day REDRESS LIH/DBR
RATE* Rate CHARGE
7.6.1 5 5/8" OD for 7- 7 5/8" Casing US$ US$ 2,172 US$ US$
75,178 15,000 1,592,514
7.6.2 8" OD for 9 5/8"-13 3/8" US$ US$ 2,656 US$ US$
Casing 98,062 17,000 2,209,674

* Operation Rate - per back off. Includes Redress but excludes cost of repairs or LIH/DBR

Special Alignment Bushing - 7"- 7 5/8" Sale at documented costs plus 10%
Special Alignment Bushing - 9 5/8" Sale at documented costs plus 10%
Special Alignment Bushing - 13 3/8" Sale at documented costs plus 10%

Fishing and Remedial Page 41 2020


ABANDONMENT PACKAGES

CASING CUTTING PACKAGES


8.1.0 JACK UPS_
Size
OPERATING Istandby Ilih/dbr
RATE DAY
8.1.1 Up to 2 Casing US$ 11,360 US$ 400
Strings
8.1.2 3 Casing Strings US$ 15,288 US$ 480 .Refer
Individual
8.1.3 4 Casing Strings US$ 15,834 US$ 578 Items
8.1.4 5 Casing Strings US$ 21,288 US$ 602

8.2.0 FLOATING RIGS, CONVENTIONAL MARINE SWIVEL/ EXPLOSIVE


_(Any combination that may be required)_
Size OPERATING RATE Istandby day Ilih/dbr
8.2.1 Up to 3 Casing Strings US$ 23,240 US$ 772 Refer Individual
Items
8.2.2 4 Casing Strings US$ 25,012 US$ 870
8.2.3 5 Casing Strings US$ 26,782 US$ 970

8.3.0 FLOATING RIGS, 2M SINGLE TRIP SYSTEM/ EXPLOSIVE


_(Any combination that may be required)_
Size OPERATING Istandby
RATE DAY
Ilih/dbr
8.3.1 Up to 3 Casing Strings US$ 26,276 US$ 970 .Refer
Individual
Items
8.3.2 4 Casing Strings US$ 33,622 US$ 970
8.3.3 5 Casing Strings US$ 35,898 US$ 1,114

Fishing and Remedial Page 42 2020


8.4.0 FLOATING RIGS, 2M SINGLE TRIP SYSTEM

Size OPERATING RATE Istandby DAY Ilih/dbr

8.4.1 Up to 2 Casing US$ 16,220 US$ 578


Strings
8.4.2 3 Casing Strings US$ 25,672 US$ 722 Refer
Individual
8.4.3 4 Casing Strings US$ 31,412 US$ 848 Items

8.4.4 5 Casing Strings US$ 35,388 US$ 914

8.5.0 FLOATING RIGS, 2M SINGLE TRIP SYSTEM/MOTOR/EXPLOSIVE (Any combination that


may be required)
Size OPERATING RATE Istandby DAY Ilih/dbr
8.5.1 Up to 3 Casing Strings US$ 41,580 US$ 3,492 Refer
Individual
Items
8.5.2 4 Casing Strings US$ 47,748 US$ 3,492
8.5.3 5 Casing Strings US$ 56,778 US$ 3,724
8.5.4 Damaged motor parts will be charged at documented replacement prise plus 10%

ROLLER REAMERS

9.1.0 ROLLER REAMERS - GRANT MODEL 2020 - 3 POINT

Size IBody Cutter OB* Icutter OB* Icutter SB** IBODY


Range Rental Hardfaced Button Type Button Type LIH/DBR
Per Day
9.1.1 0562 5 5/8"- 5 US$ 34 US$ 4,494 US$ 7,308 N/A US$ 29,394
7/8"
9.1.2 0587 5 3/4"- 6" US$ 34 US$ 4,584 US$ 8,064 N/A US$ 29,394
9.1.3 0625 6"- 6 3/4" US$ 34 US$ 6,042 US$ 8,064 N/A US$ 31,350
9.1.4 0625 6 1/8"- 6 US$ 34 US$ 6,042 US$ 8,064 N/A US$ 31,350
3/8"
9.1.5 0787 6 1/2"- 7 US$ 58 US$ 6,126 US$ 10,596 N/A US$ 32,352
7/8"
9.1.6 0850 8 1/8"- 8 US$ 58 US$ 7,362 US$ 11,892 N/A US$ 35,046
1/2"
9.1.7 0900 8 3/8"- 9" US$ 68 US$ 9,624 US$ 11,892 US$ 18,684 US$ 36,126
9.1.8 0900 9 1/4"- 9 US$ 68 US$ 9,624 US$ 14,556 US$ 18,684 US$ '6. 1 26
7/8"

Fishing and Remedial Page 43 2020


9.1.9 1100 10 5/8"- 11" US$ 68 US$ 10,872 US$ 17,526 US$ P.O.A US$ 47,442
9.1.10 1225 12"- 12 1/4" US$ 96 US$ 10,872 US$ 18,840 US$ 27,630 US$ 68,748
9.1.11 1225 13 1/2"- 13 US$ 96 US$ 10,872 US$ 21,654 US$ 27,630 US$ 68,748
3/4"
9.1.12 1500 14 1/2"- 15" US$ 96 US$ 20,490 US$ 24,618 N/A US$ 97,050
9.1.13 1750 17"- 17 3/4" US$ 96 US$ 20,010 US$ 35,910 N/A US$ 110,538
Open Bearing Cutter Prices OB - per set of three (3).
** Sealed Bearing Cutter Prices SB - per set of three (3)

9.2.0 ROLLER REAMERS - GRANT MODEL 2020 - 6 POINT


Size Body Cutter OB* cutter OB* cutter SB** IBODY
Range Rental Per Hardfaced Button Type Button Type LIH/DBR
Day
9.2.1 0562 5 5/8"- 5 US$ 68 US$ 8,976 US$ 14,604 N/A US$ 58,782
7/8"
9.2.2 0587 5 3/4"- 6" US$ 68 US$ 9,168 US$ 16,128 N/A US$ 58,782
9.2.3 0625 6"- 6 3/4" US$ 68 US$ 12,078 US$ 16,128 N/A US$ 62,700
9.2.4 0625 6 1/8"- 6 US$ 68 US$ 12,078 US$ 16,128 N/A US$ 62,700
3/8"
9.2.5 0787 6 1/2"- 7 US$ 116 US$ 12,246 US$ 21,192 N/A US$ 64,704
7/8"
9.2.6 0850 8 1/8"- 8 US$ 116 US$ 14,724 US$ 23,784 N/A US$ 70,110
1/2"
9.2.7 0900 8 3/8"- 9" US$ 140 US$ 19,254 US$ 23,784 US$ 37,368 US$ 72,252
9.2.8 0900 9 1/4"- 9 US$ 140 US$ 19,254 US$ 29,118 US$ 37,368 US$ 72,252
7/8"
9.2.9 1100 10 5/8"- US$ 140 US$ 21,738 US$ 35,046 US$ VA US$ 94,878
11"
9.2.10 1225 12"- 12 US$ 198 US$ 21,738 US$ 37,692 US$ 55,272 US$ 1 <7,18
1/4"
1
9.2.11 1225 13 1/2"- 13 US$ 198 US$ 21,738 US$ 43,302 US$ 55,272 US$ 137,484
3/4"
9.2.12 1500 14 1/2"- US$ 198 US$ 40,992 US$ 49,236 N/A US$ 194,106
15"
9.2.13 1750 17"- 17 US$ 198 US$ 40,020 US$ 71,820 N/A US$ 221,064
3/4"

* Open Bearing Cutter Prices OB - per set of six (6).


K
* Sealed Bearing Cutter Prises SB - per set of six (6).

Notes:

1 Only new cutter are used. No re-tipped/ used cutters are used in Grant Roller Reamers.
2 Above rental charges apply whether tool is used or unused.

