LOM PANGAR PIPELINE MODIFICATION

WEEKLY HIGHLIGHTS
WEEK 19, Ending: Friday 09 May 2014
This Week Next Week Needs/Areas of Concern

HSE HSE

 Waste collection, segregation and


transportation from the site
 Monitoring activities on the Right of
 Management walk through of the ROW
Way
 Waste collection, segregation and
 Cleaning camp, segregating, storage
storage within the camp site.
and transportation of wastes
 Inspection activities along the ROW and
 Inspection activities along the ROW and
within the camp
within the camp
 Issuing of PTW/JSA covering:
 Issuing of PTW/JSA covering:
 Electrical and Instrumentation
 Electrical and Instrumentation
activities at KP 481 and 509
activities at KP 481 and 509
 Tower Erection and
 Tower Erection and
installation of antenna at KP
installation of antenna at KP
509
509
 Civil works activities
 Civil works activities
 Demobilization of cabins at
 Demobilization of cabins at
the living area of the camp
the living area of the camp
site.
site.
 Induction HSE Training
 Induction HSE Training
 Defensive driving training
 Convoy safety rules induction

PROCUREMENT PROCUREMENT PROCUREMENT

abc abc abc

ENGINEERING ENGINEERING ENGINEERING

abc abc abc

QA/QC QA/QC QA/QC

abc abc abc

LOGISTIC LOGISTIC LOGISTIC

abc abc abc