Professional Documents
Culture Documents
DEPARTMENT OF TRANSPORTATION
WHEREAS, the DOTr-LTO, under R.A. No. 8749 (The Philippine Clean
Air Act), are likewise mandated to enforce the required emission standards
for motor vehicles.
2
1.12 Technical Working Group (TWG) - a group of DOTr-LTO personnel
with legal, technical and financial expertise, constituted by the
Authorization Committee to assist in the conduct of its functions.
B. A PMVIC shall have two (2) Light Vehicle (LV) lanes and two (2)
Motorcycle (MC) lanes with a total contiguous lot area of at least
One Thousand Five Hundred square meters (1,500 sq.m.).
Additional lanes may be authorized provided that they shall have a
corresponding area as may be determined by the Authorization
Committee.
3
1,500 sq. m. lot is not available, a smaller area of not less than 900
sq. m. with a separate parking lot or a multi-level parking may be
considered.
REGION 1 (9 sites)
Laoag City (Ilocos Norte) (1)
Vigan City (Ilocos Sur) (1)
Candon City (Ilocos Sur) (1)
Agoo (La Union) (1)
San Fernando City (La Union) (1)
Dagupan City (Pangasinan) (1)
Within Lingayen and Alaminos, Pangasinan
(1)
Within San Carlos and Urdaneta,
)
Pangasinan (1)
Within Rosales and San Nicolas,
Pangasinan (1)
REGION 2 (3 sites)
Tuguegarao City (Cagayan) (1)
Cauayan or Santiago City (Isabela) (1)
Bayombong, Nueva Vizcaya (1)
REGION 5 (5 sites)
Daet, Camarines Norte (1)
Pili, Camarines Sur (1)
Ligao, Albay (1)
Sorsogon City (Sorsogon) (1)
Pamplona, Camarines Sur (1)
REGION 6 (9 sites)
Bacolod City (Negros Occidental) (2)
Kabankalan City (Negros Occidental) (1)
Iloilo City (Iloilo) (2)
Roxas City (Capiz) (1)
Kalibo, Aldan (1)
Sari Jose, Antique (1)
Passi City (1)
REGION 8 (4 sites)
Tacloban City (Leyte) (1)
Ormoc City (Leyte) (1)
Maasin City (Southern Leyte) (1)
Calbayog City (Western Samar) (1)
REGION 9 (5 sites)
Zamboanga City Special Economic Zone,
ill
San Ramon, Zamboanga City (1)
Zamboanga City (1)
Pagadian City (Zamboanga del Sur) (1)
Dipolog City (Zamboanga del Norte) (1)
Ipil, Zamboanga Sibugay (1)
REGION 10 (6 sites)
Ozamis City (Misamis Occidental) (1)
Gingoog City (Misamis Oriental) (1)
Iligan City (Lanao del Norte) (1)
Malaybalay City (Bukidnon) (1)
Cagayan de Oro City (Cagayan de Oro) (1)
Mabajao, Camiguin Province (Camiguin) (1)
REGION 11 (8 sites)
Davao City (Davao) (2)
Tagum City (Davao del Norte) (1)
Panabo City (Davao del Norte) (1)
Malita, Davao Occidental (1)
Nabunturan, Compostela Valley (1)
Mati City (Davao Oriental) (1)
Digos City (Davao del Sur) (1)
REGION 12 (6 sites)
General Santos City (South Cotabato) (1)
Cotabato City (Cotabato) (1)
Koronadal City (South Cotabato) (1)
Kidapawan City (Cotabato) (1)
Tacurong City (Sultan Kudarat) (1)
Municipality of Midsayap, Cotabato (1)
CAR (2 sites)
Baguio City (Benguet) (1)
Kalinga (1)
CARAGA (3 sites)
Butuan City, Agusan Del Norte (1)
Surigao City (Surigao del Norte) (1)
Tandag City (Surigao del Sur) (1)
li
4
E. The Authorization Committee shall review the projected lane or
required PMVIC every 2 years or as the need arises, as
recommended by the LTO Assistant Secretary and upon approval
by the Authorization Committee.