Fishing and Remedial Page 44 2020


LEFT HAND TOOLS

10.1.0 DRILL PIPE - LEFT HAND


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
10.1.1 Connection up to 3 1/2" US$ 42 US$ 42 P.O.A.
10.1.2 Connection up to 4 1/2" US$ 52 US$ 52 P.O.A.

10.3.0 DRILL COLLAR - LEFT HAND


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
10.3.1 Connection up to 3 1/2" US$ 52 US$ 52 P.O.A.
10.3.2 Connection up to 4 1/2" US$ 64 US$ 64 P.O.A.
10.3.3 Connection up to 6 5/8" US$ 86 US$ 86 P.O.A.

10.4.0 KELLY - LEFT HAND PLUS ANCILLARY EQUIPMENT


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
10.4.1 Kelly - LH US$ 116 US$ 116 P.O.A.
10.4.2 Kelly Bushing US$ 162 US$ 162 P.O.A.
10.4.3 Kelly Cocks - LH US$ 162 US$ 162 P.O.A.

10.5.0 REVERSING TOOLS - Right Hand Torque in - Left Hand Torque out
Tool OD Casing [operation Standby LIH/DBR
Size RATE* Day
Rate
10.5.1 4 11/16" OD for 5" US$ 8,330 US$ 704 US$ 255,306
Casing
10.5.2 5 13/16" OD for 7" US$ 10,958 US$ 704 US$ 325,650
Casing
10.5.3 7 3/4" OD for 9 5/8" US$ 13,630 US$ 898 US$ 369,660
Casing
10.5.4 7 3/4" OD for 13 US$ 17,446 US$ 1,216 US$ 431,280
3/8"
Casing
complete
with Adaptor
* Operation Rate - per back off. Includes Redress but excludes cost of repairs or LIH/DBR

Fishing and Remedial Page 45 2020


* Operation Rate - per back off. Includes Redress but excludes cost of repairs or LIH/DBR

LEFT HAND EQUIPMENT

10.6.0 JAR - LEFT HAND Add 40% to Right Hand tool prices
10.7.0 FISHING BUMPER SUB - LEFT HAND Add 40% to Right Hand tool prices
10.8.0 JAR INTENSIFIER (ACCELERATOR) - LEFT HAND Add 40% to Right Hand tool prices
10.9.0 OVERSHOT - LEFT HAND Add 40% to Right Hand tool prices
10.9.10 SAFETY JOINT - LEFT HAND Add 40% to Right Hand tool prices
10.10.0 DIE COLLAR - LEFT HAND Add 40% to Right Hand tool prices
10.11.0 SPEAR - LEFT HAND Add 40% to Right Hand tool prices
10.12.0 TAPER TAP - LEFT HAND Add 40% to Right Hand tool prices
10.12.0 CROSSOVER SUB - LEFT HAND Add 40% to Right Hand tool prices

TT TOOLS

11.1.0 Coil Connectors - External Slip


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.1.1 CT Connector - 1" to 2 3/8" US$ 84 US$ 16 US$ 4,200
CT
11.1.2 CT Connector - 2 7/8" to 3 US$ 106 US$ 22 US$ 6,900
1/2" CT
11.1.3 Sale of damaged slip/Grapple US$ - US$ - US$ 1,620

11.2.0 Coil Connectors - Internal slip


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.2.1 CT Connector - 1" to 2 3/8" US$ 84 US$ 16 US$ 4,200
CT
11.2.2 CT Connector - 2 7/8" to 3 US$ 106 US$ 22 US$ 6,300
1/2" CT
11.2.3 Sale of damaged slip/Grapple US$ - US$ - US$ 1,440

11.3.0 Coil Connectors - Internal Dimple/External Dimple


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.3.1 CT Connector - 1" to 2 3/8" US$ 52 US$ 10 US$ 3,600
CT
11.3.2 CT Connector - 2 7/8" to 3 US$ 84 US$ 22 US$ 5,400
1/2" CT
11.3.3 Hydraulic Dimple Kit incl: US$ 22 US$ 22 US$ 18,000
Hand Pump

Fishing and Remedial Page 46 2020


11.4.0 Coil Connectors - Internal Crimp/Roll On
Size Operating DAY DAY
Rate Standby Rate LIH/DBR
11.4.1 CT Connector - 1" to 2 3/8" CT US$ 64 US$ 10 US$ 3,600
11.4.2 CT Connector - 2 7/8" to 3 US$ 84 US$ 22 US$ 5,400
1/2" CT

11.5.0 Dual Flapper Check Valves


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.5.1 Thru 1 3/4" OD US$ 158 US$ 52 US$ 13,200
11.5.2 Thru 2 3/8" OD US$ 210 US$ 74 US$ 13,470
11.5.3 Thru 2 7/8" OD US$ 262 US$ 84 US$ 16,500
11.5.4 Thru 3 1/2" OD US$ 316 US$ 106 US$ 19,800

11.6.0 Disconnects - Basic Hvdraulic/MechanicaL Re-sellable


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.6.1 Thru 1 3/4" OD US$ 136 US$ 36 US$ 6,600
11.6.2 Thru 2 3/8" OD US$ 158 US$ 48 US$ 7,200
11.6.3 Thru 2 7/8" OD US$ 184 US$ 58 US$ 8,400
11.6.4 Thru 3 1/2" OD US$ 220 US$ 68 US$ 10,500

11.7.0 Heavy Duty Hydraulic Disconnects


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.7.1 Thru 1 3/4" OD US$ 158 US$ 52 US$ 12,300
11.7.2 Thru 2 3/8" OD US$ 210 US$ 74 US$ 13,500
11.7.3 Thru 2 7/8" OD US$ 262 US$ 84 US$ 15,300
11.7.4 Thru 3 1/2" OD US$ 316 US$ 106 US$ 18,600
11.7.5 Thru 1 3/4" OD w/ Rupture US$ 158 US$ 52 US$ 13,200
Disc Port
11.7.6 Thru 2 3/8" OD w/ Rupture US$ 210 US$ 74 US$ 14,700
Disc Port
11.7.7 Thru 2 7/8" OD w/ Rupture US$ 262 US$ 84 US$ 16,500
Disc Port
11.7.8 Thru 3 1/2" OD w/ Rupture US$ 316 US$ 106 US$ 19,800
Disc Port
11.7.9 Sale of Rupture Discs US$ - US$ - US$ 750

Fishing and Remedial Page 47 2020


11.8.0 Flow Activated Disconnects
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.8.1 Thru 1 3/4" OD US$ 320 US$ 100 US$ 21,600
11.8.2 Thru 2 3/8" OD US$ 410 US$ 116 US$ 22,800
11.8.3 Thru 2 7/8" OD US$ 504 US$ 132 US$ 23,100
11.8.4 Thru 3 1/2" OD US$ 594 US$ 152 US$ 25,200

11.9.0 Flow Activated Disconnects with Time Delay

Sto Operating DAY Standby DAY LIH/DBR


Rate Rate
11.9.1 Thru 1 3/4" OD US$ 368 US$ 106 US$ 24,600
11.9.2 Thru 2 3/8" OD US$ 442 US$ 126 US$ 25,800
11.9.3 Thru 2 7/8" OD US$ 526 US$ 148 US$ 26,400
11.9.4 Thru 3 1/2" OD US$ 632 US$ 168 US$ 28,200

10.10.0 Dual Circulating Valve


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.10.1 Thru 1 3/4" OD US$ 168 US$ 52 US$ 6,300
11.10.2 Thru 2 3/8" OD US$ 190 US$ 74 US$ 7,500
11.10.3 Thru 2 7/8" OD US$ 210 US$ 84 US$ 10,200
11.10.4 Thru 3 1/2" OD US$ 232 US$ 94 US$ 11,400
11.10.5 Sale of Rupture Discs US$ - US$ - US$ 750