I. Letter of Intent;
2. Profile of the applicant;
3. Duly accomplished application form which should be under
oath;
4. Location map and layout of the proposed PMVIC, including
dimensions;
5. Bank Certificate of Deposit, Letter of Credit or Committed Line
of Credit of not less than ten million pesos (P10,000,000.00)
valid and subsisting until the issuance of a Provisional
Authority or a denial thereof;
6. Transfer Certificate of Title in the name of the applicant or
Contract to Sell or Contract to Lease with a minimum lease
period of ten (10) years;
7
7. Payment of a non-refundable Application Fee in the amount of
Php. 50,000.00;
2e
8. Omnibus Sworn Statement stating the following:
8.1 That the authorized signatory of the
Applicant/Proponent is with full powers and
authority to file the application and sign any and
all documents pertaining to its PMVIC application;
8.2 that the applicant is not related by affinity or
consanguinity within the 3rd civil degree to any
member of the Authorization Committee, Technical
Working Group, Inspection Committee and
Secretariat;
8.3 that the applicant has no derogatory record in
government transactions;
8.4 that the applicant complies with labor and
standards law;
8.5 that the applicant shall organize and register as a
joint venture, partnership or a corporation, if
applicable;
8.6 that the PMVIC's Motor Vehicle Inspection
technician (MVIT) should have been trained in
TESDA, or in any TESDA accredited training center
or its equivalent;
8.7 that the applicant shall have at least one (1)
authorized MVIT per Light Vehicle Lane and one (1)
authorized MVIT per motorcycle lane;
8.8 that the applicant ensures that it has sufficient
and competent technical personnel and traffic
management staff to cater to its clientele, as well
as adequate security, parking area; and
8.9 that the PMVIS facility shall be fully operational
after its complete construction.
1. Registration Certificate
1.a For sole proprietorship, DTI Certificate of Registration with
accompanying Special Power of Attorney of the Authorized
Representative;
9
fi
1.b For corporation and partnership, Securities and Exchange
Commission Certificate of Registration, Articles of
Incorporation/ Partnership and By-Laws, specifying the name of
the authorized representative who must be an officer of the
corporation/partnership. Such authority should be with
accompanying Secretary's Certificate;
1.c For cooperative, Cooperative Development Authority
Certificate of Registration, Articles of Cooperation and By-Laws,
and Secretary's Certificate, specifying the name of the
authorized representative who must be an officer of the
cooperative;
2. Certified True Copy of Mayor's or Business Permit;
3. BIR Registration and Tax Identification Number;
4. Proof of orders of the required inspection equipment;
5. Building permit and copy of the building plan;
6. If applicable, Deed of Sale or Lease Contract with a minimum
period of ten (10) years.
10
C. Thereafter, the Checklist of Requirements and the documentary
requirements under Section 3.A hereof, (whether complete or
incomplete) received by the LTO Executive Director or Regional
Directors shall be forwarded to the Secretariat of the Authorization
Committee within three (3) working days after the Curing Period, if
applicable.
The applicant shall within forty-five (45) calendar days from receipt
of the Provisional Authority, submit the documents enumerated in
Section 3.B hereof.
11
ti
I
B. Documents and/or requirements submitted to comply with the
noted deficiencies shall be forwarded to the Authorization
Committee through the Secretariat and shall be deliberated by the
Authorization Committee within five (5) working days upon
recommendation by the Technical Working Group.
B. The Inspection Team shall submit the result of its inspection to the
Technical Working Group within three (3) calendar days from
completion of the inspection of the constructed PMVIC facility.
C. Within seven (7) calendar days from receipt of the Report from the
Inspection Team, the Technical Working Group shall evaluate the
Report, and present the same to the Authorization Committee.
12
I
D. Within seven (7) calendar days from the recommendation of the
Technical Working Group, the Authorization Committee shall grant
or deny the issuance of the Authorization Certificate.