11.11.0 Drop Ball Circulating Valve


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.11.1 Thru 1 3/4" OD US$ 148 US$ 42 US$ 5,400
11.11.2 Thru 2 3/8" OD US$ 168 US$ 52 US$ 7,200
11.11.3 Thru 2 7/8" OD US$ 190 US$ 64 US$ 9,000
11.11.4 Thru 3 1/2" OD US$ 210 US$ 74 US$ 10,500

11.12.0 Motor Head Assemblies


Slze Operating DAY Standby DAY LIH/DBR
Rate Rate
11.12.1 Thru 1 3/4" OD US$ 620 US$ 190 US$ 18,300
11.12.2 Thru 2 3/8" OD US$ 736 US$ 274 US$ 19,800
11.12.3 Thru 2 7/8" OD US$ 800 US$ 336 US$ 22,500
11.12.4 Thru 3 1/2" OD US$ 862 US$ 400 US$ 24,600
11.12.5 Sale of Rupture Discs US$ US$ US$ 750

Fishing and Remedial Page 48 2020


11.13.0 Crossovers - Rotary, Pump in-Sub
Slze Operating DAY Standby DAY LIH/DBR
Rate Rate
11.13.1 Thru 1 3/4" OD US$ 22 US$ 10 US$ 2,400
11.13.2 Thru 2 3/8" OD US$ 22 US$ 10 US$ 2,700
11.13.3 Thru 2 7/8" OD US$ 22 US$ 10 US$ 3,000
11.13.4 Thru 3 1/2" OD US$ 22 US$ 10 US$ 3,600

11.14.0 Crossovers - Premium Connections


Slze Operating DAY Standby DAY LIH/DBR
Rate Rate
11.14.1 Thru 1 3/4" OD US$ 42 US$ 22 US$ 4,200
11.14.2 Thru 2 3/8" OD US$ 42 US$ 22 US$ 4,500
11.14.3 Thru 2 7/8" OD US$ 42 US$ 22 US$ 4,800
11.14.4 Thru 3 1/2" OD US$ 42 US$ 22 US$ 5,400

11.15.0 Weight/Extension Bar


Operating DAY Standby DAY LIH/DBR
Rate Rate
Thru 1 3/4" OD US$ 42 US$ 22 US$ 4,200
Thru 2 3/8" OD US$ 42 US$ 22 US$ 4,500
Thru 2 7/8" OD US$ 42 US$ 22 US$ 4,800
Thru 3 1/2" OD US$ 42 US$ 22 US$ 5,400

11.16.0 Weight Bar - Tungsten Filled


Operating DAY Standby DAY LIH/DBR
Rate Rate
Thru 1 3/4" OD US$ 420 US$ 64 US$ 17,700
Thru 2 3/8" OD US$ 526 US$ 84 US$ 18,900
Thru 2 7/8" OD US$ 632 US$ 94 US$ 21,000
Thru 3 1/2" OD US$ 842 US$ 106 US$ 22,200

11.17.0 Adjustable Back Pressure Valve


Operating DAY Standby DAY LIH/DBR
Rate Rate
Thru 1 3/4" OD US$ 632 US$ 126 US$ 13,800
Thru 2 3/8" OD US$ 736 US$ 158 US$ 15,000
Thru 2 7/8" OD US$ 842 US$ 190 US$ 16,500
Thru 3 1/2" OD US$ 946 US$ 210 US$ 18,300

Fishing and Remedial Page 49 2020


11.18.0 Annular Circulating Valve- Ball Activated

Operating DAY Standby DAY LIH/DBR


Rate Rate
Thru 1 3/4" OD US$ 252 US$ 106 US$ 9,300
Thru 2 3/8" OD US$ 316 US$ 126 US$ 10,800
Thru 2 7/8" OD US$ 400 US$ 158 US$ 12,300
Thru 3 1/2" OD US$ 526 US$ 178 US$ 14,400

11.19.0 Multi-Function Circulating Valve


Operating DAY Standby DAY LIH/DB
Rate Rate R
Thru 1 3/4" OD US$ 632 US$ 126 US$ 19,50
0
Thru 2 3/8" OD US$ 736 US$ 158 US$ 21,60
0
Thru 2 7/8" OD US$ 842 US$ 190 US$ 22,80
0
Thru 3 1/2" OD US$ 946 US$ 210 US$ 24,30
0

11.20.0 Multi-Function Circulating Valve - Flow Activated


Operating Rate DAY Standby DAY LIH/DBR
Rate
Thru 1 3/4" OD US$ 674 US$ 200 US$ 29,400
Thru 2 3/8" OD US$ 862 US$ 232 US$ 31,800
Thru 2 7/8" OD US$ 1,052 US$ 262 US$ 31.500
Thru 3 1/2" OD US$ 1,210 US$ 294 US$ 37,500

11.21.0 Choke Subs


Operating DAY Standby DAY LIH/DBR
Rate Rate
Thru 1 3/4" OD US$ 126 US$ 22 US$ 5,400
Thru 2 3/8" OD US$ 148 US$ 32 US$ 6,600
Thru 2 7/8" OD US$ 168 US$ 52 US$ 7,500
Thru 3 1/2" OD US$ 190 US$ 64 US$ 9,600

Fishing and Remedial Page 50 2020


11.22.0 Ported/Drain Subs
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.22.1 Thru 1 3/4" OD US$ 84 US$ 22 US$ 4,200
11.22.2 Thru 2 3/8" OD US$ 106 US$ 32 US$ 4,800
11.22.3 Thru 2 7/8" OD US$ 126 US$ 52 US$ 5,400
11.22.4 Thru 3 1/2" OD US$ 148 US$ 64 US$ 6,000

11.23.0 Spiral Jetting Bars - Drilled


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.23.1 Thru 1 3/4" OD US$ 42 US$ 22 US$ 4,200
11.23.2 Thru 2 3/8" OD US$ 52 US$ 22 US$ 4,500
11.23.3 Thru 2 7/8" OD US$ 64 US$ 32 US$ 4,800
11.23.4 Thru 3 1/2" OD US$ 74 US$ 32 US$ 5,400

11.24.0 Spiral Jetting Bars - Insert Nozzles


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.24.1 Thru 1 3/4" OD US$ 148 US$ 42 US$ 5,400
11.24.2 Thru 2 3/8" OD US$ 168 US$ 52 US$ 6,600
11.24.3 Thru 2 7/8" OD US$ 190 US$ 64 US$ 7,500
11.24.4 Thru 3 1/2" OD US$ 210 US$ 74 US$ 9,600

11.25.0 Jetting/Displacement Nobles - Drilled

Size Operating DAY Standby DAY LIH/DBR


Rate Rate
11.25.1 Thru 1 3/4" OD US$ 22 US$ 10 US$ 2,400
11.25.2 Thru 2 3/8" OD US$ 22 US$ 10 US$ 2,700
11.25.3 Thru 2 7/8" OD US$ 22 US$ 10 US$ 3,000
11.25.4 Thru 3 1/2" OD US$ 22 US$ 10 US$ 3,600
11.25.5 Thru 5 1/2" OD US$ 42 US$ 22 US$ 4,800

11.25.0 Jetting/Displacement Nobles - Insert Nobles


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.25.1 Thru 1 3/4" OD US$ 64 US$ 22 US$ 3,000
11.25.2 Thru 2 3/8" OD US$ 74 US$ 32 US$ 3,300
11.25.3 Thru 2 7/8" OD US$ 84 US$ 42 US$ 3,600
11.25.4 Thru 3 1/2" OD US$ 94 US$ 52 US$ 4,200
11.25.5 Thru 5 1/2" OD US$ 106 US$ 64 US$ 8,400