2. Customer Service
2.a Personnel Competence
o
)1 13
SECTION 12. RENEWAL OF AUTHORIZATION
B. Each PMVIC shall have at least one (1) authorized MVIT per LV lane
and one (1) authorized MVIT per motorcycle lane.
4 14
SECTION 15. LIST OF INSPECTION EQUIPMENT
15
4
image of the car/plate number undergoing testing, as well as a
Television Screen to monitor the test.
HEADLIGHT TESTER
i. Automated headlight tester
ii. Automatic detection of the headlight
iii. Measurement of the luminous intensity, vertical
and horizontal deviation of the light beam
iv. Steel base mounted with rollers
v. Capable of measuring all types of headlight
vi. Automatic pass/fail judgment
vii. Operating conditions 0 - 40°C
viii. Sensor type — Photocell Camera system
ix. Process indicator (digital display/Color LCD)
x. PC interface or its equivalent for interfacing/ IT
connectivity
xi. Precise measurement of different light (LED,
Xenon) sources in real time
4 16
xvi. Capable to check brake balance from front-to-rear
wheel
3. SIDESLIP TESTER
i. Automated sideslip tester
ii. Automatic pass/fail judgment
iii. Type: Single/Dual plate configuration
iv. Maximum load per axle 3,000 kgs
v. Mounting plate: Heavy duty structural steel
vi. Sensor type e.g., Linear Transducer
vii. Beginning of measurement after optical passage
detection
viii. PC interface or its equivalent for interfacing/ IT
connectivity
ix. Fast measurement within 2 seconds precise
values, fast indication of toe out or in
4. SPEEDOMETER TESTER
i. Automated speedometer tester
ii. Type: Roller speedometer tester
iii. Sensor type: Digital speed sensor
iv. Frame: Heavy duty structural steel
v. Automatic pass/fail judgment
vi. 780mm-2200mm minimum-maximum track
vii. Maximum load per axle 3,000 kgs
viii. Lifting method: Hydraulic System/Pneumatic
System
5. EMISSION TESTER
i. Type: Gas analyzer on trolley for mobility
ii. 5 gas analyzer
iii. Automatic Pass/Fail judgement
iv. PC interface mandatory
v. Class 0 device compatible OIML R99/0 or its
equivalent
vi. Capable to test Euro 4 Engine Exhaust Gas
8. SUSPENSION TESTER
i. Type: Dual plate configuration
ii. Maximum load per axle - 3,500 kgs
iii. Frame: Heavy duty structural steel
iv. PC interface or its equivalent for
interfacing/IT connectivity
v. Network capable suspension tester
vi. With axle weighting capability
li
,7
monitor. Pass/fail judgement results are also
displayed on the same screen monitor.
B. FOR MOTORCYCLES/TRICYCLES
1. HEADLIGHT TESTER
i. Automatic detection of the headlight
ii. Measurement of the intensity, vertical and
horizontal deviation of the lightbeam
iii. Steel base mounted with rollers
iv. Capable of measuring all types of headlight
v. Automatic pass/fail judgment
vi. Operating conditions 0 - 40°C
vii. Sensor type - Photocell Camera system
viii. Process indicator (digital display/Color LCD)
ix. PC interface or its equivalent for interfacing/IT
connectivity
x. Precise measurement of different light (LED,
Xenon) sources in real time
3. EMISSION TESTER
i. Type: Gas analyzer on trolley for mobility
ii. 5 gas analyzer
iii. Automatic Pass/Fail judgement
iv. PC interface mandatory
v. Class 0 device compatible OIML R99/0 or its
equivalent
19
4. BAR CODE SCANNER
i. Type: Optical
ii. Nominal scan ratio: maximum speed 20 - 30
scan/sec.
iii. Sensor type: high input optics
iv. Built-in parameters are user configurable
6. PROCESS INDICATOR
i. Digital display/ Color LCD
ii. On stand /wall clamping
iii. Additional screen
iv. Instruction on test procedures given to the
inspector are displayed on a digital display screen
monitor.