Fishing and Remedial Page 51 2020


11.26.0 Combination Nozzle - Jetting/Reverse Circulation

Size Operating DAY Standby DAY LIH/DBR


Rate Rate
11.26.1 Thru 2 7/8" OD US$ 168 US$ 52 US$ 7,200
11.26.2 Thru 4 1/2" OD US$ 190 US$ 64 US$ 9,600
11.26.3 Thru 6 1/2" OD US$ 210 US$ 74 US$ 10,800
11.27.0 Rotary Jetting Tools
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.27.1 Thru 1 3/4" OD US$ 632 US$ 136 US$ 15,600
11.27.2 Thru 2 3/8" OD US$ 736 US$ 158 US$ 18,600
11.27.3 Thru 2 7/8" OD US$ 842 US$ 178 US$ 20,400
11.27.4 Thru 3 1/2" OD US$ 946 US$ 200 US$ 22,200
11.28.0 Tubing End/Nipple Locator - Mechanical
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.28.1 Thru 2 3/8" OD US$ 504 US$ 126 US$ 26,100
11.28.2 Thru 2 7/8" OD US$ 590 US$ 136 US$ 27,600
11.28.3 Thru 3 1/2" OD US$ 652 US$ 178 US$ 31,200
11.28.4 Thru 4 1/2" OD US$ 736 US$ 210 US$ 36,600
11.28.5 Thru 5 1/2" OD US$ 820 US$ 232 US$ 38,700
11.29.0 Tubing End/Nipple Locator - Hydro-Mechanical
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.29.1 Thru 2 3/8" OD US$ 590 US$ 168 US$ 33,600
11.29.2 Thru 2 7/8" OD US$ 674 US$ 190 US$ 34,500
11.29.3 Thru 3 1/2" OD US$ 758 US$ 210 US$ 38,400
11.29.4 Thru 4 1/2" OD US$ 842 US$ 232 US$ 42,300
11.29.5 Thru 5 1/2" OD US$ 926 US$ 252 US$ 45,000
11.30.0 Knuckle Joint - Full Rotation Sealed
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.30.1 Thru 1 3/4" OD US$ 126 US$ 64 US$ 11,100
11.30.2 Thru 2 3/8" OD US$ 148 US$ 74 US$ 12,900
11.30.3 Thru 2 7/8" OD US$ 168 US$ 84 US$ 14,700
11.30.4 Thru 3 1/2" OD US$ 190 US$ 94 US$ 16,200

11.31.0 Knuckle Joints - Torque Thru Sealed


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.31.1 Thru 1 3/4" OD US$ 190 US$ 84 US$ 12,000
11.31.2 Thru 2 3/8" OD US$ 210 US$ 106 US$ 13,800

Fishing and Remedial Page 52 2020


11.31.3 Thru 2 7/8" OD US$ 252 US$ 126 US$ 15,300
11.31.4 Thru 3 1/2" OD US$ 294 US$ 148 US$ 17,100
11.32.0 Knuckle Joints - Double Torque Thru Sealed
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.32.1 Thru 1 3/4" OD US$ 210 US$ 106 US$ 12,900
11.32.2 Thru 2 3/8" OD US$ 252 US$ 126 US$ 14,700
11.32.3 Thru 2 7/8" OD US$ 294 US$ 148 US$ 16,800
11.32.4 Thru 3 1/2" OD US$ 336 US$ 168 US$ 18,300
11.33.0 Knuckle Joints - Hydraulic Kickover
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
II 31 | Ihru 1 3 4" OD US$ 946 US$ 210 US$ 30,300
II 34 2 1 hin 2 3 8" OD US$ 1,158 US$ 232 US$ 31,200
11,343 Hun 2 ' 8" OD US$ 1,368 US$ 252 US$ 31,950
11,344 Him 3 1 2" OD US$ 1,578 US$ 274 US$ 35,400

11,350 Indexing Tool - Hydraulic


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.35 .1 Thru 1 3/4" OD US$ 1,472 US$ 210 US$ 54,600
11.35.2 Thru 2 3/8" OD US$ 1,684 US$ 232 US$ 58,500
11.35.3 Thru 2 7/8" OD US$ 1,894 US$ 252 US$ 63,000
11.35.4 Thru 3 5/8" OD US$ 2,104 US$ 274 US$ 70,500

11.36.0 Stabilizers - Fluted/Bladed

Size Operating DAY Standby DAY LIH/DBR


Rate Rate
11.36.1 Thru 1 3/4" OD US$ 168 US$ 42 US$ 4,800
11.36.2 Thru 2 3/8" OD US$ 190 US$ 52 US$ 5,400
11.36.3 Thru 2 7/8" OD US$ 210 US$ 64 US$ 6,300
11.36.4 Thru 3 1/2" OD US$ 232 US$ 74 US$ 6,900
11.36.5 Thru 5 1/2" OD US$ 252 US$ 84 US$ 7,800
11.37.0 Stabilizers - Sleeve/Non-Rotating
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.37.1 Thru 1 3/4" OD Mandrel w/ One US$ 294 US$ 64 US$ 11,400
Sleeve
11.37.2 Thru 2 3/8" OD Mandrel w/ One US$ 336 US$ 84 US$ 12,300
Sleeve
11.37.3 Thru 2 7/8" OD Mandrel w/ One US$ 378 US$ 106 US$ 13,500
Sleeve

Fishing and Remedial Page 53 2020


11.37.4 Thru 3 1/2" OD Mandrel w/ One US$ 420 US$ 126 US$ 14,400
Sleeve
11.37.5 Additional Stabiliser Sleeves US$ 22 US$ 22 US$ 5,400

11.38.0 Bow Spring Centralizers - Mechanical


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.38.1 Thru 1 3/4" OD US$ 442 US$ 106 US$ 12,600
11.38.2 Thru 2 3/8" OD US$ 504 US$ 126 US$ 13.800
11.38.3 Thru 2 7/8" OD US$ 590 US$ 148 US$ 14,700
11.38.4 Thru 3 1/2" OD US$ 652 US$ 168 US$ 15,600
11.39.0 Bow Soring Centralizers - Hydraulic
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.39.1 Thru 1 3/4" OD US$ 568 US$ 136 US$ 16,500
11.39.2 Thru 2 3/8" OD US$ 610 US$ 158 US$ 18,300
11.39.3 Thru 2 7/8" OD US$ 652 US$ 178 US$ 20,400
11.39.4 Thru 3 Vn” OD US$ 694 US$ 200 US$ 23,700
11.40.0 Oil Jars - Fishing (Up Only)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.40.1 Thru 1 13/16" OD US$ 2,020 US$ 190 US$ 57,600
11.40.2 Thru 2 1/4" OD US$ 2,252 US$ 210 US$ 63,000
11.40.3 Thru 3 1/8" OD US$ 2,482 US$ 232 US$ 69,000
11.40.4 Thru 4 3/4" OD US$ 2,736 US$ 252 US$ 81,000
11.41.0 Gas Accelerators - Fishing (Up Only)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.41.1 Thru 1 13/16" OD US$ 2,020 US$ 190 US$ 55,500
11.41.2 Thru 2 1/4" OD US$ 2,252 US$ 210 US$ 61,200
11.41.3 Thru 3 1/8" OD US$ 2,482 US$ 232 US$ 67,800
11.41.4 Thru 4 3/4" OD US$ 2,736 US$ 252 US$ 79,200
11.42.0 Oil Jars - Dual Acting
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.42.1 Thru 1 11/16" OD US$ 2,482 US$ 210 US$ 70,500
11.42.2 Thru 2 1/16" OD US$ 2,736 US$ 232 US$ 78,900
11.42.3 Thru 2 7/8" OD US$ 2,946 US$ 252 US$ 81,600
11.43.0 Accelerators - Dual Acting
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.43.1 Thru 1 11/16" OD US$ 2,482 US$ 210 US$ 67,500
11.43.2 Thru 2 1/16" OD US$ 2,736 US$ 232 US$ 75,600

Fishing and Remedial Page 54 2020


11.43.3 Thru 2 7/8" OD US$ 2,946 US$ 252 US$ 79,500
11.44.0 Mechanical Jars - Dual Acting
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.44.1 Thru 1 13/16" OD US$ 904 US$ 94 US$ 43,200
11.44.2 Thru 2 1/4" OD US$ 1,030 US$ 106 US$ 49,500
11.44.2 Thru 2 7/8" OD US$ 1,146 US$ 116 US$ 52,500
11.44.2 Thru 3 1/8" OD US$ 1,262 US$ 126 US$ 54,300