7. SPEEDOMETER TESTER
i. Automated speedometer tester
ii. Type: Roller speedometer tester
iii. Sensor type: Digital speed sensor
iv. Frame: Heavy duty structural steel
v. Automatic pass/fail judgment
vi. Maximum test speed of 100 kph
vii. Maximum load per axle 500 kgs
viii. Lifting method: Hydraulic System/Pneumatic
System
20
STAGE 1. VEHICLE INFORMATION AND SPECIFICATION INPUT/
ABOVE CARRIAGE AND UNDER-CARRIAGE
INSPECTIONS
i. INSPECTION PROCEDURE:
The MVIT is required to log in through a finger scanning
device before every test.
1 In the absence of RFID, manual identification process and/or bar code reading shall be
i ..) conducted.
i 21
l•
iv. INSPECTION STANDARDS
a. Identity /construction
b. Lighting system and reflectors
c. Windshield/window glass
d. Wiper/washer
e. Chassis/motor number authenticity
f. Horn
g. Number plates
h. Floor board
i. Body appearance
j. Seat belts
k. Door/Hinges
I. Rear view/side mirror
m. Brake system/parking brake
n. Clutch system
o. Steering
p. Driver's/passenger's seat
q. Tires/wheels
r. Wheels bolts/nuts
s. Fuel tank/fuel tank cap
t. Mobile Air-conditioning System (MAC'S)
u. EWD
v. Length, width and height (Rebuilt and locally
assembled)
a. Computer
b. Wireless touch screen monitor
c. Tablet for test operation control
d. Bar code scanner/RFID reader
e. Axle Play Detector (Joint Play Tester)
f. Process indicator monitor
g. IP Camera (2)
23
2. STAGE 2.
a. Computer
b. Sideslip tester
c. Process indicator monitor
i. INSPECTION PROCEDURE:
a. Suspension Tester
b. Process indicator monitor
a. Computer
b. Roller brake tester (with axle weighing device)
c. Process indicator monitor
i. INSPECTION PROCEDURE:
a. Computer
b. Speedometer Tester
c. Process indicator monitor
25
3. STAGE 3.
i. INSPECTION PROCEDURE:
i.2.1 Computer
1.2.2 Headlight Tester
i.2.3 Process indicator monitor
26
0)
allow the insertion of sampling probe by at least
30 cm from the tailpipe outlet.
While the engine idles, the inspectors insert the
gas emission analyzer probe into the exhaust
pipe of the vehicle. This is operated
automatically and the measured data of the gas
analyzer are displayed. Results are transferred
to database after inspection is completed.
27
ii.2 TEST EQUIPMENT AND APPARATUS
ii.2.1 Computer
ii.2.2 Opacity meter
ii.2.3 Process indicator monitor
i. INSPECTION PROCEDURE:
i.1.1 Sonometer
i.1.2 Process indicator monitor
B. INSPECTION OF MOTORCYCLE
1. STAGE 1.
28
i
i.8 Type of Body/Color
i.9 Year Model
i.10 Gross Vehicle Weight
i.11 Net Capacity
i.12 Fuel Type
i.13 Classification
i..14 Denomination
ii.1 Computer
ii.2 Wireless touch screen monitor
ii.3 Tablet for test operation control
ii.4 Barcode scanner/RFID reader
ii.5 Process indicator monitor
ii.6 IP Camera
i.1 Handlebars
i.2 Spring
i.3 Lighting system and reflectors
i.4 Side mirror
L5 Brake system
L6 Clutch system
i.7 Tires/Wheels/Bolts/Nuts
i.8 Number plate
L9 Shock absorbers
L10 Frame
i.11 Horn
i.12 Head stem bearings
i.13 Fuel tank cap
29
ti
At
Passed/failed items are determined and the data is
transferred to the database.
i.1 Computer
i.2 Exhaust gas analyzer* (HC, CO, CO2, NOx, 02)
i.3 Process Indicator monitor
*The test equipment shall be capable of testing
other types of fuel that will be introduced in the
market {e. g. CNG/ ethanol.)
i. INSPECTION PROCEDURE
30
i.3 The result of the inspection is determined
and data is transferred to the database.
ii.1 Computer
ii.2 Headlight tester
ii.3 Process indicator
2. STAGE 2.
i. INSPECTION PROCEDURE:
ii.1 Computer
ii.2 Roller brake tester
ii.3 Process Indicator monitor
i.1 Computer
1.2 Speedometer tester
i.3 Process indicator monitor
31
2.3 SOUND LEVEL MEASUREMENT
i. INSPECTION PROCEDURE:
ii.1 Computer
ii.2 Sonometer
ii.3 Process indicator monitor
32
4
authorized representative of the PMVIC. The MVIR, CMVISC and
sticker will be designed by the LTO;
33
4
A'
N. The inspection shall be done in a well-ventilated building.
A. 1. IP CAMERA
The PMVIC shall provide an IP camera for each stage of
inspection for monitoring and recording of the inspection
process. The LTO shall be able to monitor the actual activities
of inspection online/real-time.
2. HD Camera
An HD Camera (1080p) shall be dedicated to record the whole
process (preferably from an isometric point of view) to be
shown real-time to the Customer Lounge. The recording shall
be available for 1 year from the date of inspection.
34
,‘
B. INTERPHONE COMMUNICATION SYSTEM
The PMVIC shall provide an interphone or a wireless
communication system so that the inspector can communicate
with each other at their respective stages of inspection.
E. LANE CAPACITY
The inspection lane is capable of operating in accordance with
the performance standards and criteria set forth in these
Guidelines.
F. TRAINING
All MVITs shall undergo training on the MVIC procedures and
processes. This will be conducted by the LTO and certificates
will
be issued upon training completion.
G. CALIBRATION
All specifications, brochures, and calibration process of all
inspection equipment shall be provided by the PMVIC and
submitted to the Authorization Committee. All equipment shall
undergo calibration every 6 months to ensure accuracy. The
calibration company shall be accredited by any government
agency such as Department of Trade and Industry (DTI).
35
I. SYSTEM RECOVERY
The PMVIC shall provide an operational system recovery plan;
indicate how service will be resumed, in case of power and
operational failure, and implement the same within one (1) day
from such failure.
N. AUTOMATIC ZEROING
To ensure data recording accuracy there shall be an automatic
resetting of data to zero before each test.
0. SECURE
The equipment must also prevent falsification of, or
unauthorized access to, test reports and data storage media.
This shall be accomplished by using an attached printer
utilizing secure certificates for compliance, at the end of the
inspection line.
P. HARDWARE/SOFTWARE REQUIREMENTS
The PMVIC's system and service must be equipped with all
essential hardware and software needed to support the
6)J 36
4
,t‘
inspection process. The PMVIC shall also provide
documentation of programs, including user manuals, program
descriptions, and the name and address of any outside
software manufacturers.
Q. INTERNET CONNECTION
The PMVIC should have an internet speed of at least 5MBPS
using a leased line.
R. SECURITY
I. SECURITY
The system must have multiple levels of security
(such as biometrics fingerprint and AFIS) and access
codes to regulate system access and to ensure the
protection of information from unauthorized access
(accidental or intentional), modification, destruction,
or disclosure. The multiple levels of security should
be relative to the different types of users. It shall
include:
2. DATA SECURITY
The PMVIC database shall not be accessed/open on-
site without prior notifications and approval by LTO.
Must ensure that all data collected or received by the
PMVIC becomes and remains the exclusive property
of the LTO. PMVICs shall not supply any report or
statistical information to any person or entity other
than the LTO without advance specific written
permission from the Authorization Committee.
37
3. INTERFACE SECURITY
The PMVIC's system must support all LTO IT System
communications interface requirements as related to
access security.
i
SECTION 26. ADJUDICATION PROCESS
This Memorandum Circular shall take effect fifteen (15) days following
the completion of its publication in the Official Gazette and/or in a
newspaper of general circulation and/or the filing of three (3) copies with
the UP Law Center pursuant to Memorandum Circular 11 dated 09
October 1992 of the Office of the President.