11.45.0 Impact Tool - Single Acting Impact Hammers


Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.45.1 Single Acting - Down (Thru 1 3/4" OD) US$ 2,252 US$ 190 US$ 49,500
11.45.2 Single Acting - Down (Thru 2 3/8" OD) US$ 2,482 US$ 210 US$ 52,500
11.45.3 Single Acting - Down (Thru 3 1/2" OD) US$ 2,736 US$ 232 US$ 54,300

11.45.0 Impact Tool - Single Acting Impact Hammer Accelerator

Size Operating DAY Standby DAY LIH/DB


Rate Rate R
11.45.1 Single Acting - Up (Thru 1 3/4" OD) US$ 2,252 US$ 190 US$ 49,500
11.45.2 Single Acting - Up (Thru 2 3/8" OD) US$ 2,482 US$ 210 US$ 52,500
11.45.3 Single Acting - Up (Thru 3 1/8" OD) US$ 2,736 US$ 232 US$ 54,300
11.46.0 Impact Tool - Dual Acting Impact Hammers
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.46.1 Bi-Directional (Thru 1 3/4" OD) US$ 2,482 US$ 210 US$ 55,500
11.46.2 Bi-Directional (Thru 2 3/8" OD) US$ 2,736 US$ 232 US$ 59,400
11.46.3 Bi-Directional (Thru 3 1/8" OD) US$ 2,946 US$ 252 US$ 63,300
11.47.0 Impact Tool - Dual Acting Impact Hammer Accelerator
Sto Operating DAY Standby DAY LIH/DB
Rate Rate R
11.47.1 Bi-Directional (Thru 1 3/4" OD) US$ 1,894 US$ 190 US$ 48,000
11.47.2 Bi-Directional (Thru 2 3/8" OD) US$ 2,104 US$ 210 US$ 50,700
11.47.3 Bi-Directional (Thru 3 1/8" OD) US$ 2,314 US$ 232 US$ 56,100
11.48.0 Bumper Subs - Fishing
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.48.1 Thru 1 13/16" OD US$ 358 US$ 22 US$ 15,159
11.48.2 Thru 2 1/4" OD US$ 378 US$ 32 US$ 15,810
11.48.3 Thru 3 5/32" OD US$ 400 US$ 42 US$ 17,070

Fishing and Remedial Page 55 2020


11.49.0 Bumper Subs - Lubricated
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.49.1 Thru 1 13/16" OD US$ 1,072 US$ 106 US$ 26,835
11.49.2 Thru 2 1/4" OD US$ 1,284 US$ 126 US$ 43,623
11.49.3 Thru 3 1/8" OD US$ 1,494 US$ 148 US$ 51,414
11.50.0 Down Hole Motors - Standard Workover
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.50.1 Thru 1 11/16" OD US$ 4,312 US$ 168 US$ 58,500
11.50.2 Thru 2 1/8" OD US$ 4,524 US$ 190 US$ 70,500
11.50.3 Thru 2 3/8" OD US$ 4,734 US$ 210 US$ 76,500
11.50.4 Thru 2 7/8" OD US$ 4,966 US$ 232 US$ 82,500
11.50.5 Thru 3 3/8" OD US$ 5,218 US$ 252 US$ 94,500
11.51.0 Down Hole Motors - High Performance
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.51.1 Thru 1 11/16" OD US$ 4,734 US$ 210 US$ 76,500
11.51.2 Thru 2 1/8" OD US$ 4,966 US$ 232 US$ 88,500
11.51.3 Thru 2 3/8" OD US$ 5,218 US$ 252 US$ 91,500
11.51.4 Thru 2 7/8" OD US$ 5,450 US$ 274 US$ 100,500
11.51.5 Thru 3 3/8" OD US$ 5,680 US$ 294 US$ 116,400
11.52.0 Down Hole Motors - High Temperature
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.52.1 Thru 1 11/16" OD US$ 4,734 US$ 210 US$ 76,500
11.52.2 Thru 2 1/8" OD US$ 4,966 US$ 232 US$ 88,500
11.52.3 Thru 2 3/8" OD US$ 5,218 US$ 252 US$ 91,500
11.52.4 Thru 2 7/8" OD US$ 5,450 US$ 274 US$ 100,500
11.52.5 Thru 3 3/8" OD US$ 5,680 US$ 294 US$ 116,400
11.53.0 Down Hole Motors - Slow Speed
Operating DAY Standby DAY LIH/DB
Rate Rate R
11.53.1 Thru 1 11/16" OD US$ 4,734 US$ 210 US$ 76,500
11.53.2 Thru 2 1/8" OD US$ 4,966 US$ 232 US$ 88,500
11.53.3 Thru 2 3/8" OD US$ 5,218 US$ 252 US$ 91,500
11.53.4 Thru 2 7/8" OD US$ 5,450 US$ 274 US$ 100,500
11.53.5 Thru 3 3/8" OD US$ 5,680 US$ 294 US$ 116,400
11.54.0 Down Hole Motors - Whipstock Applications

Size Operating DAY Standby DAY LIH/DB


Rate Rate R
11.54.1 Thru 1 11/16" OD US$ 5,218 US$ 232 US$ 82,500
11.54.2 Thru 2 1/8" OD US$ 5,450 US$ 252 US$ 90,000

Fishing and Remedial Page 56 2020


11.54.3 Thru 2 3/8" OD US$ 5,680 US$ 274 US$ 100,500
11.54.4 Thru 2 7/8" OD US$ 5,912 US$ 294 US$ 108,000
11.54.5 Thru 3 3/8" OD US$ 6,144 US$ 316 US$ 118,500
11.55.0 Underreamer - Crushed Carbide Dressed Blades
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.55.1 Thru 1 3/4" OD US$ 3,786 US$ 252 US$ 48,600
11.55.2 Thru 2 3/8" OD US$ 4,628 US$ 274 US$ 51,300
11.55.3 Thru 2 7/8" OD US$ 5,890 US$ 294 US$ 60,900
11.55.4 Thru 3 1/2" OD US$ 6,732 US$ 316 US$ 73,200
11.56.0 Underreamer - Insert Dressed Blades
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.56.1 Thru 1 3/4" OD US$ 4,208 US$ 274 US$ 48,600
11.56.2 Thru 2 3/8" OD US$ 5,050 US$ 294 US$ 51,300
11.56.3 Thru 2 7/8" OD US$ 6,312 US$ 316 US$ 60,900
11.56.4 Thru 3 1/2" OD US$ 7,154 US$ 336 US$ 73,200
11.57.0 Underreamer - Diamond Dressed Blades
Operating DAY Standby DAY LIH/DB
Rate Rate R
11.57.1 Thru 1 3/4" OD US$ 5,050 US$ 336 US$ 54,600
11.57.2 Thru 2 3/8" OD US$ 5,890 US$ 358 US$ 57,300
11.57.3 Thru 2 7/8" OD US$ 7,154 US$ 378 US$ 66,900
11.58.4 Thru 3 1/2" OD US$ 7,994 US$ 400 US$ 79,200
11.59.0 Underreamer - As High Expansion Anchor
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.59.1 Thru 1 3/4" OD US$ 2,524 US$ 252 US$ 48,600
11.59.2 Thru 2 3/8" OD US$ 2,946 US$ 274 US$ 51,300
11.59.3 Thru 2 7/8" OD US$ 3,366 US$ 294 US$ 60,900
11.59.4 Thru 3 1/2" OD US$ 3,786 US$ 316 US$ 73,200