39
Annex "A"
Lay Out of a Three (3) - Stage PMVIC Equipment for Light Duty
Lane
Entrance
Stage '1
Computer
Above Carriage
Stage 2
Computer
Sideslip Tester
Brake Tester
Suspension Tester
Speedometer Tester
Stage 3
Computer
Gas Analyzer
Opacimeter
Headlight Tester
Sonometer
EXIT
40
Annex "B"
Lay Out of a Single - Stage PMVIC Equipment for Motor Cycle Lane
ENTRANCE
STAGE 1
Computer
Headlight Tester
Gas Analyzer
i
STAGE 2
Computer
Sonometer
Brake Tester
Speedometer
EXIT
41
Annex "B"
Lay Out of a Single - Stage PMVIC Equipment for Motor Cycle Lane
ENTRANCE
STAGE 1
Computer
Headlight Tester
Gas Analyzer
I
STAGE 2
Computer
Sonometer
Brake Tester
Speedometer
EXIT
42
Annex "B"
Lay Out of a Two (2) Stage PMVIC Equipment for Motorcycle Lane
ENTRANCE
Stage 1
Computer
Headlight Tester
Gas Analyzer
Stage 2
Computer
Sonometer
Brake tester
Speedometer
EXIT
43
Annex "C"
Pi
rts
0 Cl
• 6,
'.•
ro
0 H NN
31IS OW2/Al2 1V3IciAl
(..3 ru i--
- 0 —1 93 El) t— --I 0 x to ni .r. ra - 0
0 -1 , GJ „ --4
:
1 -" 0 f--
v) vi to > x rq P.- < 37' - ---c <
El m ri 7)
3, rr i fnor13)-
rrt = cl o-1:1X/Cr-
w ( 4 > c>i !''' I'' < 7"
c-1 r
9 3,71 3z., 7:. 0 P1 >
V36V 'VMS ON 'T
m rn m = z rti 2 21
m
-z x --1 (.4 z zi rri
<-1....
1 -t -I 0 0 < -I -I o 0 z
m n c.)
m co XI P1 P1 r _.1 Xi xl 23 PI
r/i. -f XI 0 0 --.1 rrl
--I rrif4
23 XI 0
Fri ri 5:: E.
CI
-I •-i 1
(
P7
0
-4 5 5 -1
r4 0 Pl Z. (/) (i) -I CI CI t:)
"'1 ---I M PI Z
"±'
u, '2 2
-0 0 14
-0 -0
.111 rrr m
n 0
5 'a' z
8
Z
44
▪
Annex "D"
113
VJ
II
•=11111=
u = 2= ri
fV
c HHH
O ❑ ❑
—
9 ❑ ❑
1
❑ ❑
P1 as
MOE
J
3Wa/A1a 1V3IdA1
44
LTO Form No.
Republic of the Philippines
Department of Transportation and Communications
LAND TRANSPORTATION OFFICE
East Avenue, Quezon City
MVIC
MOTOR VEHICLE INSPECTION SYSTEM REPORT
MVISR No. Date Issued Purpose of Inspection
ABOVE CARRIAGE Result UNDER CARRIAGE Result SIDE SLIP TEST Result.
Body Appearance Radiator
Chassis Engine Bracket/Mounting
Engine Engine Oil Leakage BRAKE TEST Result
Handle Bars Transmission Oil Leakage Sum Diff.