11.60.0 Underreamer As High Expansion Centralizer


Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.60.1 Thru 1 3/4" OD US$ 2,524 US$ 252 US$ 48,600
11.60.2 Thru 2 3/8" OD US$ 2,946 US$ 274 US$ 51,300
11.60.3 Thru 2 7/8" OD US$ 3,366 US$ 294 US$ 60,900
11.60.4 Thru 3 1/2" OD US$ 3,786 US$ 316 US$ 73,200
11.61.0 Tungsten Carbide - Flat, Concave, Round Nose, Junk Mills
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.61.1 Price per inch on largest OD US$ 1,262 US$ 32 US$ 5,400
11.62.0

Fishing and Remedial Page 57 2020


Tungsten Carbide - Blade, Tapered, Pilot, Water Melon, Skirted, Junk Mills
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.62.1 Price per inch on largest OD on tool US$ 1,262 US$ 32 US$ 5,400
11.63.0 Insert Dressed - Stage Mills
Size
Operating DAY Standby DAY LIH/DB
Rate Rate R
11.63.1 Price per inch on largest OD US$ 1,472 US$ 42 US$ 8,400
11.64.0 Insert Dressed - “T” Series
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.64.1 Price per inch on largest OD on tool US$ 1,472 US$ 42 US$ 7,200

11.65.0 “Diamond Enhanced Carbide” Dressed - Stage Mills


Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.65.1 Price per inch on largest OD on tool US$ 2,736 US$ 84 US$ 11,400
11.66.0 “Diamond Enhanced Carbide” Dressed - “T” Series
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.66.1 Price per inch on lareest OD on tool US$ 2,314 US$ 74 US$ 9,600
11.67.0 Diamond Dressed - Parabolic, Speed, Concave, Round Nose, Junk Mills
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.67.1 Price per inch on largest OD US$ 1,788 US$ 64 US$ 8,400

11.68.0 Shoes - Tungsten Carbide Dressed, Hollow Mill


Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.68.1 Price per inch on largest OD US$ 1,262 US$ 32 US$ 5,400
11.68.2 With insert junk catcher US$ 1,472 US$ 42 US$ 6,300
11.69.0 Shoes - Insert Dressed
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.69.1 Price per inch on largest OD US$ 1,472 US$ 42 US$ 7,200
11.69.2 With insert junk catcher US$ 1,684 US$ 52 US$ 8,100
11.70.0 Shoes - “Diamond Enhanced Carbide” Dressed
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.70.1 Price per inch on largest OD US$ 2,314 US$ 64 US$ 9,600
11.70.2 With insert junk catcher US$ 2,524 US$ 74 US$ 10,800
11.71.0 Shoes - Diamond Dressed
Size Operating DAY Standby DAY LIH/DB
Rate Rate R

Fishing and Remedial Page 58 2020


11.71.2 Price per inch on largest OD US$ 1,788 US$ 52 US$ 8,400
11.71.2 With insert junk catcher US$ 1,998 US$ 64 US$ 9,000
11.72.0 Dressed Guides
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.72.1 Price per inch on largest OD US$ 1,158 US$ 32 US$ 5,400
11.73.0 Washpipe
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.73.1 Thru 2 7/8" OD, per ft US$ 26 US$ 12 US$ 600
11.73.2 Thru 3 3/4" OD, per ft US$ 34 US$ 16 US$ 720
11.73.3 Thru 5" OD, per ft US$ 42 US$ 22 US$ 810
11.74.0 Shoes - Venturi Jet Junk Basket
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.74.1 Price per inch on largest OD US$ 1,262 US$ 32 US$ 5,400
11.74.2 With insert junk catcher US$ 1,472 US$ 42 US$ 6,300
11.75.0 Hydraulic Cutter
Size Operating DAY Standby DAY LIH/DB
Rate Rate R
11.75.1 Thru 1 3/4" OD - 4" Knife Sweep US$ 2,736 US$ 190 US$ 40,500
11.75.2 Thru 2 1/4" OD - 4 1/2" Knife Sweep US$ 2,946 US$ 210 US$ 44,100
11.75.3 Thru 2 1/2" OD - 5 1/2" Knife Sweep US$ 3,156 US$ 232 US$ 46,500
11.75.4 Thru 2 5/8" OD - 6 1/8" Knife Sweep US$ 3,366 US$ 252 US$ 49,800
11.75.5 Thru 2 7/8" OD - 7" Knife Sweep US$ 3,576 US$ 274 US$ 52,200
11.75.6 Thru 3 1/8" OD - 7 1/2" Knife Sweep US$ 3,786 US$ 294 US$ 58,200

11.76.0 Hydraulic Anchor Sub

Size Operating DAY Standby DAY LIH/DBR


Rate Rate
11.76.1 Thru 2 1/2" OD Opens to 3" US$ 946 US$ 168 US$ 22,500
11.76.2 Thru 3" OD Opens to 3 1/2" US$ 1,158 US$ 210 US$ 25,200
11.76.3 Thru 3 1/2" OD Opens to 4 1/2" US$ 1,578 US$ 252 US$ 27,600
11.77.0 Underreamer - As High Expansion Anchor
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.77.1 Thru 1 3/4" OD US$ 2,524 US$ 252 US$ 48,600
11.77.2 Thru 2 3/8" OD US$ 2,946 US$ 274 US$ 51,300

Fishing and Remedial Page 59 2020


11.77.3 Thru 2 7/8" OD US$ 3,366 US$ 294 US$ 60,900
11.77.4 Thru 3 1/2" OD US$ 3,786 US$ 316 US$ 73,200
11.78.0 Underreamer - As High Expansion Centralizer
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.78.1 Thru 1 3/4" OD US$ 2,524 US$ 252 US$ 48,600
11.78.2 Thru 2 3/8" OD US$ 2,946 US$ 274 US$ 51,300
11.78.3 Thru 2 7/8" OD US$ 3,366 US$ 294 US$ 60,900
11.78.4 Thru 3 1/2" OD US$ 3,786 US$ 316 US$ 73,200
11.79.0 Bleed-Off Sub
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.79.1 Thru 1 3/4" OD US$ 526 US$ 116 US$ 19,500
11.79.2 Thru 2 3/8" OD US$ 632 US$ 136 US$ 21,600
11.79.3 Thru 2 7/8" OD US$ 736 US$ 158 US$ 22,800
11.79.4 Thru 3 1/2" OD US$ 842 US$ 178 US$ 24,300
11.80.0 Swivel Subs
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.80.1 Thru 1 3/4" OD US$ 368 US$ 94 US$ 11,400
11.80.2 Thru 2 3/8" OD US$ 420 US$ 116 US$ 12,600
11.80.3 Thru 2 7/8" OD US$ 526 US$ 136 US$ 13,800
11.80.4 Thru 3 1/2" OD US$ 632 US$ 158 US$ 15,300
11.81.0 Cut Compensator
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.81.1 Thru 1 3/4" OD US$ 526 US$ 116 US$ 15,750
11.81.2 Thru 2 3/8" OD US$ 632 US$ 136 US$ 17,700
11.81.3 Thru 2 7/8" OD US$ 736 US$ 158 US$ 19,800
11.81.4 Thru 3 1/2" OD US$ 842 US$ 178 US$ 21,900
11.82.0 Accessories - No Go, Bullnose, Profile Subs
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.82.1 Thru 1 3/4" OD US$ 42 US$ 22 US$ 3,600
11.82.2 Thru 2 3/8" OD US$ 42 US$ 22 US$ 4,200
11.82.3 Thru 2 7/8" OD US$ 52 US$ 32 US$ 4,800
11.82.4 Thru 3 1/2" OD US$ 64 US$ 32 US$ 5,400

11.83.0 Junk/Boot Basket

Size Operating DAY Standby DAY LIH/DBR


Rate Rate
11.83.1 Thru 2 3/8" OD US$ 64 US$ 22 US$ 8,400
11.83.2 Thru 3 3/4" OD US$ 94 US$ 32 US$ 10,800

Fishing and Remedial Page 60 2020


11.84.0 Venturi Jet Junk Basket
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.84.1 Thru 1 3/4" OD w/ One Extension US$ 842 US$ 136 US$ 28,200
11.84.2 Thru 2 3/8" OD w/ One Extension US$ 946 US$ 158 US$ 32,400
11.84.3 Thru 2 7/8" OD w/ One Extension US$ 1,052 US$ 178 US$ 34,500
11.84.4 Thru 3 5/8" OD w/ One Extension US$ 1,158 US$ 200 US$ 38,700
11.84.5 Additional Latch Sub US$ 168 US$ 42 US$ 9,600
11.85.0 Venturi Jet Junk Basket - Extension
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.85.1 Thru 1 3/4" OD US$ 126 US$ 64 US$ 10,200
11.85.2 Thru 2 3/8" OD US$ 126 US$ 64 US$ 11,400
11.85.3 Thru 2 7/8" OD US$ 126 US$ 64 US$ 11,700
11.85.4 Thru 3 5/8" OD US$ 168 US$ 84 US$ 12,600

11.86.0 Venturi Jet Junk Basket - Carbide Dressed Shoes


Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.86.1 Price per inch on largest OD US$ 316 US$ 32 US$ 5,400
11.86.2 With Insert Junk Catcher US$ 368 US$ 42 US$ 6,300
11.87.0 Big Bore Finger Catcher Subs
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.87.1 Thru 5 1/2” OD US$ 736 US$ 84 US$ 19,500
11.88.0 Venturi Jet Junk Basket Big Bore Pulling Tools - Internal/External Type
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.88.1 Thru 3 5/8” OD US$ 526 US$ 190 US$ 24,900
11.89.0 Hydrostatic/Turbo Bailers
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.89.1 Thru 1 3/4" OD US$ 946 US$ 252 US$ 34,200
11.89.2 Thru 2 3/8" OD US$ 1,158 US$ 274 US$ 42,300
11.89.3 Thru 3 3/4" OD US$ 1,368 US$ 294 US$ 47,700
11.90.0 Magnetic Chip Catcher Subs
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.90.1 Thru 1 3/4" OD US$ 336 US$ 52 US$ 13,200
11.90.2 Thru 2 3/8" OD US$ 400 US$ 74 US$ 14,400
11.90.3 Thru 2 7/8" OD US$ 462 US$ 94 US$ 16,200
11.90.4 Thru 3 1/2" OD US$ 526 US$ 116 US$ 17,400

Fishing and Remedial Page 61 2020


11.91.0 Overshots - Bowen Series (Inclusive of One Grapple Set)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.91.1 Thru 2 7/8" OD, Series 10 US$ 832 US$ 32 US$ 8,400
11.91.2 Thru 3 1/4" OD, Series 20 US$ 918 US$ 42 US$ 11,400
11.91.3 Thru 5 1/2" OD, Series 150 US$ 1,062 US$ 64 US$ 14,400
11.91.4 Thru 5 1/2" OD, Series 70 US$ 1,170 US$ 106 US$ 15,300
11.91.5 Overshot Extension US$ 168 US$ 32 US$ 7,500
11.91.6 Additi o nal grapple US$ 22 US$ 10 US$ 2,679
11.92.0 Overshots - Kelo, Mouse Trap, Dos Type, Socket, C-Tvpe (Inclusive of One Grapple Set)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
II 92 1 Ihru 2 3 8" OD US$ 1,262 US$ 126 US$ 23,100
II 92 2 Him 3 3 8" OD US$ 1,368 US$ 136 US$ 25,800
11,923 Him 4 3 4" OD US$ 1,472 US$ 148 US$ 28,500
11,921 Him 6 1 8" OD US$ 1,578 US$ 158 US$ 30,600
11,925 Overshot Extension US$ 168 US$ 84 US$ 12,600
11.93.0 Overshots - Continuous (Inclusive of One Grapple Set)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.93.1 Thru 2 3/8" OD US$ 1,526 US$ 106 US$ 21,600
11.93.2 Thru 3 3/8" OD US$ 1,630 US$ 126 US$ 24,300
11.93.3 Thru 4 3/4" OD US$ 1,736 US$ 148 US$ 28,500
11.93.4 Overshot Extension US$ 168 US$ 84 US$ 12,600
11.94.0 Overshots - High Pressure Packoffs
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.94.1 Thru 2 3/8" OD US$ 788 US$ 84 US$ 13,500
11.94.2 Thru 3 5/8" OD US$ 946 US$ 106 US$ 18,300
11.94.3 Thru 4 3/4" OD US$ 1,104 US$ 126 US$ 21,900
11.95.0 Overshot Guides - Hook Wall, Special
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.95.1 Thru 2 3/8" OD US$ 210 US$ 42 US$ 9,000
11.95.2 Thru 3 3/8" OD US$ 316 US$ 52 US$ 10,500
11.95.3 Thru 4 3/4" OD US$ 420 US$ 64 US$ 13,500
11.96.0 Dressed Guides
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.96.1 Price per inch on largest OD US$ 316 US$ 32 US$ 5,400
11.97.0 Overshots - Hydraulic Release Pulling Tool for External Fishneck (Inc. of One Grapple Set)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.97.1 Thru 1 3/4" OD: 0.875" to 1.00" EFN US$ 1,578 US$ 106 US$ 14,400
11.97.2 Thru 2 3/8" OD: 0.875" to 1.375" EFN US$ 1,936 US$ 116 US$ 16,200
11.97.3 Thru 2 3/4" OD: 0.875" to 1.75" EFN US$ 2,230 US$ 136 US$ 17,700

Fishing and Remedial Page 62 2020


11.97.4 Thru 4 1/8" OD: 0.875" to 3.125" EFN US$ 2,566 US$ 178 US$ 20,400
11.98.0 Overshots - Hydraulic Release for Slick OD (Inclusive of One Grapple Set)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.98.1 Thru 2 3/8" OD US$ 1,936 US$ 116 US$ 16,200
11.98.2 Thru 2 7/8" OD US$ 2,230 US$ 136 US$ 17,700
11.98.3 Thru 4 1/8" OD US$ 2,566 US$ 178 US$ 20,400
11.98.4 Thru 5 1/2” OD US$ 2,692 US$ 210 US$ 22,800

11.99.0 Overshots - Coiled Tubing Cutting (Inclusive of One Grapple Set)

Size Operating DAY Standby DAY LIH/DBR


Rate Rate
11.99.1 Thru 2 3/8" OD US$ 2,630 US$ 148 US$ 26,700
11.99.2 Thru 3 7/8" OD US$ 3,262 US$ 190 US$ 34,500
11.100.0 Overshots - Box Tap
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.100.1 US$ 168 US$ 32 US$ 4,800
Per OD
inch
11.101.0 Spears - Bowen Itco (Inclusive of One Grapple Set)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.101.1 Thru 1.81” OD US$ 896 US$ 22 US$ 6,600
11.101.2 Thru 2.5" OD US$ 1,630 US$ 32 US$ 10,200
11.101.3 Thru 3.13" OD US$ 1,748 US$ 42 US$ 11,400
11.102.0 Spears - Mechanical Release - GS Style (Inclusive of One Grapple Set)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.102.1 Thru 2" GS Fishneck US$ 820 US$ 42 US$ 10,800
11.102.2 Thru 3" GS Fishneck US$ 1,072 US$ 52 US$ 12,300
11.102.3 Thru 4" GS Fishneck US$ 1,514 US$ 64 US$ 13,800
11.102.4 Thru 5" GS Fishneck US$ 1,598 US$ 74 US$ 14,700
11.102.5 Thru 7" GS Fishneck US$ 1,894 US$ 84 US$ 16,200
11.103.0 Spears - Hydraulic Release Slick Catch (Inclusive of One Grapple Set)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.103.1 Thru 1.25" OD: Range: 0.925" to 1.00" US$ 1,556 US$ 106 US$ 12,900
11.103.2 Thru 2 " OD: Range: 1.362" to 1.677" US$ 1,810 US$ 116 US$ 14,400
11.103.3 Thru 3" OD: Range: 1.895" to 2.437" US$ 2,062 US$ 126 US$ 16,200
11.103.4 Thru 4.125" OD: Range: 2.67" to 3.50" US$ 2,252 US$ 136 US$ 18,600
11.103.5 Thru 5" OD: Ranee: 3.67" to 4.50" US$ 2,546 US$ 148 US$ 21,300