WiperMasher Steering Ball Joints FB
WindshietdMindow Glass Steering Leakages/Gear Box Mounting
Headlights Steering Idler/Sector Shaft RB1
Signal Lights (front) Front Shackle Eyes/Pins/Bushes
Signal Lights (rear) Stabilizers/Bushes PB1
Parking Lights (front) King Pins and Bearings
Parking Lights (rear) Front Suspension Joints/Bushes RB2
Brake Lights Rear Suspension Joints/Bushes
Back-up Lights Rear Linkages PB2
Clearance Lights Brake Hoses/Pipes/Cylinders
Number Plate/Lights Fuel Hoses/Pipes RB3
Hazard Lights Spring U Bolts/Nuts
Reflectors Spring Clips PB3
Interior Lights Shock Absorbers
Top Light (Taxi) Rear Shackle Eyes/Pins/Bushes SPEEDOMETER TEST Result
Seat Belts Drive Shaft Bolts/Nut
Horn Differential Oil Leakage
Door/Hinges Propeller Shaft Coupling SUSPENSION TEST Result
Floor Board Exhaust Pipes and Silencer
Side Mirror/Rear View Chassis Frame
Clutch System Chassis Cross Member HEAD LIGHT TEST Result
Brake System Body Floor Board Lum. LIR U/D
Driver's /Passenger's Seat Power Steering LH
Steering Parking Brake Wire
Tires/Wheels MAC RH
Wheel Bolts/Nuts Others
Fuel Tank/Cap SOUND LEVEL TEST Result
Panel Gauges
EWD
Others EMISSION TEST Result
Opacity
HC
MVIS Test Conducted By:
CO
[ ] Approved
1 1 Disapproved REMARKS
Chief-MVIC
"OMNIBUS SWORN STATEMENT"
AFFIDAVIT
9. The PMVIC's Motor Vehicle Inspection Technician (MVIT) should have been trained
in a TESDA accredited center or its equivalent
10. [Name of Applicant] shall have at least one (1) authorized MVIT per Light Vehicle
Lane and one (1) authorized MVIT per motorcycle lane;
11. [Name of Applicant] ensures that it has sufficient and competent technical personnel
and traffic management staff to cater to its clientele, as well as adequate security,
parking area;
12.The PMVIS facility shall be fully operational after its complete construction; and
13.[Name of Applicant] did not give or pay directly or indirectly, any commission,
amount, fee, or any form of consideration, pecuniary or otherwise, to any person or
official, personnel or representative of the government in relation to its PMVIC
application.
48
SUBSCRIBED AND SWORN to before me this day of [month] [year] at [place of
execution], Philippines. Affiant/s is/are personally known to me and was/were identified by
through competent evidence of identity as defined in the 2004 Rules on Notarial Practice
(A.M. No. 02-8-13-SC). Affiant exhibited to me his/her [insert type of government
identification card used], with his/her photograph and signature appearing thereon, with No.
and his/her Community Tax Certificate No. issued on
at
Doc. No.
Page No.
Book No.
Series of
49
Department of Transportation
LAND TRANSPORTATION OFFICE
East Ave., Quezon City
DATE:
APPLICANT'S NAME:
ADDRESS:
50
18. Brief description of the MVIS equipment to be installed with manufacturer's brochures,
manuals and certificate of delivery schedule from the manufacturer.
7. Registration Certificate
1.a For sole proprietorship, DTI Certificate of Registration with accompanying Special
Power of Attorney of the Authorized Representative;
1.b For corporation and partnership, Securities and Exchange Commission Certificate
of Registration, Articles of Incorporation/ Partnership and By-Laws, specifying the
name of the authorized representative who must be an officer of the
corporation/partnership. Such authority should be with accompanying Secretary's
Certificate;
1.c For cooperative, Cooperative Development Authority Certificate of Registration,
Articles of Cooperation and By-Laws, and Secretary's Certificate, specifying the
name of the authorized representative who must be an officer of the cooperative;
8. Certified True Copy of Mayor's or Business Permit;
9. BIR Registration and Tax Identification Number;
10. Proof of orders of the required inspection equipment;
11. Building permit and copy of the building plan;
12. If applicable, Lease Contract with a minimum period of ten (10) years.
SUBSCRIBED AND SWORN to before me this day of [month] [year] at [place of execution],
Philippines. Affiantls is/are personally known to me and was/were identified by through competent evidence
of identity as defined in the 2004 Rules on Notarial Practice (A.M. No. 02-8-13-SC). Affiant exhibited to me
his/her [insert type of government identification card used], with his/her photograph and signature
appearing thereon, with No. and his/her Community Tax Certificate No.
issued on at
51
52