Fishing and Remedial Page 63 2020


11.104.0 Spears - Hydraulic Release GS Style (Inclusive of One Grapple Set)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.104.1 Thru 2" GS Fishneck US$ 1,514 US$ 116 US$ 13,800
11.104.2 Thru 3" GS Fishneck US$ 1,788 US$ 126 US$ 16,200
11.104.3 Thru 4" GS Fishneck US$ 2,062 US$ 136 US$ 18,300
11.104.4 Thru 5" GS Fishneck US$ 2,252 US$ 158 US$ 20,400
11.104.5 Thru 7" GS Fishneck US$ 2,630 US$ 190 US$ 23,700
11.105.0 Spears - Hydraulic Release Disconnect Retrieval Tool (Inclusive of One Grapple Set)
Size Operating DAY Standby DAY LIH/DBR
Rate Rate
11.105.1 Thru 1 3/4" OD US$ 1,514 US$ 116 US$ 15,300
11.105.2 Thru 2 3/8" OD US$ 1,788 US$ 126 US$ 17,700
11.105.3 Thru 2 7/8" OD US$ 2,062 US$ 136 US$ 18,900
11.105.4 Thru 3 1/2” OD US$ 2,104 US$ 158 US$ 20,400
11.106.0 Taps – Taper
Size
Operating DAY Standby DAY LIH/DBR
Rate Rate
11.106.1 Per inch of largest OD US$ 148 US$ 22 US$ 4,800
11.106.0 Spears - Wireline - Internal, External, Multi-Prong, Corkscrew
Size
Operating DAY Standby DAY LIH/DBR
Rate Rate
11.106.1 Thru 1 3/4" OD US$ 368 US$ 52 US$ 9,600
11.106.2 Thru 2 3/8" OD US$ 420 US$ 64 US$ 10,800
11.106.3 Thru 2 7/8" OD US$ 474 US$ 74 US$ 11,700
11.106.4 Thru 3 1/2” OD US$ 526 US$ 84 US$ 12,300

11.107.0 Hydraulic Pushing/Pulling Tool

Size Operating day Standby day LIH/DBR


Rate Rate
11.107.1 For 2 7/8" Tubing US$ 3,044 US$ 2,524 US$ 130,800
11.107.2 For 3 1/2" Tubing US$ 5,358 US$ 3,156 US$ 153,900
11.107.3 For 4 1/2" Tubing US$ 6,620 US$ 3,786 US$ 174,000

11.108.0 Hydraulic Shifting Tools


Size Operating day Standby day LIH/DBR
Rate Rate
11.108.1 Thru 2 3/8" Tubing US$ 548 US$ 126 US$ 14,700
11.108.2 Thru 2 7/8" Tubing US$ 632 US$ 148 US$ 16,800
11.108.3 Thru 3 1/2" Tubing US$ 674 US$ 168 US$ 17,700
11.108.4 Thru 4 1/2" Tubing US$ 716 US$ 190 US$ 19,200
11.108.5 Thru 5 1/2" Tubing US$ 758 US$ 210 US$ 20,700
11.109.0 Dual Hydraulic Shifting Tools
Size Operating day Standby day LIH/DBR
Rate Rate

Fishing and Remedial Page 64 2020


11.109.1 Thru 2 3/8" Tubing US$ 736 US$ 190 US$ 26,700
11.109.2 Thru 2 7/8" Tubing US$ 946 US$ 210 US$ 31,800
11.109.3 Thru 3 1/2" Tubing US$ 1,158 US$ 232 US$ <2.700
11.109.4 Thru 4 1/2" Tubing US$ 1,368 US$ 252 US$ '7.200
11.109.5 Thru 5 1/2" Tubing US$ 1,578 US$ 274 US$ 38,700
11.110.0 Lift Subs - Lift/Pressure Test
Size Operating day Standby day LIH/DBR
Rate Rate
11.110.1 Thru 1 3/4" Tubing US$ 22 US$ 22 US$ 7,200
11.110.2 Thru 2 3/8" Tubing US$ 22 US$ 22 US$ 7,200
11.110.3 Thru 2 7/8" Tubing US$ 22 US$ 22 US$ 7,200
11.110.4 Thru 3 1/2" Tubing US$ 22 US$ 22 US$ 7,200
11.111.0 Safety Clamps
Size Operating day Standby day LIH/DBR
Rate Rate
11.111.1 Thru 2 3/8" OD US$ 22 US$ 22 US$ 7,500
11.111.2 Thru 3 1/2" OD US$ 22 US$ 22 US$ 10,500
11.112.0 Test Subs - Pull/Pressure Test
Size Operating day Standby day LIH/DBR
Rate Rate
11.112.1 Thru 1 3/4" Tubing US$ 22 US$ 22 US$ 7,200
11.112.2 Thru 2 3/8" Tubing US$ 22 US$ 22 US$ 7,200
11.112.3 Thru 2 7/8" Tubing US$ 22 US$ 22 US$ 7,200
11.112.4 Thru 3 1/2" Tubing US$ 22 US$ 22 US$ 7,200
11.113.0 Landing Plates
Size Operating day Standby day LIH/DBR
Rate Rate
11.113.1 Thru 2 3/8" OD US$ 10 US$ 10 US$ 4,500
11.113.2 Thru 4" OD US$ 10 US$ 10 US$ 4,500
11.114.0 Tong Units
Size Operating day Standby day LIH/DBR
Rate Rate
11.114.1 Portable TT tong unit US$ 232 US$ 232 US$ 103,500
11.114.2 Lightweight TT tong unit US$ 442 US$ 442 US$ 138,000

Fishing and Remedial Page 65 2020


SUPERVISOR

15.1.0 FISHING TOOL SUPERVISOR


per day
15.1.1 Fishing tool Supervisor US$ 2,500

Supervision time is calculated from, and including, the day our Service Supervisor leaves his assigned
base until, and including, the day he returns thereto. Part of a day will constitute a full day.

All expenses of our Service Supervisors incidental to travel and living from the time they leave their
assigned base until their return, are to be paid by the Customer.

Communication between client's worksite and supervisor's base will be provided free of charge by client

When company personnel are requested by the Customer to operate third party tools, or are engaged on
a consultancy basis, the charge will be US$ 3,750.00

15.2.0 THIRD PARTY INSPECTION CHARGES

As per current price list made by third party.

15.3.0 BODY INSPECTION PER HOUR

As per current price list made by third party.

15.4.0 REPAIR CHARGES

Major components which are Damaged Beyond Repair are

charged to Customer account as per DOCUMENTED COST PLUS 10%.

15.5.0 THREAD REPAIR

As per current price list made by third party.

per day plus all expenses incurred.

Fishing and Remedial Page 66 2020


15.6.0 MILEAGE AND TRANSPORT

All costs of transporting supervisor, tools and equipment to and from the location will be charged to the

Customer account.
per mile
15.6.1 Personnel Car US$ 4
15.6.2 Truck US$ 6

Transport made by Third Party - Carrier's Invoice plus 10%

15.7.0 SLINGS
Sale of slings Each
US$ 70

15.8.0 INSPECTION
All tools are inspected prior to entering the Company's stock. Therefore, upon return of company equipment, inspection is
to Customer's account.

15.9.0 CONNECTIONS
Making and Breaking of connections

15.10.0 First Connection on an assembly PER CONNECTION


US$ 180
US$ 60
15.11.0 Additional Connections on same assembly US$

Fishing and Remedial Page 67 2020


Fishing and Remedial Page 68 2020
Fishing and Remedial Page 69 2020
Fishing and Remedial Page 70 2020
Fishing and Remedial Page 71 2020
Fishing and Remedial Page 72 2020
Fishing and Remedial Page 73 2020